8048-B, 2011-10-25/GA
Page 1 of 3
Manitowoc Cranes, Inc.
Manitowoc, Wisconsin 54220 U.S.A.
2250 SERIES 2
2250 SERIES 3
Luffing Jib Raising Procedure
Fixed Jib No. 140 On Luffing Jib No. 133 or No. 133A On
Boom No. 44 With Heavy Lift Top
2250 SERIES 2 must be equipped with 209,200 Lb. (94 890 kg) crane counterweight and 60,000 Lb. (27 220 kg) carbody
counterweight and 2250 SERIES 3 must be equipped with 249,200 Lb. (113 040 kg) crane counterweight and 120,000 Lb.
(54 430 kg) carbody counterweight for raising and lowering various boom, luffing jib and fixed jib combinations. Refer to fixed jib
assembly No. 192320 or No. 193022 and luffing jib rigging assembly No. 192086 for boom, luffing jib and fixed jib make-up of
inserts, straps, pendants, backstays and miscellaneous parts, etc. Refer to Jib Rigging Guide for No. 140 fixed jib in Operators
Manual for detailed raising and lowering instructions.
Two methods may be used to raise and lower boom, luffing jib and fixed jib combinations.
A. Layout Jack-Knife Method With Fixed Jib Attached
Raising:
Boom, luffing jib and fixed jib are assembled in layout, end to end, position. Raise fixed jib strut and attach pendants and
backstays. Attach fixed jib stop to fixed jib butt and temporarily tie off to fixed jib strut. Boom, luffing jib and fixed jib
must be inline over front of blocked crawlers prior to raising boom and luffing jib. Slowly raise boom until luffing jib
stop strut is just clear of ground. Attach luffing jib stop pendants and unpin luffing jib stop inner strut from retracted
position. Slowly raise boom until luffing jib stop strut is fully extended and pins engaged (approximately 168 degree
boom to luffing jib angle). Boom is then raised while luffing jib point and fixed jib point wheels are allowed to roll on
ground. Tension should be applied to luffing jib hoist to keep luffing jib strut off luffing jib during boom raising. Boom
up until boom to luffing jib angle reaches value specified in table. Tighten luffing jib suspension with luffing jib hoist.
Boom and luffing jib are then raised together using boom hoist while fixed jib point wheels roll on ground. Continue
raising until fixed jib suspension tightens. Attach fixed jib stop to luffing jib top. Boom, luffing jib and fixed jib are then
raised together using boom hoist until boom reaches 83 degree angle. Raise luffing jib to radius within capacity chart.
Several combinations do not allow fixed jib to leave ground when boom reaches 83 degrees. When this occurs, fixed jib
stop must be attached as suspension tightens after luffing jib is raised using luffing jib hoist. Then continue raising
luffing jib to radius within capacity chart. Fixed jib radius must be within capacity chart before swinging over side of
machine.
Lowering:
Position boom at 83 degrees with boom and luffing jib and fixed jib inline over front of blocked crawlers prior to
lowering luffing jib. Lower luffing jib until boom to luffing jib angle reaches value specified in table. If fixed jib point
wheels contact ground prior to luffing jib reaching angle specified in table, remove fixed jib stop from luffing jib top and
temporarily tie off to fixed jib strut at this time, and then continue to lower luffing jib until boom to luffing jib angle
specified in table is reached. If fixed jib point wheels have not contacted ground, lower boom until fixed jib point wheels
contact ground. Remove fixed jib stop from luffing jib top and temporarily tie off to fixed jib strut. Lower boom as fixed
jib point wheels roll on ground. Lower boom until luffing jib point wheels contact ground. Continue to lower boom
while luffing jib and fixed jib roll along ground. Keep enough tension on luffing jib hoist to keep luffing jib strut off
luffing jib. Stop lowering boom when luffing jib stop pendants start to go into tension (approximately 168 degree boom
to luffing jib angle). Disengage luffing jib stop strut pins and lower boom to retract luffing jib stop inner strut. Pin strut
in retracted position and unpin luffing jib stop pendants. Rotate luffing jib stop struts forward and lower boom and
luffing jib to ground.
REFERENCE
ONLY!
8048-B, 2011-10-25/GA
Page 2 of 3
Manitowoc Cranes, Inc.
Manitowoc, Wisconsin 54220 U.S.A.
2250 SERIES 2
2250 SERIES 3
Luffing Jib Raising Procedure
Fixed Jib No. 140 On Luffing Jib No. 133 or No. 133A On
Boom No. 44 With Heavy Lift Top
B. Layout Jack-Knife Method With Fixed Jib Attached Before Luffing Jib Lift-Off
Raising:
Boom and luffing jib are assembled in layout, end to end, position. Boom and luffing jib must be inline over front of
blocked crawlers prior to raising boom and luffing jib. Attach fixed jib backstay pendants to luffing jib insert and place
on ground. Slowly raise boom until luffing jib stop strut is just clear of ground. Attach luffing jib stop pendants and
unpin luffing jib stop inner strut from retracted position. Slowly raise boom until luffing jib stop strut is fully extended
and pins engaged (approximately 168 degree boom to luffing jib angle). Boom is then raised while luffing jib point
wheels are allowed to roll on ground. Tension should be applied to luffing jib hoist to keep luffing jib strut off luffing jib
during boom raising. Boom up until boom to luffing jib angle reaches value specified in table. Tighten luffing jib
suspension with luffing jib hoist. Attach fully assembled fixed jib to luffing jib. Attach fixed jib backstays to fixed jib
strut. Attach fixed jib stop to fixed jib butt and temporarily tie off to fixed jib strut. Boom and luffing jib are raised
together using boom hoist while fixed jib point wheels roll on ground. Continue raising until fixed jib suspension
tightens. Attach fixed jib stop to luffing jib top. Boom, luffing jib and fixed jib are then raised together using boom hoist
until boom reaches 83 degree angle. Raise luffing jib to radius within capacity chart. Several combinations do not allow
fixed jib to leave ground when boom reaches 83 degrees. When this occurs, fixed jib stop must be attached as suspension
tightens after luffing jib is raised using luffing jib hoist. Then continue raising luffing jib to radius within capacity chart.
Fixed jib radius must be within capacity chart before swinging over side of machine.
Lowering:
Position boom at 83 degrees with boom and luffing jib and fixed jib inline over front of blocked crawlers prior to
lowering luffing jib. Lower luffing jib until boom to luffing jib angle reaches value specified in table. If fixed jib point
wheels contact ground prior to luffing jib reaching angle specified in table, remove fixed jib stop from luffing jib top and
temporarily tie off to fixed jib strut at this time, and then continue to lower luffing jib until boom to luffing jib angle
specified in table is reached. If fixed jib point wheels have not contacted ground, lower boom until fixed jib point wheels
contact ground. Remove fixed jib stop from luffing jib top and temporarily tie off to fixed jib strut. Lower boom as fixed
jib point wheels roll on ground. Lower boom until luffing jib point wheels contact ground. Remove fixed jib from luffing
jib. Lower boom while luffing jib rolls along ground. Keep enough tension on luffing jib hoist to keep luffing jib strut off
luffing jib. Stop lowering boom when luffing jib stop pendants start to go into tension (approximately 168 degree boom
to luffing jib angle). Disengage luffing jib stop strut pins and lower boom to retract luffing jib stop inner strut. Pin strut
in retracted position and unpin luffing jib stop pendants. Rotate luffing jib stop struts forward and lower boom and
luffing jib to ground.
REFERENCE
ONLY!
8048-B, 2011-10-25/GA
Page 3 of 3
Manitowoc Cranes, Inc.
Manitowoc, Wisconsin 54220 U.S.A.
2250 SERIES 2
2250 SERIES 3
Luffing Jib Raising Procedure
Fixed Jib No. 140 On Luffing Jib No. 133 or No. 133A On
Boom No. 44 With Heavy Lift Top
Boom, luffing jib and fixed jib combinations in table require layout jack knifing to a specified boom to luffing
jib angle for raising and lowering.
Boom length shown with (a) requires only the middle three sheaves in lower boom point. All other sheaves
must be removed from lower boom point.
When boom catwalks are attached, boom length shown with (b) requires lower boom point to be removed.
WITH OR WITHOUT BOOM CATWALKS
Maximum Boom, Luffing Jib And Fixed Jib Lengths Lifted Unassisted
Over Front Of Blocked Crawlers
Using Layout Jack-Knife Method
Boom Length Luffing Jib No. 133
or No. 133A Fixed Jib No. 140 Boom to Luffing
Jib Angle
Feet Meters Feet Meters Feet Meters Degrees
2250 SERIES 2
180 54.9 160 - 200 48.8 - 61.0 40 - 120 12.2 - 36.6 60
190 57.9 160 - 200 48.8 - 61.0 40 - 120 12.2 - 36.6 60
(a)(b) 200 61.0 160 - 200 48.8 - 61.0 40 - 120 12.2 - 36.6 60
2250 SERIES 3
180 54.9 160 - 200 48.8 - 61.0 40 - 120 12.2 - 36.6 90
190 57.9 160 - 200 48.8 - 61.0 40 - 120 12.2 - 36.6 90
(a)(b) 200 61.0 160 - 200 48.8 - 61.0 40 - 120 12.2 - 36.6 60
Load blocks, hook and weight ball on ground until boom, luffing jib and fixed jib are erected.
REFERENCE
ONLY!

This manual suits for next models

1

Other Manitowoc Construction Equipment manuals

Manitowoc National Crane NBT30H-2 User manual

Manitowoc

Manitowoc National Crane NBT30H-2 User manual

Manitowoc MLC165-1 User manual

Manitowoc

Manitowoc MLC165-1 User manual

Manitowoc 16000 User manual

Manitowoc

Manitowoc 16000 User manual

Manitowoc 2250 MAX-ER 2000 User manual

Manitowoc

Manitowoc 2250 MAX-ER 2000 User manual

Manitowoc 999 User manual

Manitowoc

Manitowoc 999 User manual

Manitowoc 4000W User manual

Manitowoc

Manitowoc 4000W User manual

Manitowoc GROVE GMK 5095 User manual

Manitowoc

Manitowoc GROVE GMK 5095 User manual

Manitowoc CD25 User manual

Manitowoc

Manitowoc CD25 User manual

Manitowoc MLC165 User manual

Manitowoc

Manitowoc MLC165 User manual

Manitowoc National Crane NC1400H User manual

Manitowoc

Manitowoc National Crane NC1400H User manual

Manitowoc Grove GMK6300L-1 User manual

Manitowoc

Manitowoc Grove GMK6300L-1 User manual

Manitowoc GROVE GMK4090 User manual

Manitowoc

Manitowoc GROVE GMK4090 User manual

Manitowoc National Crane NBT60L User manual

Manitowoc

Manitowoc National Crane NBT60L User manual

Manitowoc MLC90A-1 User manual

Manitowoc

Manitowoc MLC90A-1 User manual

Manitowoc GROVE GMK3060 User manual

Manitowoc

Manitowoc GROVE GMK3060 User manual

Manitowoc MLC300 User manual

Manitowoc

Manitowoc MLC300 User manual

Manitowoc 999 Installation and user guide

Manitowoc

Manitowoc 999 Installation and user guide

Manitowoc National Crane 600H User manual

Manitowoc

Manitowoc National Crane 600H User manual

Manitowoc 16000 Series 2 User manual

Manitowoc

Manitowoc 16000 Series 2 User manual

Manitowoc Grove 5540F User manual

Manitowoc

Manitowoc Grove 5540F User manual

Manitowoc 16000 User manual

Manitowoc

Manitowoc 16000 User manual

Manitowoc Grove GMK4070E User manual

Manitowoc

Manitowoc Grove GMK4070E User manual

Manitowoc GHC 75 User manual

Manitowoc

Manitowoc GHC 75 User manual

Manitowoc National Crane NBT40 Series User manual

Manitowoc

Manitowoc National Crane NBT40 Series User manual

Popular Construction Equipment manuals by other brands

Case DV201 Service manual

Case

Case DV201 Service manual

Parkside PCM 62 A1 Operating and safety instructions

Parkside

Parkside PCM 62 A1 Operating and safety instructions

Hydro Mobile M2 Series owner's manual

Hydro Mobile

Hydro Mobile M2 Series owner's manual

Case 1107 DX Service manual

Case

Case 1107 DX Service manual

REMS Swing operating instructions

REMS

REMS Swing operating instructions

Fayat Group DYNAPAC SD2500W Operation & maintenance manual

Fayat Group

Fayat Group DYNAPAC SD2500W Operation & maintenance manual

TMG TMG-MVR50 product manual

TMG

TMG TMG-MVR50 product manual

WAGNER PLAST COAT HP 30 operating manual

WAGNER

WAGNER PLAST COAT HP 30 operating manual

Fayat Group BOMAG BM 500/15 Service manual

Fayat Group

Fayat Group BOMAG BM 500/15 Service manual

Auto Crane NEXSTAR III owner's manual

Auto Crane

Auto Crane NEXSTAR III owner's manual

PROPOINT 8708067 user manual

PROPOINT

PROPOINT 8708067 user manual

IMT CMD.CTRL Operator's manual

IMT

IMT CMD.CTRL Operator's manual

Modulate Straight 1824 manual

Modulate

Modulate Straight 1824 manual

HOGG & DAVIS ODP 100-3 manual

HOGG & DAVIS

HOGG & DAVIS ODP 100-3 manual

Innotech STA-10 manual

Innotech

Innotech STA-10 manual

Altrad Belle Maxi 140 Operator's manual

Altrad

Altrad Belle Maxi 140 Operator's manual

IMER USA MIX 60 PLUS instruction manual

IMER USA

IMER USA MIX 60 PLUS instruction manual

Stone WolfPac 3100 Operator's manual

Stone

Stone WolfPac 3100 Operator's manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.