7. Take care of surge and electric shock which may occur by power supply to
EUT while the simulator is operating.
【Warning against human body and operation】
8. Be sure to ground FG (Frame Ground) terminal of this simulator.
(A ground plane can be used.)【Warning against human body and connection】
9. Do not connect a connecting bar, cable, etc. to any terminal which is
unnecessary for setting test conditions. Do not mistake the setting and
connection of connecting bars, cables, etc. Otherwise, you may receive an
electric shock from high voltage or the internal equipment and connected
equipment may be damaged.
【Warning against human body, operation and connection】
10. When lowering the set voltage of this simulator by means of SURGE ADJ
Knob, discharge extra energy beforehand; otherwise causing danger. (High
voltage accumulated in the internal condensers etc. will not lower even if you
rotate the knob, unless high voltage is discharged.) There are 2 ways of
discharging extra energy in this case: one is rotating SURGE ADJ knob
counterclockwise fully to ‘0V(0A)’and turning off the high voltage circuit (by
pressing HIGH VOLTAGE OFF switch). The other is with rotating SURGE ADJ
knob counterclockwise gradually pressing the Trigger switch or External
trigger switch several times while seeing the meter until it reads the intended
set value. In this method, pay fully attention to surge output coming from
HOT (SURGE OUT) terminal or LINE OUT terminal which is being output as
the surge indicator indicates.
【Warning against human body and operation】
11. (Discharge will be finished by opening the acrylic door by means of the safety
device.) However, when changing the connecting bar set position to change the
waveform, changing the surge polarity and/or ending the test, be sure to
short-circuit between each terminal and GND terminal (for about 5 seconds)
using the supplied Discharge probe beforehand. If this discharging process is
insufficient, you may receive an electric shock from residual high voltage.
【Warning against human body, operation and connection 】
12. The AC line for EUT is free from the devices for safety such as HIGH VOLTAGE
OFF switch or the acrylic door. It can be operated independently with using the
LINE ON breaker. When you set the surge injection part, be sure to turn off the
LINE ON breaker to cut off AC power supply and discharge residual electricity
with the attached Discharge probe, and then set that part. Failure to follow this
instruction risks an electric shock by the power supply to EUT (AC100V~240V).
【Warning against human body, operation and connection 】
13. When operating this simulator, never neglect to watch the equipment. When
leaving this simulator, be sure to check that the meter reads ‘0V(0A)’and the
high voltage circuit is turned off (by pressing the HIGH VOLTAGE OFF Switch).
Otherwise, any other person or facilities related to test equipment may be
exposed to danger.
【Warning against human body, operation and environment】