
Figures
1. Storage block co ponents . . . . . . . . . 6
2. Co pute node co ponents. . . . . . . . . 7
3. ThinkAgile CP slide box contents. . . . . . 12
4. Slides . . . . . . . . . . . . . . . . 13
5. Left slide rear installation . . . . . . . . . 13
6. Left slide front installation. . . . . . . . . 14
7. Front latches on slides . . . . . . . . . . 14
8. ThinkAgile CP enclosure . . . . . . . . . 15
9. ThinkAgile CP enclosure installation . . . . 15
10. Enclosure installation into rack. . . . . . . 16
11. Screw pin types included with rail kit . . . . 17
12. Installing the rail in the rack . . . . . . . . 18
13. Re oval of side cover . . . . . . . . . . 19
14. Installing the enclosure into the rack . . . . 19
15. Installing screws on front of enclosure . . . . 20
16. Reinstalling the side cover . . . . . . . . 20
17. Attaching ounting brackets to switch . . . 26
18. Securing switch to rack posts . . . . . . . 26
19. Installing power cord retention clip . . . . . 27
20. BMC anage ent network connectivity in a single
Interconnect configuration . . . . . . . . 29
21. SIC co pute node and network interconnect
connections . . . . . . . . . . . . . . 30
22. SIC storage block and network interconnect
connections . . . . . . . . . . . . . . 30
23. Custo er data center connection: single
direct link . . . . . . . . . . . . . . . 31
24. Custo er data center connection: dual direct
link . . . . . . . . . . . . . . . . . 33
25. BMC anage ent network connectivity in a
redundant interconnect configuration . . . . 35
26. RIC co pute node and network interconnect
connections . . . . . . . . . . . . . . 36
27. RIC storage block and network interconnect
connections . . . . . . . . . . . . . . 37
28. Inter-interconnect link network
connectivity . . . . . . . . . . . . . . 37
29. Custo er data center network
connection . . . . . . . . . . . . . . 38
© Copyright Lenovo 2018 v