palmiye Skyroof Prestige User manual

1
Installation Manual
Skyroof Prestige

2
Dear Customer,
Installation manual contains suggestions and rules for fast and exact
installation of our product. We recommend you to read our instruction
carefully.
During installation all necessary actions have to be carried out by
authorized and specialized technicians.
All unauthorized interventions during warranty period will invalidate
the warranty.

3
INDEX
04
06
32
43
05
09
37
47
48
1. Symbols, Precautions and Warnings
2. Terminology
3. Packaging
4. Installation Steps
6. Sensors and Automation
8. Tools
9. Frequently Asked Questions
10. Risk Table
5. Programming / Resetting of Panels and Lights

4
1. SYMBOLS, PRECAUTIONS AND WARNINGS
1.1. Symbols
Attention: General operation notes.
Attention: General hazards; possible risk for persons.
Attention: Electrical hazard.
Attention: Risk of crushing hands.
Contact: Palmiye service department or related parties.
1.2. Precautions and Warnings
The installation and maintenance personals (installers, electricians etc.) must have sucient
expertise and knowledge for undertaking the task at hand.
In case of anomalies, immediately stop the work and contact service department of
Palmiye.
Palmiye will not be responsible on use of non-original parts or unauthorized interventions and
modications for damage caused to people or animals or property.
It is forbidden to tamper to bioclimatic pergola system.
General Precautions
Before starting of any assembly, maintenance or cleaning operations, make sure that you have
fully understood the indications in this manual.
All electrical connections for Skyroof Prestige must be made by qualied personnel.
In case of any incompatibility, call Palmiye.
General Safety Precautions
When using the panels, it is good practice to remember that all moving parts can be a source
of danger.
Make sure that power supply is cut o during maintenance.
It is recommended never to intervene on moving parts and to ensure that no operator
is near to the panels before reactivating it after a technical or maintenance intervention.
You can scan the barcodes located next to the titles in the page to see video
demonstration of the related steps.

5
2. TERMINOLOGY
The Motor works with 120V/60Hz or 230V50Hz. If you have a lighting option, you need to use
the lighting control box. The control box works with 120V/60Hz or 230V/50Hz

6
BOM ID Description Qty
1 M10x60mm Stay Bolt 10
2 Gasket 1
3 Side Gasket 2
4 Integrated Gutter Prole 1
5 M6x40 stay Bolt 2
3. PACKAGING
3.1. Preliminary Checks
On receipt of the packed goods and before starting their assembly, check the integrity of the
material and the presence of all the components necessary for the installation.
In case of anomalies, immediately stop the work and contact with hospital.
Fixing elements such as screws, plugs etc. are included in the box.
If not please contact service department of Palmiye.
Do not use a knife to avoid the risk of ruining the paint or other materials.
3.2. Packed Parts
3.2.1. Integrated Gutter
5

7
3.2.2. Panels
There are 3 dierent packed panels.
Frontier PanelFrontier Panel
Middle PanelMiddle Panel
3.2.2.1. Frontier panel 3.2.2.2. Middle panel 3.2.2.3. Back panel
Last PanelLast Panel
3.2.3. Pillars
BOM ID Description Qty
1150x150x3mm Pillar (CNC Operated for connection to Integrated Gutter) 1
2 250x250x10mm Base Plate 1

8
2. Metal Box
U Brackets, Mounting brackets, Pillar caps. It has a blue label on the box.
3. Plastic Box
Corner Plastics,
ELECTRIC
METAL
PLASTIC
3.2.4. Boxes
1. Electrical Box
Control Unit Box and Remote Controls are on Electric box. It has a red label on the box.

9
4. INSTALLATION STEPS
4.1. Structure Installation
Note: Rear Integrated Gutter has escalloped completely by CNC machine in order to place to
Motor tube.
Escallopped for control unit box
Rear Integrated Gutter
Escallopped for control unit box
Rear Integrated Gutter
Follow related product step;
4.1.1. Wall installation (move to step 4.1.1.)
4.1.2. Ceiling installation (move to step 4.1.2.)
4.1.3. Free standing (move to step 4.1.3.)
4.1.1. Wall installation
With the help of laser, all hole locations should be marked at the same level and
holes should be drilled with Ø16 mm drill. The bracket must away 35cm (1’ – 2”)
from the corner.
Brackets should be xed for every 150cm (5ft).
35cm (1ft)
150cm (5ft)
150cm (5ft)
Product width
35cm (1ft)
150cm (5ft)
150cm (5ft)
Product width

10
Fasten of the M12 steel rod to the wall and tighten of rods.
Place the Integrated gutter to the wall mounting bracket.

11
Fasten the wall mounting bracket cover on
top and tighten by M8x25mm bolt.
Fix by self-drilling screw to integrated gutter
and wall mounting bracket.
Important: All screwing should be discarded
after product size control.
The Final view;
4.1.2. Ceiling installation
Dene to ceiling mounting bracket position on the ceiling and make a hole with
Ø16mm drill.
Ceiling Mounting Bracket
35cm (1ft)
Product Width
Ceiling
Ceiling Mounting Bracket
35cm (1ft)
Product Width
Ceiling

12
Fasten of the M20 steel rod to the ceiling
and tighten of rods;
Place the Integrated gutter to the ceiling mounting bracket.
M20x50mm screw
Ceiling Mounting Bracket
M20 Nut
M20 Steel Rod
Washer for M20 Screw
Rear Integrated Gutter
M20x50mm screw
Ceiling Mounting Bracket
M20 Nut
M20 Steel Rod
Washer for M20 Screw
Rear Integrated Gutter
The nal view;

13
4.1.3. Free Standing (Pillar and Integrated gutter connection)
Fix Aluminium Pillar on both side and Rear Integrated Gutter on ground with M10
Sealed Nut as you see in below gure.
M10 Washer Stainless Steel
M10 Nut Stainless Steel
M10 Washer Stainless Steel
M10 Nut Stainless Steel
Lift up a rear frame.
Don’t work alone. You may need someone else.
SealantSealant
SealantSealant

14
Important: All screwing should be discarded after product size control.
Rear Integrated Gutter and Lateral Integrated Gutter position shown at below gure.
Rear Integrated Gutter
Left Side Lateral Integrated Gutter
Rear Integrated Gutter
Left Side Lateral Integrated Gutter
The xing Lateral side integrated gutter to rear integrated gutter with M10 Sealed

15
4.1.4. Cross Check and Level Control

16
Slide the pillar then place the stainless steel anchorage to marked location. For ange
installation please refer to freestanding model.
First of all, dene to exact pillar position and mark it.
4.1.5. Pillar Fixing
4.1.5.1. Stainless Steel Anchorage

17
Place the cap. Apply a sealant then place the
pillar into the anchorage.
At the end, x by M4,8x25mm self-tapping
screw.
Place the elbow and apply sealant.
4.1.5.2. Hidden Anchorage
Firstly, x the hidden anchorage to the
ground with 4 M12 and chemical dowels.
Then, put the washers and nuts on the rods
from inside and tighten them. Put the inner
cover and apply sealant to the sides.
SealantSealant
Place the front cover and x it with 4 M8x25
mm round head bolts. Place the pillar on the anchorage.

18
Fix with 4 M8x25 mm round head bolts from 3 sides.
4.2. Panel Installation
Place a special designed gasket to corners.
While placing the panels start from rear. The rear panel has a short pin.

19
There should be short pin house plate. Firstly, you should x to rear panel short pin house.
Then, place the short pin to house and x its clamp by M5 countersunk head bolt.
Then, place the middle panels to the rail located on gutter prole one by one and x with M10
special bolt.
Finally, rst panel with carriers shall place.

20
The bracket’s nail has to be tted as an exact. After that place the washer and fasten the nuts.
There should be a gear house in correct side. The houses have to be aligned with projection
direction.
4.3. Motor House Placing
Table of contents
Other palmiye Outdoor Furnishing manuals
Popular Outdoor Furnishing manuals by other brands

Berlin Gardens
Berlin Gardens Harbor Bench 44 Assembly guide

BRUSTOR
BRUSTOR B500 Mounting instructions

FJK home products
FJK home products DWGO-26HDT Assembly instruction

SAFAVIEH COUTURE
SAFAVIEH COUTURE Lilliana SFV4749 quick start guide

Uberhaus
Uberhaus 38115139 Operator's manual

modway
modway EEI–2930 quick start guide

Safavieh Outdoor
Safavieh Outdoor Larence PAT7068 quick start guide

Sunjoy
Sunjoy L-GZ375PST owner's manual

PHI VILLA
PHI VILLA GA-103-YE Use and care guide

Broyhill
Broyhill Pembroke H22SO2080 Assembly instruction

Courtyard Creations
Courtyard Creations KTS588X-WM Assembly instructions

Coleman
Coleman 268005000055 owner's manual