Hilti HIT-CT 1 User manual

Hilti HIT-CT 1
Instruction for use en
Gebrauchsanleitung de
Mode d‘emploi fr
Istruzioni per l'uso it
Handleiding nl
Manual de instrucciones es
Instruções de utilização pt
Brugsanvisning da
Bruksanvisning no
Bruksanvisning sv
Käyttöohje
Instrukcja obslugi pl
Návodnapoužívanie sk
Návodkpoužití cs
Navodila za uporabo sl
Naudojimo instrukcija lt
Lietošanas instrukcija lv
Kasutusjuhend et
Инструкцияпоприменению ru
Contains: dibenzoyl peroxide (B)
Toxic to aquatic life with long lasting
effects.(B)
Do not get in eyes, on skin, or on
clothing.
IF ON SKIN: Wash with plenty of water.
IF IN EYES: Rinse cautiously with
water for several minutes. Remove
contact lenses, if present and easy
to do. Continue rinsing.
Contains dibenzoyl peroxide.
May produce an allergic reaction.
(B)

Hilti HIT-CT 1
2
en Read the safety instructions and product information before using the product. 24/25
de Vor der Anwendung die Sicherheitsvorschriften und Produktinformationen lesen. 26/27
fr Avant utilisation, bien lire les prescriptions de sécurité ainsi que les informations
produit. 28/29
it Prima di procedere all‘utilizzo, leggere le norme di sicurezza e le informazioni
relative al prodotto. 30/31
nl Voor gebruik de veiligheidsvoorschriften en de productinformatie lezen. 32/33
es Lea las indicaciones de seguridad y la información de producto antes de utilizarlo. 34/35
pt Antesdautilização,lerachadesegurançaeosdadosinformativossobreo
produto. 36/37
da Læs sikkerhedsforskrifterne og produktinformationen igennem før brug. 38/39
no Les sikkerhetsforskriftene og produktinformasjonen før bruk. 40/41
sv Läs säkerhetsföreskrifterna och produktinformationen före användning. 42/43
Lue turvamääräykset ja tuotetiedot ennen tuotteen käyttämistä. 44/45
pl Przedzastosowaniemnależyzapoznaćsięzprzepisamidotyczącymi
bezpieczeństwaiinformacjąoprodukcie. 46/47
sk Predpoužitímsiprečítajtebezpečnostnépredpisyainformáciuovýrobku. 48/49
cs Předpoužitímsipřečtětetentonávodkpoužitíabezpečnostnípředpisy. 50/51
sl Preduporabopreberitevarnostnepredpiseininformacijeoizdelku. 52/53
lt Priešnaudojantbūtinaperskaitytisaugosinstrukcijas,bendrąjąinformacijąir
įspėjamuosiusnurodymus. 54/55
lv Pirmslietošanasjāizlasadrošībasnoteikumi,vispārīgāinformācijaunbrīdinājumi. 56/57
et Enne kasutamist lugege läbi kasutusnõuded, üldine teave ja märkused. 58/59
ru Használatelőttolvassaelabiztonságielőírásokatésatermékinformációkat. 60/61

Hilti HIT-CT 1
3
d0hef
1HAS-U
Rebar 10 … 32 mm 80 … 700 mm 10
2HAS-U 12 … 18 mm 80 … 192 mm 11
3HAS-U
Rebar 10 … 20 mm 64 … 160 mm 13
4HAS-U
Rebar 12 … 32 mm 80 … 700 mm 14
5HAS-U 12 … 18 mm 80 … 192 mm 15

Hilti HIT-CT 1
4
twork tcure
en Dry concrete Water saturated
concrete Waterlledboreholei
n concrete Submerged borehole in
concrete Hammer drilling en Hollow drill bit Uncracked
concrete Cracked concrete Temperature of
concrete Working time Curing time
de Trockener Beton Wassergesättigter
Beton Wassergefülltes
Bohrloch in Beton Unterwasser Bohrloch
in Beton Hammerbohren de Hohlbohrer Ungerissener
Beton Gerissener Beton Temperatur des
Betons Verarbeitungszeit Aushärtezeit
fr Béton sec Béton saturé d'eau Trou dans le béton
rempli d’eau Trou dans le béton
immergé Perçage avec
percussion fr Foret creux Béton non lézardé Béton lézardé Température du
béton Temps de
manipulation Temps de
durcissement
it Calcestruzzo secco Calcestruzzo saturo
d'acqua Foro pieno d'acqua
nel calcestruzzo Foro sott'acqua nel
calcestruzzo Foratura con
percussione it Punta cava Calcestruzzo non
fessurato Calcestruzzo
fessurato Temperatura del
calcestruzzo Tempo di
lavorazione Tempo di
indurimento
nl Droog beton Met water verzadigd
beton Met water gevuld
boorgat in beton Boorgat in beton
onder water Boorhameren nl Holle boor Niet-gesch-eurd
beton Gescheurd beton Temperatuur van
het beton Verwerkingstijd Uithardingstijd
es Hormigón seco Hormigón saturado
de agua Taladro lleno de
agua en hormigón Taladro sumergido en
hormigón Taladrado con
martillo es Taladro con broca
hueca y aspiración Hormigón no
surado Hormigónsurado Temperatura del
hormigón Tiempo de
tratamiento Tiempo de
fraguado
pt Betão seco Betão saturado de
água Furo em betão
cheio de água Furo debaixo de água
em betão Perfurar de martelo pt Broca de coroa oca Betão não
ssurado Betãossurado Temperatura do
betão Tempo de
trabalho Tempo de cura
total
da Tør beton Vandmættet beton Vandfyldt borehul i beton Borehul under vand i
beton Hammerboring da Hulbor Ikke-revnet beton Revnet beton Betonens
temperatur Bearbejdningstid Hærdningstid
no Tørr betong Vannmettet betong Vannfylte borehull i betong Undervanns borehull i
betong Hammerboring no Hulbor Ikke sprukket
betong Sprukket betong Betongens
temperatur Bearbeidingstid Herdetid
sv Torrbetong Vattenmättad betong Vattenfyllt hål i betong Hål i betong under
vattenytan Hammarborrning sv Rörborr Ej sprucken
betong Sprucken betong Betongens
temperatur Bearbetningstid Härdningstid
Kuiva betoni Veden kyllästämä
betoni Vedellä täyttynyt
porareikä betonissa Vedenalainen porareikä
betonissa Poraus iskulla Onteloterä Ei-lohkeillut betoni Lohkeillut betoni Betonin lämpötila Käsittelyaika Kovettumisaika
pl Beton suchy Betonnasyconywodą Wywiercony otwór w betonie
wypełnionymwodą Wywiercony otwór w
betoniepodwodą Wiercenie udarowe pl Wiertłootworowe Betonniespękany Betonspękany Temperatura
betonu Czasżelowania Czas utwardzania
sk Suchýbetón Vodounasýtený
betón Vodounaplnenýotvor
vyvŕtanýdobetónu Otvoryvyvŕtanédo
betónu pod vodou Vŕtaniespríklepom sk Dutývrták Betónbeztrhlín Betónstrhlinami Teplota betónu Časspracovania Časnavytvrdnutie
cs suchýbeton mokrýbeton otvory vyvrtané do
betonunaplněnévodou otvory vyvrtané do
betonu pod vodou vrtáníspříklepem cs Dutývrták nepopraskaný
beton popraskanýbeton Teplota betonu doba
zpracovatelnosti dobavytvrzení
sl Suh beton Vlaženbeton Z vodo napolnjena
izvrtina v beton Podvodna izvrtina v beton Udarno vrtanje sl votli svede Nerazpokan beton Razpokan beton Temperatura
betona Reakcijskičas Časstrjevanja
lt Sausas betonas Šlapias betonas Vandens pripildyta
gręžtinėskylėbetone Gręžtinėskylė
betone po vandeniu Smūginisgręžimas lt Tuščiavidurisgrąžtas Nesutrūkinėjęs
betonas Sutrūkinėjęs
betonas Betono
temperatūra Naudojimotrukmė Kietėjimotrukmė
lv Sauss betons Arūdenipiesātināts
betons Arūdenipiepildīts
urbumsbetonā Zemūdensurbumsbetonā Triecienurbšana lv Dobais urbis Nesaplaisājis
betons Saplaisājisbetons Betona
temperatūra Apstrādeslaiks Sacietēšanaslaiks
et kuivbetoon veega küllastunud
betoon veega täidetud
puuritud auk betoonis veealune puurava
betoonis löökpuurimine et oonsad puur pragudeta betoon pragudega betoon betooni
temperatuur töötlemisaeg tardumisaeg
ru Сухойбетон Водонасыщенный
бетон Отверстиевбетоне,
заполненноеводой Отверстиевбетоне
подводой Ударноесверление ru Пустотелыйбур Нерастрескав
шийсябетон Растрескав
шийсябетон Температура
бетона Время
схватывания Время
отвердевания

Hilti HIT-CT 1
5
twork tcure
en Dry concrete Water saturated
concrete Waterlledboreholei
n concrete Submerged borehole in
concrete Hammer drilling en Hollow drill bit Uncracked
concrete Cracked concrete Temperature of
concrete Working time Curing time
de Trockener Beton Wassergesättigter
Beton Wassergefülltes
Bohrloch in Beton Unterwasser Bohrloch
in Beton Hammerbohren de Hohlbohrer Ungerissener
Beton Gerissener Beton Temperatur des
Betons Verarbeitungszeit Aushärtezeit
fr Béton sec Béton saturé d'eau Trou dans le béton
rempli d’eau Trou dans le béton
immergé Perçage avec
percussion fr Foret creux Béton non lézardé Béton lézardé Température du
béton Temps de
manipulation Temps de
durcissement
it Calcestruzzo secco Calcestruzzo saturo
d'acqua Foro pieno d'acqua
nel calcestruzzo Foro sott'acqua nel
calcestruzzo Foratura con
percussione it Punta cava Calcestruzzo non
fessurato Calcestruzzo
fessurato Temperatura del
calcestruzzo Tempo di
lavorazione Tempo di
indurimento
nl Droog beton Met water verzadigd
beton Met water gevuld
boorgat in beton Boorgat in beton
onder water Boorhameren nl Holle boor Niet-gesch-eurd
beton Gescheurd beton Temperatuur van
het beton Verwerkingstijd Uithardingstijd
es Hormigón seco Hormigón saturado
de agua Taladro lleno de
agua en hormigón Taladro sumergido en
hormigón Taladrado con
martillo es Taladro con broca
hueca y aspiración Hormigón no
surado Hormigónsurado Temperatura del
hormigón Tiempo de
tratamiento Tiempo de
fraguado
pt Betão seco Betão saturado de
água Furo em betão
cheio de água Furo debaixo de água
em betão Perfurar de martelo pt Broca de coroa oca Betão não
ssurado Betãossurado Temperatura do
betão Tempo de
trabalho Tempo de cura
total
da Tør beton Vandmættet beton Vandfyldt borehul i beton Borehul under vand i
beton Hammerboring da Hulbor Ikke-revnet beton Revnet beton Betonens
temperatur Bearbejdningstid Hærdningstid
no Tørr betong Vannmettet betong Vannfylte borehull i betong Undervanns borehull i
betong Hammerboring no Hulbor Ikke sprukket
betong Sprukket betong Betongens
temperatur Bearbeidingstid Herdetid
sv Torrbetong Vattenmättad betong Vattenfyllt hål i betong Hål i betong under
vattenytan Hammarborrning sv Rörborr Ej sprucken
betong Sprucken betong Betongens
temperatur Bearbetningstid Härdningstid
Kuiva betoni Veden kyllästämä
betoni Vedellä täyttynyt
porareikä betonissa Vedenalainen porareikä
betonissa Poraus iskulla Onteloterä Ei-lohkeillut betoni Lohkeillut betoni Betonin lämpötila Käsittelyaika Kovettumisaika
pl Beton suchy Betonnasyconywodą Wywiercony otwór w betonie
wypełnionymwodą Wywiercony otwór w
betoniepodwodą Wiercenie udarowe pl Wiertłootworowe Betonniespękany Betonspękany Temperatura
betonu Czasżelowania Czas utwardzania
sk Suchýbetón Vodounasýtený
betón Vodounaplnenýotvor
vyvŕtanýdobetónu Otvoryvyvŕtanédo
betónu pod vodou Vŕtaniespríklepom sk Dutývrták Betónbeztrhlín Betónstrhlinami Teplota betónu Časspracovania Časnavytvrdnutie
cs suchýbeton mokrýbeton otvory vyvrtané do
betonunaplněnévodou otvory vyvrtané do
betonu pod vodou vrtáníspříklepem cs Dutývrták nepopraskaný
beton popraskanýbeton Teplota betonu doba
zpracovatelnosti dobavytvrzení
sl Suh beton Vlaženbeton Z vodo napolnjena
izvrtina v beton Podvodna izvrtina v beton Udarno vrtanje sl votli svede Nerazpokan beton Razpokan beton Temperatura
betona Reakcijskičas Časstrjevanja
lt Sausas betonas Šlapias betonas Vandens pripildyta
gręžtinėskylėbetone Gręžtinėskylė
betone po vandeniu Smūginisgręžimas lt Tuščiavidurisgrąžtas Nesutrūkinėjęs
betonas Sutrūkinėjęs
betonas Betono
temperatūra Naudojimotrukmė Kietėjimotrukmė
lv Sauss betons Arūdenipiesātināts
betons Arūdenipiepildīts
urbumsbetonā Zemūdensurbumsbetonā Triecienurbšana lv Dobais urbis Nesaplaisājis
betons Saplaisājisbetons Betona
temperatūra Apstrādeslaiks Sacietēšanaslaiks
et kuivbetoon veega küllastunud
betoon veega täidetud
puuritud auk betoonis veealune puurava
betoonis löökpuurimine et oonsad puur pragudeta betoon pragudega betoon betooni
temperatuur töötlemisaeg tardumisaeg
ru Сухойбетон Водонасыщенный
бетон Отверстиевбетоне,
заполненноеводой Отверстиевбетоне
подводой Ударноесверление ru Пустотелыйбур Нерастрескав
шийсябетон Растрескав
шийсябетон Температура
бетона Время
схватывания Время
отвердевания

Hilti HIT-CT 1
6
d0
hef
/ hef std
ddf
HAS-U / HIT-V
⌀d[mm] ⌀d0[mm] hef std[mm] hef[mm] ⌀df[mm] Tmax[Nm]
M8 10 80 64…96 9≤ 10
M10 12 90 80…120 12 ≤ 20
M12 14 110 96…144 14 ≤ 40
M16 18 125 128…192 18 ≤ 80
M20 22 170 160…240 22 ≤ 150
M24 28 210 192…288 26 ≤ 200
h
ef

Hilti HIT-CT 1
7
d0
hef
d
Rebar
⌀d[mm] ⌀d0[mm] hef[mm]
810 64…250
12 64…700
10 12 80…250
14 80…700
12 14 96…250
16 96…700
14 18 112…700
16 20 128…700
18 22 144…500
20 25 160…500
22 28 176…500
24 32 192…500
25 32 200…500
h
ef

Hilti HIT-CT 1
8
*TE-CD 12 & 14: min. 61 l/s VC 20 / 40 -Y no battery mode. HIT-DL: hef > 250 mm
⌀ ⌀ HAS-U
HIT-V Rebar HIT-OHC
HIT-OHW
HIT-RB HIT-SZ HIT-DL/-A
d0[mm] d0[mm] d[mm] [mm] [mm] [mm] Art. No.
– 10 8 8 10 − −
387551
12 12 10 8/10 12 12 12
14 14 12 10/12 14 14 14
16 16 −12 16 16 16
18 18 16 14 18 18 18
20 20 −16 20 20 20
22 22 20 18 22 22 20
387552
25 25 −20 25 25 25
28 28 24 22 28 28 25
32 32 − 24 / 25 32 32 32
Hilti VC 20/40 (-Y)
+
HIT-RE-M
hef
Art. No. Art. No.
min. 57 l/s 337111 <800 mm 381215 6 bar/90psi
≥800mm − 140 m³/h

Hilti HIT-CT 1
9
[°C]
twork tcure tcure
–5…0 ≦60min ≧6h ≧12h
1…5 ≦40min ≧3h ≧6h
6…10 ≦25min ≧2h ≧4h
11…20 ≦10min ≧90min ≧180min
21…30 ≦4min ≧75min ≧150min
31…40 ≦2min ≧60min ≧120min
≥+5°C

10
6 bar/
90 psi
6 bar/
90 psi
d0
h
ef
6 bar/
90 psi
2x 2x 2x
2 3 4
1
A B C
hef 60…250mm 60…700mm 60…700mm
16 17 18 19
1
Rebar
HAS-U /
HIT-V
d0:
10 … 32 mm
hef:
64 … 700 mm
…
6 7
8 8

11
6 bar/
90 psi
6 bar/
90 psi
d0
h
ef
6 bar/
90 psi
2x 2x 2x
2 3 4
1
A C
16 18 19
2HAS-U /
HIT-V
d0:
12 … 18 mm
hef:
80 … 192 mm
8 8
6

12
6 bar/
90 psi
4x 4x
4x
2 3 4
A C
16 18 19
3
Rebar
HAS-U /
HIT-V
d0:
10 … 20 mm
hef:
64 … 160 mm
8
d0
h
ef
1
…
6 7

13
4Rebar
HAS-U /
HIT-V
d0:
12 … 32 mm
hef:
64 … 700 mm
d0
hef
TE-CD
TE-YD
A B C
60…250mm 60…700mm 60…700mm
16 17 18 19
8
1

14
A C
16 18 19
5HAS-U /
HIT-V
d0:
12 … 18mm
hef:
80 … 192 mm
d0
hef
TE-CD
TE-YD
1
8

15

16
HDM 330
HDM 500
HDE 500-A
tcure 9
twork twork
6
7
6
7
3 4
5 5.A
5.B
2⁄32⁄3
100 %
1 2
tcure 9
9 9
330 ml: 2x
500 ml: 3x
Tmax
6
A
hef:
≤250mm
HAS-U/HIT-V
Rebar HIT-RE-M 8

17
tcure 9
Tmax
6 7
B
hef:
60...700 mm HAS-U/HIT-V
Rebar
HIT-RE-M
HIT-SZ 8
HDM 330
HDM 500
HDE 500-A
1 2
2⁄31⁄3
hef
twork twork
6
7
6
7
55.A
5.B
2⁄3
100 %
3 4
tcure 9
9
330 ml: 2x
500 ml: 3x
9

18
C
hef:
60…700mm HAS-U/HIT-V
Rebar
HIT-RE-M
HIT-SZ
HIT-OHW
HIT-OHC
8
d d
76
HDM 330
HDM 500
HDE 500-A
1 2
~ 2⁄3
~ 1⁄3
hef
34
5
330 ml: 2x
500 ml: 3x

19
9
10
9
10
8 8
twork twork
tcure 9
tcure 9
9 9
Tmax 6

Hilti HIT-CT 1
20
Adhesive anchoring system for rebar and anchor fastenings in concrete
▶Prior to use of product, follow the instructions for use and the safety precautions.
Hilti HIT-CT 1
Contains: Dibenzoylperoxid (B)
(B)
H411 Toxic to aquatic life with long lasting effects.
P262 Do not get in eyes, on skin or on clothing
P302+P352 IF ON SKIN: Wash with plenty of water.
P305+P351+P338 IF IN EYES: Rinse cautiously with water for several minutes.
Remove contact lenses, if present and easy to do. Continue rinsing.
EUH208 Contains dibenzoyl peroxide. May produce an allergic reaction.
Disposal considerations
Empty packs:
▶Leave the mixer attached and dispose of via the local Green Dot recovery system
▶or EAK waste material code: 150102 plastic packaging
Full or partially emptied packs:
▶Mustbedisposedofasspecialwasteinaccordancewithofcialregulations.
– EAK waste material code: 08 04 09* waste adhesives and sealants containing organic solvents
or other dangerous substances.
– or EAK waste material code: 20 01 27* paint, inks, adhesives and resins containing dangerous
substances.
Content: 330ml / 11.1.oz 500ml / 16.9.oz Weight: 600 g/21.1 oz 910 g/32.1 oz
Hilti accepts no liability for damage or failure caused by:
– Storageandtransportnotinaccordancewiththespeciedconditions
– Failure to observe the instructions for use and setting data
– Inadequate design of the anchor points
– Inadequate load bearing capacity of the base material
– Incorrect use
– OtherinuencesofwhichHiltiisnotawareoronwhichHiltihasnoinuence,e.g.usewith
products from a third party
Table of contents
Languages:
Other Hilti Tools manuals

Hilti
Hilti BX 3-ME User manual

Hilti
Hilti ST-SG 5.5 User manual

Hilti
Hilti DD VP-U User manual

Hilti
Hilti DX 860-ENP User manual

Hilti
Hilti DD 30-W User manual

Hilti
Hilti DX351BT User manual

Hilti
Hilti TE 700-AVR User manual

Hilti
Hilti TE DRS-B User manual

Hilti
Hilti DX 351-CT User manual

Hilti
Hilti DX 5 GR User manual

Hilti
Hilti NPR 32XL-22 User manual

Hilti
Hilti DX 5 User manual

Hilti
Hilti DCG 500-S User manual

Hilti
Hilti DX 5 GR User manual

Hilti
Hilti GX-IE User manual

Hilti
Hilti Nuron CD 4-22 User manual

Hilti
Hilti C4/36-90 User manual

Hilti
Hilti TE 6-CL User manual

Hilti
Hilti NPR 32-22 User manual

Hilti
Hilti DX 76 User manual