
Step 3
Slide handrail down Goal Post (on correct side) then align with the hole in the bottom Step. You may
need to wiggle around a little to get into the hole. Once through, keep moving both through
together. Handrail will need to slide over the grip tap that is at the bottom of the Goal Post to
minimise movement ongoing. Remove the tape on the handrails once installed.
Step 4
Install 1 x bolt (cup head) at top of handrails through Goal Posts and 4 x countersunk bolts into base
of handrails. Two will be from the front and two will be from the side. Tighten with 4mm Allen Key
(or Hex bit) and 10mm spanner.