©2023 Overland-Tandberg. All trademarks and registered trademarks are the property of their respective owners. The information contained herein is subject to change
without notice and is provided “as is” without warranty of any kind. Overland-Tandberg shall not be liable for technical or editorial errors or omissions contained herein.
Sales and support for Overland-Tandberg products and solutions are available in over 100 countries.
Contact us today at salesemea@overlandtandberg.com. Visit OverlandTandberg.com.
NEOxl 40 3U Tape Library Expansion Module
Page 2 of 6©2023 Overland-Tandberg
10400896-003
2. Remove and save the packaging materials and tape from
the Base Module.
Installation Preparation
The main steps to install an Expansion Module:
1. Aer determining the installation location, if necessary,
transfer the library top or bottom cover to the new
Expansion Module.
2. Make space in the rack and install the rack rails.
3. If applicable, install the power supplies.
4. If applicable, install the DC-DC drive power board.
5. Install the Expansion Module in the rack and align the module
with the library.
6. If applicable, install the tape drives.
7. Attach the cables and cords.
8. Install the tape magazines and verify the installation.
You will need a small flat head or Torx screwdriver and a #2
Phillips screwdriver.
Step 3
Installation
Power Off Library
If still running, power off the library from the Base Module
front panel by pressing and holding down the power button
for three (3) seconds.
NOTE: If the library does not perform a so shutdown, press
and hold the power button for 10 seconds.
Verify that the Robotic Assembly is in its parked position and
that all host processes are idle.
Determine Installation Location
If library expansion was planned for, there should be space for
up to three Expansion Modules above and three Expansion
Modules below the Base Module.
When Expansion Modules are already in place, to eliminate
the steps needed to move covers, install the new rack rails in
the space above or below a current Expansion Module. Then
move the existing Expansion Module onto the new rails and
install the new Expansion Module onto the old rails.
See Chapter 1, “Supported Configurations,” in the
NEOxl 40 Tape Library Administrator’s Guide for additional
details.
Prepare the Modules
Depending on the new Expansion Module’s location, transfer
either the top or bottom module cover from the last module in
that location to the new Expansion Module.
NOTE: Installing the Expansion Module between modules as
shown above does not require moving a cover.
When Expansion Modules are already in place, to eliminate
the steps needed to move covers, install the new rack rails in
the space above or below a current Expansion Module. Then
move the existing Expansion Module onto the new rails and
install the new Expansion Module onto the old rails.
• If you are installing the Expansion Module below the module
stack, move the bottom module’s cover to the Expansion
Module.
• If you are installing the Expansion Module above the module
stack, move the top module’s cover to the Expansion Module.
IMPORTANT:
A NEOxl tape library modular system can support up to 15
Expansion Modules, 8 above and 7 below. If you have not
yet determined the architecture of your configuration, refer to
Chapter 1, “Supported Configurations,” in the NEOxl 40 Tape
Library Administrator’s Guide for details.
1. Using the mechanical lier, remove the existing module from
which you are removing the cover plate.
2. Place the removed module on a secure work table.
If you are removing the bottom cover, gently turn the module
over so you can access the bottom.
New Rail
Old Rail
New Rail
Old Rail
Install New
Unit Here
Move Up