manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. KingShield
  6. •
  7. Lantern
  8. •
  9. KingShield ELTSLED65NM Manual

KingShield ELTSLED65NM Manual

This unit should be fitted by a qualified electrician in accordance with the appropriate
national/IEE wiring regulations. Switch off mains supply before installation and maintenance.
This product must not be modified. Any modification will negate any Safety Mark Approvals and
may render the product unsafe. GreenBrook accepts no responsibility for modified products.
This product must be installed in accordance with these instructions. This fitting should not be
installed in close proximity to any external source of heat or covered with any heat insulating
material, air flow around the fitting should not be restricted. Note any minimum distances to
adjacent surfaces. This unit should be connected to the lighting supply circuit, or fused at a
maximum of 5A.
This unit is a non-maintained (NM suffix), self-contained emergency luminaire.
To confirm model type, check the data provided on the fitting and packaging.
ELTSLED65NM Non-maintained: Incorporates two 54 LED lamps which are
illuminated only under mains failure conditions
SAFETY
GENERAL DESCRIPTION
INSTALLATION INSTRUCTIONS
EMERGENCY LUMINAIRE TEST RECORD SHEET
LUMINAIRE TYPE/REF:_________________________________
DATE OF INSTALLATION:_______________________________
LOCATION:________________________
Issue no: 703749
PLEASE KEEP THESE INSTRUCTIONS SAFE FOR FUTURE REFERENCE
Month Test
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
FUNCTIONAL
THREE HOUR
1st ear 2nd year 3rd year 4th year 5th year
1
2
3
4
5
6
7
8
9
10
11
12
Signed Signed Signed Signed
Signed
Date Date Date DateDate
Inst ll tion / Oper ting
Instructions for ELTSLED65NM
WEST ROAD . HARLOW
ESSEX . CM20 2BG . UK
[email protected]
WWW.GREENBROOK.CO.UK
Follow these instructions carefully to ensure safe and reliable operation. Retain this leaflet for
future reference. The emergency luminaire should be connected to a stable and permanent
mains supply of the correct rated voltage and frequency as stated on the product specification
label. This may be from the lighting supply circuit, or fused at a maximum of 5A. To facilitate
testing a fused spur box can be included in the unswitched permanent live supply.
Class I. This product must be earthed.
All switching etc, shall comply with BS 5266 Part 1. Unless specifically permitted, emergency
luminaires should not be connected or controlled by any energy management device.
Before commencing installation, ensure that the electricity supply is disconnected. Surge
suppressors may be required at the point of connection to the supply wiring when installing
luminaires to MICC cable.
1. Undo the four cover retaining screws and remove the front cover.
2. Select and remove a knock out corresponding with the conduit and / or cable run and secure
a suitable bush within the hole to prevent damage to the incoming cable.
3. Mount the case in position on a suitable surface ensuring an adequate airflow will be
maintained around it, or secure to wall using the four hole dimensions on the back case.
Routine Inspection & Test Procedure
All tests should be undertaken during daylight hours at times of minimum risk and be in accordance with
the recommendations of BS 5266 Part 1: 2005.
DAILY - Check that the three green LED battery charging / lamp failure indicators are illuminated.
MONTHLY - In addition to the daily check, a functional test through simulation of mains supply failure
should be carried out to confirm lamps are illuminated from the battery cell pack supply. This test need only
be approximately 30 seconds. It should not exceed one quarter of the rated
luminaire duration.
SIX - MONTHLY - In addition to the monthly test, the lamps should be illuminated from the battery cell
pack supply for a continuous period of at least one hour.
THREE - YEARS - In addition to the monthly tests the lamps should be illuminated from the battery cell
pack supply for the full rated duration of the luminaire. (180 minutes).
ANNUALLY THEREAFTER - As above, i.e, Check that the luminaire operates for the full rated duration (180
minutes).
At the end of each test period the mains supply should be restored and a check made to ensure that all
three green LED battery charging/lamp failure indicators are illuminated.
SPECIFICATION
MAINTENANCE
Servicing should only be carried out after the luminaire has been made electrically safe.
Lamps should be replaced at set intervals for maximum system integrity, use only lamps of the
correct type and rating and follow the lamp manufacturers instructions.
Cleaning should be carried out at regular intervals to ensure that dirt does not accumulate to an
extent that will impair the electrical and / or thermal safety of the luminaire. Regular cleaning will
also ensure that the optical performance is maintained.
Battery packs should be replaced when the luminaire fails to meet its rated duration, regardless all
batteries must be replaced after 4years service.
The disposal of components from the luminaire may require consultation with local authorities.
The disposal of batteries is subject to Local Authority Regulations, and the By-Laws Department
for disposal of toxic waste should be consulted for specific guidance. Battery cell packs must not
be incinerated. Do not dispose with household waste, subject to conditions in the WEEE directive.
Audible Alarm
• Battery ailure: One repeated beep
• Illumination Failure: Repeated two beep cycle
• Auto test ailure: Repeated three beep cycle
Auto Fault Monitoring
When connected to the mains supply and a system fault is detected, the audible alarm will sound
continously for the first 10 minutes and the failure/charging indicator will flash. After 10 minutes
the alarm will beep once every minute for the next hour. After the first hour it will beep every
twenty minutes upto twenty four hours. After this the alarm will cease and the fault indicator will
flash only.
Auto-test Switch
• Manual Test: Press the button on the PCB for 3seconds, the emergency light will come on for
5minutes to check illumination.
• Auto Test: Press the button for 1second, this initiates the ‘Auto Test’ sequence. The emergency
light will light automatically once every 90 days for test duration of 1 hour. If the fitting fails to
light for 1hour the audible alarm will give a three beep sequence as mentioned in the audible
alarm section above. If the 1hour test is satisfactory the fitting will return to normal operation.
5. Mark the battery cell pack with the date of installation and connect the battery.
6. Refit the front cover, taking care to ensure that no wires are trapped and that all fastenings are
secure.
7. To adjust the position of the lamp heads, loosen the axis screws before positioning so as not
to cause excess strain on the lamp fixings.
WARNING
The battery cell pack must be CONNECTED before the mains is switched on.
Failure to comply with these installation instructions may result in irreparable damage to the
main circuit.
DO NOT HIGH-VOLTAGE INSULATION TEST THIS UNIT, OR THE LIGHTING SYSTEM WITH
THIS UNIT CONNECTED.
COMMISSIONING & TESTING
Class I. This product must be earthed.
Terminal (L): This is the live supply to the charging circuit and must be permanent
and unswitched.
Terminal ( E): This is for the earth and must be connected.
Terminal (N): This is the neutral supply and must be permanent.
Colour code: Brown=Live Blue=Neutral Green/ ellow=Earth
Conductor Space Size 1.0mm2 - 2.5mm2Solid or Stranded.
Ensure that no strands of bare wire have escaped the terminals.
4. Bring the cable into position and make the correct electrical connections as follows:
Note: The ELTSLED65NM uses screwless terminals.
NON-MAINTAINED
NEUTRAL
(BLUE) PERMANENT LIVE
(BROWN)
E
NL
EARTH
GREEN/YELLOW
Input Voltage: 220/240V AC, 50/60Hz, 3.2W
LED Power: 4.7W, 93.8 lm/W
Fuse installed or replacement: 0.5A, 250VAC
Battery Installed or replacement: 3.6V/6Ah Ni-Cd
LED Built-in: LED 54 + 54 pcs
IP Rating: IP65
Operating Environmental Temperature: 0°C - 40°C
Re-charging Time: 24 hours
Emergency Duration: More than 3hours
Switch on the mains supply, check that ‘Charge ON’, ‘Lamp 1’ and ‘Lamp 2’ green LED
indicators are lit.
Allow a brief time for initial partial charging and then isolate the permanent live supply by
removing the fuse from the fused spur box. Check to ensure the lamps are illuminated from the
battery cell pack supply. After a further 60 hours on a continuous charge, and only at a safe and
appropriate time, mains failure should be simulated to ensure that full duration rating is
achieved. Thereafter the recharge time is 24 hours.
Function of LED Indic tors
1. Auto test indicator
2. Failure/charging indication
3. Lamphead 1indicator
4. Lamphead 2indicator
1.
2.
3.
4.

Other KingShield Lantern manuals

KingShield GSS User manual

KingShield

KingShield GSS User manual

KingShield PL6PIRW Manual

KingShield

KingShield PL6PIRW Manual

KingShield PLLED3B Manual

KingShield

KingShield PLLED3B Manual

KingShield Corvus Series User manual

KingShield

KingShield Corvus Series User manual

KingShield PLLED3PIRB User manual

KingShield

KingShield PLLED3PIRB User manual

Popular Lantern manuals by other brands

stellar labs Solar Monaco SW-356CL user manual

stellar labs

stellar labs Solar Monaco SW-356CL user manual

Gama Sonic 117i90080 instruction manual

Gama Sonic

Gama Sonic 117i90080 instruction manual

Gama Sonic GS-114F instruction manual

Gama Sonic

Gama Sonic GS-114F instruction manual

SOMFY LanternLITE Wiring Diagrams & Programming Instructions

SOMFY

SOMFY LanternLITE Wiring Diagrams & Programming Instructions

BEGA 33 160 Instructions for use

BEGA

BEGA 33 160 Instructions for use

ETC ARCP1 installation manual

ETC

ETC ARCP1 installation manual

Kichler Lighting LYNDON manual

Kichler Lighting

Kichler Lighting LYNDON manual

Twin-Star International POWERHEAT 10ILHU117-01 manual

Twin-Star International

Twin-Star International POWERHEAT 10ILHU117-01 manual

Quoizel Buckley BUK9007MBK installation guide

Quoizel

Quoizel Buckley BUK9007MBK installation guide

Next LIQUID LIGHT DROP 4 instructions

Next

Next LIQUID LIGHT DROP 4 instructions

SPITTLER SL764 EB LED Assembly instructions

SPITTLER

SPITTLER SL764 EB LED Assembly instructions

Eaton Streetworks ULA Utility LED Acorn installation instructions

Eaton

Eaton Streetworks ULA Utility LED Acorn installation instructions

Prismatibro Prisma Light Eliott manual

Prismatibro

Prismatibro Prisma Light Eliott manual

Kichler Lighting 39536 manual

Kichler Lighting

Kichler Lighting 39536 manual

Clevertronics LP Supalite CFLLED Series Installation & maintenance instructions

Clevertronics

Clevertronics LP Supalite CFLLED Series Installation & maintenance instructions

Nature Power 24801 instruction manual

Nature Power

Nature Power 24801 instruction manual

InoTec BNP DICE Series operating instructions

InoTec

InoTec BNP DICE Series operating instructions

RUSTA HEXAGON manual

RUSTA

RUSTA HEXAGON manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.