
TABLE OF CONTENTS
UINTRODUCTION 1U
UGetting Started…U1
UMAIN MENU SCREENU1
UUSER LEVEL ACCESSU2
UQUICK ACCESSU3
UHARDWARE INSTALLATION 4U
UBASIC REQUIREMENTS FOR ON-SITE PREPARATIONU4
UGENERAL DIMENSIONSU4
UPOWER SUPPLY WIRINGU4
UMain Power WiringU4
UElectric TestU5
UHARDWARE LAYOUTU6
UWIRINGU7
UDigital OutputU7
UDigital InputsU9
UAnalog InputsU10
UNETWORK COMMUNICATION WIRINGU13
UExpansion Unit ConnectionsU13
UExpansion Unit SettingsU16
UPC and Inter-Controller ConnectionsU17
USYSTEM INSTALLATION AND CONFIGURATION 18U
UFIRMWARE UPGRADEU18
UAccessing the ApplicationU18
URunning the ApplicationU18
UCOLD STARTU20
USYSTEM INSTALLATION (MENU 8.1)U21
UDigital Outputs (Menu 8.1.1)U21
UDigital Inputs (Menu 8.1.2)U22
UAnalog Inputs (Menu 8.1.3)U23
UView Hardware Checklist (Menus 8.1.4 & 7.10.7)U24
U8.2 CLIMATE ZONE CONFIGURATIONU25
UZone Configuration (Menu 8.2.11)U25
UMeasuring Box Allocation (Menu 8.2.10)U26
UVent (Menu 8.2.1)U27
UScreen (Menu 8.2.2)U29
UHeating (Menu 8.2.3)U31
UMisting (Menu 8.2.4)U33
UFan & Pad (Menu 8.2.5)U35
UAir Circulation (Menu 8.2.6)U37
UCrop Protection (Menu 8.2.8)U38
ULight (Menu 8.2.9)U39
U8.3 BOILER CONFIGURATIONU40
UTECHNICAL SPECIFICATIONS 41U
UPOWER SUPPLY SPECIFICATIONS 41U
UWARRANTY 42U