
ELECTRICAL
WIRING
3. ELECTRICAL
WIRING
Tools and Instruments – One set of wiring
t
ools
,
electrical tester (Clamp
me
t
er)
.
Schedule Check – Confirm that the field
selec
t
ed
electrical components (main power switch,
f
uses
,
wires, conduit connections, wire terminals)
are
properly selected according to "Electrical Data"
in
Technical Catalog Ⅰ, and ensure that they
comply
with national and local codes. It is
recommended
that the main power switch be locked at the
OFF
position, to prevent against accidental supply
o
f
the power during unit
servicing
.
Service Panel – Access to the magnetic
swi
t
ch
box is provided from the service panel, which
is
fixed with screws (see the panel location in
t
he
Operation
I
ns
t
ruc
t
ions
.
)
3.1 Main Power Wiring
Procedures
Confirm that electrical power is not
being
supplied to the installation location prior to
any
electrical installation
work
.
1. Install the field-supplied main switch box at
t
he
properly selected
loca
t
ion
.
2. Install conduit connectors in the hole for
power
wiring (knockout
holes)
.
3. Lead the main power wires and the
ear
t
hing
wire through the connector to the
screw
terminals for main power and earthing in
t
he
magnetic switch box. The neutral wire to
220V
power supplies should also be led
t
hrough
the
connector. Firmly connect the wires
wi
t
h
wire terminals to the unit screw
t
erminals
R(L1), S(L2) and T(L3) for 220V
power
supplies according to Fig. 6 or the wiring
label
attached to the magnetic switch
box
.
A scroll compressor is equipped. Because
t
ha
t
the rotation direction of the orbiting scroll of
t
he
HITACHI scroll type compressor is
f
ixed
,
therefore a reverse & single phase
sequence
protection relay is equipped in this unit. If
each
phase R, S or T of t h e power source
is
incorrectly connected, the compressor does
no
t
start due to the activation of the reverse &
single
phase sequence protection relay. Therefore,
in
order to check the correct wiring connection,
t
he
utilization of a phase sequence indicator
is
recommended when the unit is started
a
ft
er
installation of the
uni
t.
(1) If the phase is wrong, exchange two of
t
he
three wires connected from the main
power
source to the main terminals of the unit
as
indicated with dotted lines, and then check
t
he
rotation direction of the phase
sequence
indicator once again. Do not exchange the
wires in the unit in order to protect
t
he
compressor against the reversal
ro
t
a
t
ion
.
Unit
Side
R S
T
(2) Do not operate the compressor by
depressing
the button of the magnetic switch for
t
he
compressor
.
A three-phase condenser fan motor is equipped;
therefore, the fan motor rotation should be
checked. Interchange two of the three main power
source wires, if incorrect rotation is detected during
initial start-up.
3.2 Control
Wiring
Install the optional room thermostat at a
sui
t
able
location in the space to be
air-condi
t
ioned
.
Connect
the control wires between the
uni
t
terminals and the
thermostat terminals
according
to Fig. 6 or the
wiring
label
.
Fig. 6. Field Wiring
Connection