Panasonic KW9M Eco-Power Meter User manual

Terminal
device
Terminal
device
Correct
Not correct
2. Parts Name
3. How to Mount
4. Wiring
◆Front
◆Back
◆Dimensions
・Recommended breaker: 3 -15A
・Recommended fuse: Time-lag fuse Rated current 2A
◆RS485 communication wiring
◆Connection of KW9M and the other devices with 2-wire
(unit: mm)
(tolerance:±1.0)
Mounting bracket
Terminal
block A
Terminal
block C
Terminal block B
Mounting screw: M4×10
Display
□96
(45.7)
(70.4)
(25.6)
56
(68)
14
□91 ±0.4
◆Panel mounting
◆Panel cut-out
1) Remove the mounting clips from
the unit.
2) Insert the unit from the front of
the panel.
3) Attach the mounting clips at the both
side of the case and secure in place
with the screws.
(Tightening torque:
approx. 0.2 to 0.3N・m)
・Applicable panel thickness: 1 to 5mm
Keep enough space for several mountings.
recommended space:
130mm the left, right, top and bottom
from center of the unit.
92 ±0.5
92 ±0.5
Terminal block A (upper) 10P
Terminal block C (middle) 8P
Terminal block B (lower) 10P
1No.
Function
No.
Function
No.
Function
Terminal Input voltage
Phase and wire
system
Single-phase
two-wire
Single-phase
two-wire
Single-phase
three-wire
Three-phase
three-wire
Three-phase
four-wire
Terminal
No.
Power supply
Measured
voltage input
L +
RS485
Output 1 Output 2 Input 1 Input 2
2
N -
3
V1
4
V2
5
V3
6
Vn
7
NC
8
SG
9
A +
10
B -
1
OUT1 IN1+ IN1-IN2+ IN2-COM1 OUT2 COM2
2 3 4 5 6 7 8
AUX
(Power supply)
Measured voltage input
Measured current input
vacant
1
CT1
k
CT1
l l l l
CT2
k
CT2 CT3
k
CT3 CTn
k
CTn
2 3 4 5 6 7 8
Power supply
Breaker
Load
Primary side current
Secondary side current
CT(secondary current 1A or 5A)
Ammeter etc.
without
Ammeter
3)
2)
1)6)
K
L
k
l
4)5)
VT (Voltage Transformer)
L1(R)
L2(S)
L3(T )
N
Breaker
AUX
(Power supply)
X X
Terminal block A (upper)
3 - 6
3 - 5 - 6
3 - 4 - 5 - 6
3 - 5 - 6
85~264VAC
100~300VDC
1 - 2
0~500VAC [0~500V  ]
85~264V
100~300V
Item indication
Sub-indication
Log indication
Keys
Measured value
Unit
Lock mark
Alarm indication
Load ratio indication
TX/RX mark
Pulse output
Pulse input
Terminal block A
Terminal block B
Terminal block C
Battery label
Backup battery
Mounting bracket
Mounting bracket
USB port
Please remove and throw away the battery according
to the instruction of your area when throwing the product.
The input voltage to each terminal is as follows.
Connect terminating resistors to the both end of the communication line including
a upper device. Connect terminating resistors (120Ω1/2W or more) between [A+]
and [B-] of Eco-POWER METER connected the end of RS485 line.
Terminal block A
(upper)
Class D
120Ω
1/2W or more
Upper device
RS485 device
SG + - SG
8 9 10
Terminal block A
(upper)
8 9 10
A+B-SG A+B-
Except KW9M KW9M terminal
class D
120Ω
1/2W or more
Terminal device
except KW9M
terminal connection
To RS485 device
Shielded cable
Shielded cable
Shielded cable
Short-circuit [-] to [E].
*Do not connect
shielded cable to [E].
*Do not connect
shielded cable to [E].
*Connect
KW9M
Terminal TerminalExcept terminals
E+ -SG A+B-E+ - SG A+B-
1. Before use
5. Wiring Diagram
6. How to attach Current Transformer
8. For Input Connection
7. For RS485 Connection
●Eco-POWER METER is designed chiefly to manage saving energy.
It is neither intended nor can it be legally used for billing.
●Eco-POWER METER is designed to be used installing in a control panel.
●Please use Eco-POWER METER according to the specification described.
 Otherwise, it may malfunction or cause fire and an electric shock.
 ・Connect Eco-POWER METER to the power supply in compliance with
  the rating.
 ・Refer to the wiring diagram to ensure proper wiring for the power
  supply, input and output.
 ・Use an electric wire applicable to the rated current.
 ・Do not perform wiring or installation with a live line. It may also lead
to circuit burnout or fire by way of the secondary CT side opening.
●Do not connect voltage input, current input, pulse input wires parallel
to high-voltage or power cables and avoid using the same conduit.
Use shielded wires as short as possible.
●Do not turn on the power supply or input until all wiring is completed.
●Do not use at secondary side circuit of inverter. It might cause exothermic
heat or damage.
●If additional noise effects power supply line,voltage input line,current
input line, incorrect measurements may result.
●Installation and wiring must be performed by expert personnel for
electrical work or electric piping.
●Please wipe dirt of the main unit with soft cloth etc.When thinner is used,
the unit might deform or be discolored.
●Do not add an excess power to the display.It might break the inner liquid
crystal.
Installation instructions
KW9M Eco-POWER METER Advanced Type
Read these instructions carefully for proper installation.
After installation, keep it in a safe place for reference when required.
You can download the user's manual from our website.
For User's manual
■For your safety, make sure to satisfy the following conditions.
・Overvoltage category:Ⅱ, Pollution degree 2
・Indoor use
・An ambient temperature of -25 to 55℃
・An ambient non-condensing humidity of 30 to 85%RH (at 20℃)
・Altitude of 2000m or less
■Do not use in the following environments.
・Where it will be exposed to direct sunlight
・Where inflammable or corrosive gas might be produced
・Where it will be exposed to excessive airborne dust or metal particles
・Where it will be exposed to water, oil or chemicals
・Where direct vibration or shock might be transmitted
・Where the place near high-voltage cable, power line or machineries which
occurs the big switching serge.
・Be sure to wire correctly according to the wiring diagrams.
・Please connect breakers or fuses to the power supply input part for
safety reasons and to protect the device.
This product has no built-in power switch, circuit breaker or fuse.
Therefore it is necessary to install them in the circuit near this unit.
・Do not turn on the power supply or input until all wiring is completed.
・Never open the secondary circuit of CT under applying current to load,
never remove the terminal block under applying current to load, it will
cause electric shock or breakdown CT.
◆Terminal arrangement
・Use CT that the secondary side current is 5A or 1A.
・One CT is needed for 1 unit when measuring 1P2W (2 CTs for 2-circuit,
3CTs for 3-circuit). Two CTs are needed when measuring 1P3W/3P3W.
Three CTs are needed when measuring 3P4W (4 CTs to measure N-phase).
Using all CTs for one unit should be the same.
・Use the applicable wire, or it might cause a breakdown, burnout or
electric shock.
・When connecting CT, connect the secondary side to the terminal of the
main unit first, and after that wire the primary side to a load electric wire.
Incorrect order might cause an electric shock or break CT.
・The CT has polarity. Wire correctly according to the K and L marks.
Wrong direction can’ t measure correctly.
・If there is some distortion by harmonic or waveform, it may not measure
correctly. Please check with the actual system before adopts it.
・Separate the wiring (strong electric part) of the measured voltage input
terminal (operating power supply terminal) from the CT cable.
It may not satisfy the accuracy due to noise.
◆How to connect CT
(1) Power off the measured devices.
(2) Install applicable CT.
(3) Remove terminal block of KW9M.
(4) Connect CT to the terminal block.
(5) Insert terminal block to KW9M surely.
(6) After confirm all wiring correct, turn on the power of the load
 and KW9M.
* Connect CT wiring and terminal block surely.
It will cause CT breakdown.
* Never remove the terminal block under applying current to
load. It will cause electric shock or breakdown CT.
◆Pulse input
・Contact input
Use highly reliable metal plated
contacts. Since the contact’ s bounce
time leads directly to error in the count
value, use contacts with as short
a bounce time as possible. In general,
select 30Hz for max. counting speed.
・Non-contact input (Transistor input)
Connect with an open collector.
Use the transistor with the following specifications.
VCEO=20V min. IC=20mA min. ICBO=6µA max.
Use transistors with a residual voltage of less than 2V when the transistor
is ON.
*Short-circuit impedance should be less than 1kΩ.
Open-circuit impedance should be more than 100kΩ.
Leak current in shorted is about 10mA.
・Input wiring
Please wire up as short as possible by using a shielded wire or a metallic
electric wire tube individually.
9. For Output Connection
◆PhotoMOS relay output
・PhotoMOS relay is mounted in this product, therefore it has no polarity.
・Wire up to 100m for output connection.
◆When using VT(voltage transformer)
1P2W
3P4W
1P3W/3P3W
AUX
CT3
L1(R)
L2(N/S)
L3(T)
X X X XX
L+ N- V1 V2 V3 Vn NC SG A+ B- CT1
k
CT1
l
CT2
k
CT2
l
CT3
k
CT3
l
CTn
k
CTn
l
CT1
Connect CTn to measure N-phase.
CTn is not necessary for normal measurement.
AUX
CT1
CT2
CT3
L1(R)
L2(S)
L3(T)
N CTn
(To measure
N-phase)
X X XXXX
L+ N- V1 V2 V3 Vn NC SG A+ B- CT1
k
CT1
l
CT2
k
CT2
l
CT3
k
CT3
l
CTn
k
CTn
l
Terminal block A (upper) Terminal block B (lower)
Breaker (To measure
3-circuit)
(To measure 3-circuit)
AUX
(Power supply)
Breaker
(Power supply)
Breaker
(Power supply)
Power
supply side
Load side
Power
supply side
Load side
Power
supply side
Load side
CT1 CT2 CT3
L1(R)
N
X X
XX
L+ N- V1 V2 V3 Vn NC SG A+ B- CT1
k
CT1
l
CT2
k
CT2
l
CT3
k
CT3
l
CTn
k
CTn
l
K L
K L
K L
123456789 12345678
Terminal block A (upper) Terminal block B (lower)
123456789 12345678
10
10
Terminal block A (upper) Terminal block B (lower)
123456789 12345678
10
1 2 3 4 5 6 7 8 9 10
◆Applicable wire (Crimp-type terminal is recommended.)
◆Applicable ferrules (by Weidmuller)
Terminal block: A
・Stripping length: 7 to 8mm
Screw size: M2.5
Tightening torque: 0.4 to 0.5N・m
Sectional area
*Use shielded wire for RS485 communication.
*Use applicable wire according to the measured current.
*Only for terminal block A and B. It cant be used for C.
single /stranded wire 0.5 to 4mm2(AWG20 to12)
・for 2pcs.
single/stranded wire 2pcs.×0.5 to 2mm2 (AWG20 to 14)
・Power supply/Measured voltage/RS485 communication
Terminal block: C
Screw size: M2
Tightening torque: 0.2 to 0.25N・m
Sectional area:
single /stranded wire
0.5 to 1.5mm2(AWG20 to16)
・Output/Input
Terminal block: B
Screw size: M2.5
Tightening torque: 0.4 to 0.5N・m
Sectional area:
single /stranded wire
0.5 to 4mm2(AWG20 to12)
・CT Input (Measured current)
Wire size 0.75mm2 1.25mm2 2mm2*
For 1pc.
For 2pcs. *
Name
Part number
Name
Part number
H0.75/14D GR H1.5/14D SW H2.5/15D BL
9019040000 9019120000 9019160000
H0.75/14D ZH GR H1.5/16D ZH SW
9037410000 9037470000
Vn terminal should be connected to N-phase which is grounded.
The input number 6 of terminal block A has to be connected to protective earth
to ensure installation safety.
R
R
C
IN+
5 or 7
IN-
6 or 8
Photo
-coupler
OUT
Output (rated capacity 30V AC/DC, 0.1A)
COM
1 or 3
2 or 4
Internal circuit
Internal circuit
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: [email protected]
Press during each item is displayed to change the setting value.
Press to display the confirmation window.
Select [YES] and press to decide the setting value.
However no value is changed, the confirmation window is skipped and
it displays the measuring value display.
*3 It skips when [30] is set at pulse input 1.
*1 It skips when [Peak] or [30min] is set at
power demand type.
*2 It skips when except [30min] is set at
power demand type.
*4 It skips when [Clock] is selected at
pulse input 1.
*5 It skips when [0] is set at auto-display
setting.
*6 It skips when [YES] is selected at reset
all integral value.
*7 It skips when [OFF] is selected at
the previous program.
Measuring value display
Enter password
Phase/Wire Powerdemand type
Power demand
interval *1
Power demand
interval 2 *1
Power input type *2
Pulse type *2
Pulse rate (elecric power
convertion) *2
Pulse constant value *2
Current demand interval
Calcuration method
for 30-min demand *2
CT type
Primary side
current of CT
Rated voltage
VT ratio
Over voltage
Protocol
Device number
Transmission
speed
Transmission
format
Stop bit
Response time
Auto-off
Luminance
Alarm blinking
Update cycle
Auto-display
Display cycle
*5
Temperature
correction
Reset all
integral value
Calendar
timer
Password
setting
Setting Mode
Under voltage
Over current
Under current
【Power
measurement】【Pulse】【Demand】
【Communication】
【Optional function】 【Time program】
【Calendar timer】
【Password】
Confirmation Mode
Measuring value display
Setting confirmation
NO
Setting confirmation
YES
10. Setting Flow
11. How to Set the Parameters related to
Power Measurement
Set before measuring.
◆Phase / Wire
◆Rated voltage ◆Conversion rate (P)
◆Conversion rate (-P)
◆Calender timer
◆VT ratio
◆Over Voltage/ Over Voltage 2
◆Under Voltage / Under Voltage 2
◆Over Current /Over Current 2
◆Under Current /Under Current 2
◆CT type
◆Primary side current of CT
Select measured phase and wire system.
◆How to Enter Password
◆How to Initialize Password
It is necessary to enter password to shift to setting
mode. Enter [0000] and shift to password setting
mode when you set password at the first time.
*When setting password, be careful for handling and note it.
Measuring value display
Measuring value display
Password
entry window
Password
entry window
Password
initialize window
Setting
mode of
power
measurement
When you forget the password, initialize it in the
following procedures. (Initial: [0000])
It is impossible to decode the set password.
Increase
Shift entered digit to the right
Enter password
from left to right
If the password is wrong,
[FAIL] is displayed and it returns
to the password entry window.
*If you make wrong password
5 times, you can’t set 1-hour after.
+
30 sec.
Return to the measuring value display
Initialize[YES] Not initialize[NO]
To use CT with secondary side current 5A: [5] (initial)
To use CT with secondary side current 1A: [1]
When the system is not matched with the measure system,
it doesn’t measure correctly
Select using CT type (secondary side current).
Set the primary side current of using CT.
Enter the primary side current of CT that is set at CT type
setting.
Increase
Decrease
[Set range] 1 to 65535 (initial: 5)
Primary side current of using CT is 400A: [400]
Set the rated voltage of measured voltage.
Select the voltage input method, input voltage directly
or uses a voltage transformer (VT: secondary side rating
110V) and set VT ratio.
Increase
Decrease Increase
Decrease
Increase
Decrease
[Set range] 100 to 500 (initial:100)
Increase
Decrease
[Set range] 0.00 to 99.99 /1kWh
(initial:10.00)
Increase
Decrease
[Set range] 0.00 to 99.99 /1kWh
(initial:10.00)
Increase
Decrease
[Set range]
Jan. 1st, 2000 00:00: to
Dec. 31st, 2099 23:59
[Set range] 1.00 to 600.00 (initial:1.00)
Increase
Decrease
[Set range] 100.0 to 120.0 %
(initial:105.0)
Increase
Decrease
[Set range] 100.0 to 120.0 %
(initial:105.0)
Increase
Decrease
[Set range] 0.0 to 100.0 %
(initial:0.0)
Increase
Decrease
[Set range] 0.0 to 100.0 %
(initial:0.0)
Increase
Decrease
[Set range] 5.0 to 100.0 %
(initial: 95.0)
[Set range] 5.0 to 100.0 %
(initial: 95.0)
Increase
Decrease
[Set range] 0.1 to 120.0 %
(initial: 100.0)
Increase
Decrease
[Set range] 0.1 to 120.0 %
(initial: 100.0)
Set the ratio for the rated voltage to judge to be over voltage
at [over volt] window.
Set the ratio for the rated current to judge to be under current
at [under curr] window.
Press , and [over volt 2] is displayed.
At this window, set a ratio of voltage to clear overt voltage.
Press , and [under curr 2] is displayed.
At this window, set a ratio of current to clear under current.
Press , and [under volt 2] is displayed.
At this window, set a ratio of voltage to clear under voltage.
Press , and [under curr 2] is displayed.
At this window, set a ratio of voltage to clear under voltage.
Set the ratio for the rated voltage to judge to be under
voltage at [under volt] window.
Set the ratio for the rated voltage to judge to be over
current at [over curr] window.
Input directly without VT: [1.00]
Use VT : [1.01 to 600.00]
Set the conversion rate per integral active power 1 kWh.
You can set 5 kinds of rate for each time zone, all-time,
time zone 1, time zone 2, time zone 3 and time zone 4.
Rate for all-time is used when time program is not set.
When you set one or more time programs, the rates for
time zone 1, 2, 3 and 4 are used. Rate for all-time is not used.
Set the conversion rate per integral export power (-P) 1 kWh.
Set the date and time.
In order to use the logging function, set the date and time.
・Refer to User’s manual for the other settings.
Time zone
None: all-time
T1: time zone 1 T2: time zone 2
T3: time zone 3 T4: time zone 4
Time zone
None: all-time
T1: time zone 1 T2: time zone 2
T3: time zone 3 T4: time zone 4
Single-phase 2-wire (initial) Single-phase 3-wire
Three-phase 4-wire Three-phase 3-wire
Rate(P)
Total, T1-4
Rate(-P)
Total, T1-4
Pulse input 1
Clock
synchronize *3
Pulse input 2
Prescale 1 *4
Pulse output 1
Pulse output 2
Prescale 2
*7
Program 7
*7
Program 8
*7
Program 9
*7
Program 10
Program 1
*7
Program 2
*7
Program 3
*7
Program 4
*7
Program 5
*7
Program 6
Select setting item with and press
and the value will be blinking.
Set with and
When you select [YES] with the confirmation window
and press , the setting values are decided.
Reset integral
value 1 *6
Version
Reset count
value 1 *6
Reset count
value 2 *6
Reset logging
data *6
Reset integral
value 2 *6
Reset integral
value 3 *6
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: [email protected]

Other manuals for KW9M Eco-Power Meter

3

Other Panasonic Measuring Instrument manuals

Panasonic KW2M-A User manual

Panasonic

Panasonic KW2M-A User manual

Panasonic RR-QR230E User manual

Panasonic

Panasonic RR-QR230E User manual

Panasonic LP-400 Series Use and maintenance manual

Panasonic

Panasonic LP-400 Series Use and maintenance manual

Panasonic LC2H preset User manual

Panasonic

Panasonic LC2H preset User manual

Panasonic MKG1500-DE User manual

Panasonic

Panasonic MKG1500-DE User manual

Panasonic Omnivision PV-V4600 User manual

Panasonic

Panasonic Omnivision PV-V4600 User manual

Panasonic KC2S Eco-COUNT METER User manual

Panasonic

Panasonic KC2S Eco-COUNT METER User manual

Panasonic DMRE20 - DVD VIDEO RECORDER User manual

Panasonic

Panasonic DMRE20 - DVD VIDEO RECORDER User manual

Panasonic RS-790S User manual

Panasonic

Panasonic RS-790S User manual

Panasonic VP-7722A User manual

Panasonic

Panasonic VP-7722A User manual

Panasonic SV-3800 User manual

Panasonic

Panasonic SV-3800 User manual

Panasonic AG6124 User manual

Panasonic

Panasonic AG6124 User manual

Panasonic KW9M Eco-Power Meter User manual

Panasonic

Panasonic KW9M Eco-Power Meter User manual

Panasonic WJHD500 - DIGITAL DISC RECORDE User manual

Panasonic

Panasonic WJHD500 - DIGITAL DISC RECORDE User manual

Panasonic LH2H preset User manual

Panasonic

Panasonic LH2H preset User manual

Panasonic KW9M Eco-Power Meter User manual

Panasonic

Panasonic KW9M Eco-Power Meter User manual

Panasonic LH2H preset User manual

Panasonic

Panasonic LH2H preset User manual

Panasonic WJ-NV300K/GJ User manual

Panasonic

Panasonic WJ-NV300K/GJ User manual

Panasonic LH2H-FE-DHK User manual

Panasonic

Panasonic LH2H-FE-DHK User manual

Panasonic K-NL316G User manual

Panasonic

Panasonic K-NL316G User manual

Panasonic DMR-UBT1GL-K User manual

Panasonic

Panasonic DMR-UBT1GL-K User manual

Panasonic FZ-VNP001U User manual

Panasonic

Panasonic FZ-VNP001U User manual

Panasonic BL-WV10A User manual

Panasonic

Panasonic BL-WV10A User manual

Panasonic WJ-NX100/2E User manual

Panasonic

Panasonic WJ-NX100/2E User manual

Popular Measuring Instrument manuals by other brands

iSystem iC5000 user manual

iSystem

iSystem iC5000 user manual

GHM GREISINGER G 1910 Series Quick reference guide

GHM

GHM GREISINGER G 1910 Series Quick reference guide

Agilent Technologies N1913a user guide

Agilent Technologies

Agilent Technologies N1913a user guide

Sartorius MA35M-115N operating instructions

Sartorius

Sartorius MA35M-115N operating instructions

Wavecrest DTS-2070 CALIBRATION PROCEDURE

Wavecrest

Wavecrest DTS-2070 CALIBRATION PROCEDURE

Santacary iP2 PM2.5 user manual

Santacary

Santacary iP2 PM2.5 user manual

Futech Drill Pointer 2 instruction manual

Futech

Futech Drill Pointer 2 instruction manual

TESTO 506 instructions

TESTO

TESTO 506 instructions

Matheson FM-1000 Operation instructions

Matheson

Matheson FM-1000 Operation instructions

Sloan Optima Maintenance manual

Sloan

Sloan Optima Maintenance manual

Spectrum Technologies Fieldscout TDR 350 product manual

Spectrum Technologies

Spectrum Technologies Fieldscout TDR 350 product manual

cape cod CCWSP instructions

cape cod

cape cod CCWSP instructions

Keysight Technologies 8970B quick start guide

Keysight Technologies

Keysight Technologies 8970B quick start guide

IRIS IRIS-RS485 Getting started

IRIS

IRIS IRIS-RS485 Getting started

Electro Industries/GaugeTech Shark MP200 in Enclosure Installation & operation manual

Electro Industries/GaugeTech

Electro Industries/GaugeTech Shark MP200 in Enclosure Installation & operation manual

PMK BumbleBee Series instruction manual

PMK

PMK BumbleBee Series instruction manual

Calculated Industries Laser Dimension Master 165-BT manual

Calculated Industries

Calculated Industries Laser Dimension Master 165-BT manual

Efergy ELITE instruction manual

Efergy

Efergy ELITE instruction manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.