FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
Copyright © Huawei Technologies Co., Ltd.
5.3 (Optional) Installing Step Ladders..............................................................................................................................37
6 Installing External Pipes for Smart Cooling Products.........................................................40
7 Removing Transport Protection Materials.............................................................................43
7.1 Removing Transport Protection Materials for Smart Cooling Products .....................................................................43
7.2 Removing the Cabinet Sliding Base Fasteners...........................................................................................................46
7.3 Removing Sliding Door Fasteners..............................................................................................................................47
8 Installing Devices Inside Pre-fab. Modules ..........................................................................50
8.1 Installing Power Supply and Distribution Devices.....................................................................................................50
8.1.1 (Optional) Installing Battery Packs..........................................................................................................................50
8.1.2 Installing Batteries...................................................................................................................................................52
8.2 (Optional) Installing the Electric Heating Belt ...........................................................................................................53
8.3 Installing Monitoring Devices....................................................................................................................................57
8.3.1 (Optional) Installing ECC800 Accessories..............................................................................................................57
8.3.2 (Optional) Installing the WiFi antenna ....................................................................................................................62
8.3.3 (Optional) Installing a Pad.......................................................................................................................................63
8.3.4 (Optional)Installing the iBAT..................................................................................................................................64
8.4 Installing Fire Extinguishing Devices.........................................................................................................................66
8.4.1 Installing CE-Certified Fire Extinguishing Devices................................................................................................66
8.4.1.1 (Optional) Installing the Fire Cylinder (CE).........................................................................................................66
8.4.1.2 Connecting the Cable to the Battery of the Fire Control Panel.............................................................................70
8.4.2 (Optional) Connecting a Cable to the ASD Power Box Battery..............................................................................72
8.4.3 Installing an External Horn Strobe ..........................................................................................................................73
9 Installing Cables Outside Pre-fab. Modules .........................................................................75
9.1 Connecting Input Power Cables for Pre-fab. Modules ...............................................................................................75
9.2 (Optional) Connecting Generator Start/Stop Cables (ATS Input)...............................................................................76
10 Removing Transport Protection Materials from Fire Extinguishing and Monitoring
Devices .............................................................................................................................................79
11 Installation Verification...........................................................................................................81
A A Basic Installation Operations ..............................................................................................83
A.1 Cable Installation Techniques....................................................................................................................................83
A.1.1 Cabling Rules..........................................................................................................................................................83
A.1.2 Measuring Cables ...................................................................................................................................................84
A.1.3 Laying Out Cables..................................................................................................................................................85
A.1.4 Routing Cables Through a Plastic-coated Metal Hose............................................................................................86
A.1.5 Mounting Cables on the Cable Tray .......................................................................................................................87
A.1.6 Routing Cables into Feeder Windows.....................................................................................................................89
A.1.6.1 Installing DPJ End Connectors............................................................................................................................89
A.1.6.2 Installing Waterproof Metal Connectors..............................................................................................................92
A.1.7 Attaching Cable Labels...........................................................................................................................................94