
Heat Exchanger Replacement Procedure
Diagram
14. Replacing SS HE
Note: If you are not replacing SS HE then,
you can skip this step and set SS HE aside.
(1) Remove old Gasket between SS HE and CU HE Exhaust
Box and replace with new one
(2) OD model only ;
Remove Gasket on the front of SS HE and place
on new one
15. Remove CU HE
(1) Remove 12 screws holding Burner to CU HE
(2) Separate Burner from CU HE
16. Remove the heat exchanger components from
old heat exchanger and put on new heat exchanger
(1) Front side: Freeze Prevention Heater
(2) Right side: High Limit Switch and Freeze Prevention
Heater (Secure to put Freeze Prevention Heater on
same position)
(3) Left side: Freeze Prevention Heater
(Secure to put Freeze Prevention Heater on
same position)
(4) Back side: Thermistor - Scale Detection*
Remove Packing on CU HE
Remove the small screw(M3×6) on CU HE
that holding the Thermistor - Scale Detection
Page 10
Procedure
(1)
1
Front side
2
Ri
ht side
3
Left Side
(1)
(2)
NRC1111-OD/DV
NCC1991-OD/DV
NCC1992-DV
NRC111OD/DV(GQ-C3257WX**)
NCC199OD/DV(GQ-C3257WZ**)
2
Ri
ht side
4
Back Side
Thermistor - Scale Detection
NRC111OD/DV(GQ-C3257WX**)
NCC199OD/DV(GQ-C3257WZ**)
Gasket
*The following models have "Thermistor
- Scale Detection"
NRC111OD(GQ-C3257WX US)
NRC111DV(GQ-C3257WX-FF US)
NCC199OD(GQ-C3257WZ US)
NCC199DV
GQ-C3257WZ-FF US
Gasket
Packing
- for holding Thermistor