
Table of figures ■■■■■■■■■■■■■■■■■■■■■■
VI ■■■■■■■■ 894 Professional CVS
Table of figures
Figure 1 894 Professional CVS front ................................................................ 7
Figure 2 894 Professional CVS rear .................................................................. 8
Figure 3 RDE measuring head - Overview ...................................................... 10
Figure 4 Measuring head connector plate ..................................................... 11
Figure 5 Measuring head insert ..................................................................... 13
Figure 6 Tubing connector (measuring head arm) .......................................... 14
Figure 7 Do not touch the drive disk ............................................................. 17
Figure 8 Inserting the measuring head .......................................................... 17
Figure 9 Removing the stopper from the pipetting opening ........................... 18
Figure 10 Removing the measuring head cover ............................................... 18
Figure 11 Inserting the gas inlet ...................................................................... 20
Figure 12 Connecting the gas inlet .................................................................. 21
Figure 13 Removing the protective cap from the electrode tip ......................... 22
Figure 14 Tightening the electrode tip to the driving axle ................................ 22
Figure 15 Working electrode, installed ............................................................ 23
Figure 16 Fastening the drive belt ................................................................... 23
Figure 17 Connecting the working electrode ................................................... 24
Figure 18 Assembling the reference electrode with the electrolyte vessel ......... 25
Figure 19 Connecting a reference electrode .................................................... 26
Figure 20 Connecting the auxiliary electrode ................................................... 27
Figure 21 Inserting the four-way micro dosing tip ........................................... 29
Figure 22 Screwing a PTFE capillary to a dosing unit ........................................ 29
Figure 23 Sealing the PTFE capillary of a four-way micro dosing tip ................. 30
Figure 24 Inserting a PEEK capillary into the measuring head ........................... 31
Figure 25 Screwing a capillary to a dosing unit ................................................ 33
Figure 26 Inserting a piece of FEP tubing into the measuring head .................. 35
Figure 27 Installing the measuring head cover ................................................. 36
Figure 28 Inserting the stopper in the pipetting opening ................................. 37
Figure 29 Installing a bottle cap with pieces of tubing on a rinsing canister ..... 38
Figure 30 Connecting the five-way tubing connector to a waste canister ........ 39
Figure 31 Connecting FEP tubing to the dosing unit (auxiliary solution) ........... 40
Figure 32 Connecting a dosing device to an MSB socket ................................. 43
Figure 33 Manual operation - Electrical connection ......................................... 51
Figure 34 Semiautomated operation – Electrical connections .......................... 52
Figure 35 Semiautomated operation – Tubing setup with two dosing units ..... 53
Figure 36 Semiautomated operation – Tubing setup with four dosing units ..... 54
Figure 37 Semiautomated operation – Tubing setup – Details 894 Professional
CVS ................................................................................................. 55
Figure 38 Automated operation – Electrical connections ................................. 57
Figure 39 Automated operation – Tubing setup – Overview ............................ 59
Figure 40 Automated operation – Tubing setup – Details 894 Professional
CVS ................................................................................................. 60
Figure 41 Automated operation – Tubing setup – 800 Dosino details .............. 61
Figure 42 Automated operation – Tubing setup – 858 Professional Sample Pro-
cessor details – Guide chain ............................................................. 62