CONTROL CABLE
STEP 1
PREPARE DESIRED LOCATION
FOR SMART/ONE CONTROL
A.
Remove template peel-oft
paper and attach the template
to the wall in desired location.
Drill and cutout as shown. Be
exact. Clean all burrs and
dust.
TEMPLATE
B.
Route the control cable
from the wall cutout to the
steam generator. Locate
the end of the cable that
has the single black
connector at the wall
cutout. Locate the other
end with the white connec-
tor at the steam generator.
CONNECTOR
CONTROL CABLE
STEP 5
APPLY SILICONE TO SMART/ONE
CONTROL
A.
Make sure that the area around the cut out or electrical box is
clean and free of debris.
B.
Run a bead of silicone (RTV sealant) along all four edges of
the gasket as required to create seal between gasket and wall.
SILICONE
BEAD
SILICONE
TUBE
A.
Connect the control cable (the end with the white
connector) to the steam generator connector.
STEAM GENERATOR
WHITE
4-PIN PLUG
WHITE
/ 4-PIN
JACK
•
MOUNT CONTRO
L
WALL WITH
SCREWS
A.
Make sure the "THIS END UP" label is pointed upward.
B.
Fully insert the supplied screws into the face plate holes and
align with holes in wall.
C.
Keep the screws aligned and push the control against the wall
until the adhesive gasket sticks.
D.
Tighten the screws until the gasket is firmly secured aaainst
the wall.
E.
Remove excess silicone.
F.
Remove the "THIS END UP" sticker and discard.
9
0
'
MOUNTING
SCREWS
STEP 6
CONTROL *
-
-=.110
CABLE
CONTROL
FACE PLATE
STEP 2
CONNECT THE CONTROL CABLE
TO THE STEAM GENERATOR
CAUTION!!! TURN OFF ALL POWER TO THE STEAM GENERAT
UNTIL STEP 3C. FAILURE TO DISCONNECT POWER MAY
RESULT IN AN INOPERABLE CONTROL