
INSTALLATION & OPERATION MANUAL 10148 REV 4 (11/22)
PAGE 6 OF 16
I
IMMEDIATELY INSPECT FOR SHIPPING DAMAGE
Immediately after unpacking, check for possible shipping damage. If the tilting skillet is found to be damaged,
save the packaging material and contact the carrier within 15 days of delivery.
Before installing, verify that the electrical service agrees with the specifications on the rating plate located
on the right side panel as you face the front of the skillet. If the supply and equipment requirements do not
agree, contact your dealer.
The installation location must allow adequate clearances for servicing and proper operation. A minimum front clearance of
36”, and rear clearance of 6” is required.
Your Tilting Skillet must be installed in accordance with:
1. Provincial and local codes, or in the absence of local codes, with: C.S.A. C22.1 Canadian Electrical Code, Part 1, or
in the U.S.A. state and local codes, or in the absence of local codes, with the National Electrical Code ANSI/NFPA-70
(latest edition).
2. ANSI NFPA Standard #96, “Vapor Removal from Cooking Equipment,” (latest edition), available from the National Fire
Protection Association, Batterymarch Park, Quincy, MA, 02269.
1. Place skillet in the installation position.
2. Place a carpenter’s level on top of the skillet pan and turn the adjustable feet to level skillet side-to-side and front-to-
back.
page 4.) Insert proper anchoring devices (not supplied).
5. Place skillet back in the installation position.
6. Place carpenter’s level on top of skillet and re-level side-to-side and front-to-back.
9. If faucet is provided, connect water supply and check operation.
10. Turn power on and check for proper operation.
I
WARNING
ELECTRICAL GROUNDING INSTRUCTIONS
Electrical and grounding connections must comply with the applicable portions of the National Electrical Code
and/or other local codes.