Park House Healthcare RICHMOND User manual

RICHMOND ULTRA LOW BED
User Manual
Park House
Healthcare
Park House
Healthcare
Tel: 0845 0600 333
Fax: 0845 0600 334
Email: [email protected]
International Tel: +44 (0) 1274 475000
International Fax: +44 (0) 1274 475046
Web: www.parkhouse-hc.com
Park House Healthcare Ltd
Whitehall 26 Business Park,
1Heathfield Lane, Birkenshaw,
West Yorkshire, BD11 2HW, UK.
ISO Certificate No: 8019
CE Certificate No: CA001810
Master Indemnity Assurance No: IFA2433 0451 CCI
Due to its policy of continued development and
improvement, Park House Healthcare Ltd
reserves the right to amend any details
and specifications without notice.
© Copyright Park House Healthcare Ltd. 2012/10
31OCT 2012 REV 3
UM – RICHMONUL
The Company
Founded in 1984, Park House Healthcare Ltd
is now recognised as a market leading supplier
of specialist pressure relieving and pressure
reducing equipment, hospital beds and moving
and handling solutions to the NHS, Community
and Nursing Home sectors.
Our innovative product portfolio encompasses a
range of clinically proven healthcare solutions,
which are fully supported by dedicated clinical
training, professional product audit and
complete maintenance and decontamination
services.
Our purpose built state of the art Corporate
Headquarters in West Yorkshire is central to
our extensive network of service and logistics
centres, strategically located throughout
the country. 24 hour care, 365 days a year,
and divisions, ensuring one on one service and
support is never far away.
With distributors in over 25 countries, Park
House Healthcare Ltd is a truly international
company and places important emphasis on
providing tailored healthcare solutions and the
highest level of customer care to our partners
throughout the world.
Park House Healthcare Ltd is a respected
member of the British Healthcare Trade
Association and has BS EN ISO 9001 and
quality standard for Medical Devices. All
products are CE marked in accordance with the
European Directive 93/42/EEC.

NOTES
CONTENTS
1. GENERAL SAFETY INSTRUCTIONS 3
2. FEATURES 3
3. INSTALLATION 3
4. ASSEMBLY 4
5. OPERATION 5
6. ADDITIONAL SAFETY INFORMATION 6
7. MAINTENANCE, CARE & WARRANTY 7
8. TRANSPORT FRAME 7
98. TROUBLESHOOTING
10. TECHNICAL DATA 8
11. IP66 INGRESS PROTECTION 9
9
11. IP 66 – Ingress Protection
The bed offers IP66 ingress protection on all electrical components and controls as standard. This is a high
level of protection which is completely dustproof. Any water splashing against the electrical components will
have no harmful effects on the electrical operation of the bed.
WARNING! The bed must be disconnected from the mains supply before any kind of cleaning procedure is
undertaken.
This bed and its components can be both jet and steam cleaned and are suitable for cleaning in a
decontamination chamber and tunnel washer. If in any doubt about cleaning methods or materials, please
check with Park House Healthcare before cleaning.

3
1. General Safety Instructions
Before putting the bed into operation, it is very important that this User Manual is read carefully. The manual
contains important information for safe and proper use of the bed. Keep this manual handy for future
reference.
All of the functions of this bed should be fully tested by a competent person before the bed is used.
The bed must not be used if faults have been detected that may injure the patient/user or cause damage to the bed or
the surrounding furniture.
The operating persons are obliged to acquaint the patient lying on the bed with the control functions that are designed
for use by the patient, and their safe usage.
The operating person is obliged, before using the bed, to be confident of the functionality and safe usage of the bed.
The bed may be used only on even and solid floors.
The bed must never be overloaded. Maximum working load - 180 kg (28.3 stones).
If there is a patient on the bed, castors must be locked (with the exception of when travelling with the bed). An
unlocked bed poses risk of injury to the patient when leaving the bed or when supporting themselves.
The height of the mattress platform must be adjusted according to the height and condition of the patient.
This is a single patient bed; no other people should sit on the bed.
When handling the moving parts of the bed, ensure that the patient, other people or objects do not become trapped.
Before cleaning or maintaining the bed, the mains power cable must be disconnected from the mains.
The bed should not be used where there is a danger of explosion or in the presence of flammable anaesthetics.
When maintaining and cleaning the bed in the space between the undercarriage and mattress platform, the profiling
functions on the handset must be locked to avoid unintentional activation of the mattress platform.
The mains power cable must be stored neatly so it does not get wound around or trapped between the moving parts
of the bed. If the mains power cable is damaged there is a serious danger of injury from electrical current.
Inspections should be made at least once a month for visible wear and tear of all moving parts of the bed and cables.
The bed is intended for adults from 12 years of age. Ensure that children only have access to the bed under
adequate supervision. Do not allow children underneath the bed at any time.
2. Features
The drivers for the adjustment are electric mechanical linear motors with maintenance free permanent lubrication.
The motors are operated by a handset connected to the main control box via a spiral wound cable.
The motors and handset are isolated from mains voltage (230v) and operated at DC 24v low voltage.
3. Installation
The bed should only be assembled by a suitably competent person. The bed is suitable for installation by one
person. When installing more than five beds, two people should be used to complete the installation. They must read
and fully understand all of the instructions contained in this user manual. Do not attempt to assemble this bed if you
are unsure about any part of the instructions, or if any damage or defect can be identified.
The fuse in the mains plug should not exceed 5 amps.
The bed should be located on a level flat surface. Do not site the bed on loose carpet, rugs or floor coverings.
The cable from the mains power supply plug to the main control unit must be positioned clear of the lift mechanism
and braked castor system to eliminate the danger of shearing or crushing the cable.
Ensure that all cable conduits are fully secured.
8
9 Troubleshooting
Fault Action
One or more motors not working
when handset operated or the
handset does not function.
1) No power supply –Plug power cable into mains socket and turn on.
2) Check the handset, motor and main control box connections.
3) Motor or handset defective - Contact Park House Healthcare Ltd.
Motors suddenly have no response
or movement.
1) Switch off and unplug the mains cable; plug it back in and switch on.
2) Leave the system in the rest position for approx. 20-30 min and retry.
3) Contact Park House Healthcare Ltd.
WARNING - Any unauthorized modifications, adjustments or alterations will result in warranty invalidation. All repairs
must be carried out by a suitably qualified competent engineer.
Park House Healthcare Ltd reserves the right to make technical changes, specification amendments and product
improvements without notice.
BATTERY
As per the Batteries and Accumulators (Placing on the market) Regulations, Park House Healthcare Ltd will take back
the battery from this equipment free of charge at the end of its life.
Our battery producer registration number is BPRN00892.
Park House Healthcare Ltd reserves the right to make technical changes, specification amendments and product
improvements without notice.
10. Technical data / spare parts
Overall length: 2145 mm (inc. Head and footboard brackets) Platform length: 1980 mm
Overall width: 900 mm without side rail 1020 mm with side rails Platform width: 880 mm
Adjustable platform height: 170 mm (low position) / 710 mm (high position) Castors: 75mm Diameter
Clearance beneath the bed: 135mm Central locking at foot end
Safe working load: 180 kg (28.3 Stone) under normal condition
Weights: Head section: 26.8 kg (inc head motor & knee motor) Foot section: 18.4 kg
Scissor section: 47.0 kg (inc main motor) H/F boards 3.2 kg each
Side rails (Pair): 15.0 kg
Total bed weight: 95.5 kg (without side rails, mattress or accessories)
Control Box ref: CB9160AE4+A0013 Input 230V / 50Hz Output: 24V DC Max 1.5A
Main motor ref: 31111S+1022502H Actuator force: Push 6000N Power: 24Vm Max 4.3
Backrest motor ref: 31250C+2110002F Actuator force: Push 3500N Power: 24Vm Max 3.9A
Knee motor ref: 312110+2005002F Actuator force: Push 4000N Power: 24Vm Max 3.8A
Adjustment for backrest / Adjustment for thigh rest: 66 deg +/- 2 deg / 13 deg +/- 2 deg Adjustment for calf rest: 9.5 deg
66PIdetarerallA:gnitaRPIrotoM00-342X7BH:fertesdnaH
Battery backup ref: BA1812+0400+000 24VDC 10A Power duration: Max. 10% (2 mins per 18 mins)
Product conforms to IEC 60601-2-52

7
7 Maintenance,careandwarranty
To clean the frames use a damp cloth with normal household cleaners or warm soapy water.
Do not use cleaning agents containing abrasives or strong solvents. This will damage the powder coated finish on
the metal parts of the bed.
Mechanical or automated cleaning, scouring or the use of high-pressure hoses will damage the bed.
Moving parts of the bed are fitted with self-lubricating bearings; these should not be oiled or greased.
All motors, cables and mechanical functions must be checked for damage and correct operation by a suitably
qualified service engineer at least once in every twelve month period.
Extended warranties can be purchased from Park House Healthcare Ltd. For more information contact Customer
Services on Tel: 0845 0600 333. In the event of a fault being discovered within the warranty period, the customer
should notify the Company at the earliest opportunity. If, upon inspection, the Company accepts liability the
equipment will be repaired or replaced at the company’s discretion. If the Company does not accept liability it will
inform the customer the reasons for rejection and provide the customer with an estimated cost for repair or
replacement.
8 Transport Frame
To prevent damage during transportation or storage, use the transporter set:
Raise the bed up so that it is high enough to fit the transporter set.
Remove the headboard, footboard and all four mounting brackets. Ensure that these are bagged and stored safely to
avoid damage. Leave the hand screws in the bed frame ready for the transporter set.
Fit the transporter set frames with the wheel pointing toward the floor with one frame at either end of the bed, then
tighten the hand screws. Ensure that all of the castor brakes are locked on the transporter frames.
Lower the bed via the handset until the bed starts to lift off the floor.
Disconnect the mains power plug. Carefully roll the lead up with the handset ensuring that there are no kinks and store
them to ensure they do not get damaged during transportation / storage.
Lift the bed up by the platform frame and rotate the bed frame so that the bed rests on all four transporter set wheels.
Store in a dry place (between +5 °C and +45 °C), relative humidity of the air should be between 30% and 70%.
Store all removed parts together in one place to avoid them being mixed up with other products when re-assembling.
When re-assembling the bed, all assembly procedures and safety checks must be performed as per this user manual.
4
4 Assembly
The bed is supplied with the platform and scissor action fully assembled and cabled up.
Headboard and footboard
The headboard and footboard brackets should be inserted into the four corners of the bed frame. Ensure that the
dimple in the underside of the bracket is in line with the allen screws/hand screws, fit the headboard and footboard
panels and then tighten the allen screws/hand screws.
Side rails:
These should be fitted onto the bed. Locate the sleeves into the cylindrical mounting brackets, push in the side rail then
tighten all of the allen screws/hand screws.
IMPORTANT: Once the allen screws/hand screws have been tightened, ensure that the frame cannot be pulled apart at
the headboard end, footboard end and the centre of the bed.

5 6
5 Operation of the height adjustment and profiling functions
6 Additional Safety information
IMPORTANT - In the case of any unusual noises or smells during the operation, switch off the power at the mains and
remove the plug immediately. Ensure that no cables are damaged or trapped in the mechanism. If you have any doubts
concerning the safe operation of this bed, remove the bed from use and call Park House Healthcare Ltd, Tel: 0845 0600
333 at your earliest convenience.
The handset should be plugged into the bottom of nurse lock-out box located at the foot end of the bed. The knob on the
control box can either be set locked (knob horizontal) or unlocked (knob vertical).
Nurse Lock-out box
The head section, knee break, bed height and electronic CPR functions are adjusted by pressing the appropriate button
on the handset. For ease of use, the buttons are labelled graphically according to their function. Keep the button pressed,
there may be a very small delay before the actuator kicks in.
Any persons assembling or using the bed should read the user manual and familiarise themselves with its operation.
Ensure that any objects such as waste bins, occasional tables, chairs etc. are not placed beneath the lifting
mechanism of the bed and the head / footboard are not situated beneath a fixed object, i.e. window sills.
To avoid injury during operation, ensure limbs and body parts i.e. fingers, arms, etc. are clear from the moving parts
of the bed and the side rails.
Before moving the bed to a different location, disconnect the mains power supply (un-plug). Failure to do so may
result in damage to the bed and / or serious or fatal injury.
It is not recommended that the bed is used for transportation.
Under no circumstances must the bed be moved by pulling or pushing the side rails, headboard or footboard, either
when the bed is occupied or empty. The side rails, headboard and footboard are not designed for this purpose.
Never exceed the maximum usage period of 6 minutes per hour, for the electrically driven bed functions, by lengthy
and unnecessary profiling or height adjustments. This can trip the thermal safety fuse which will stop the powered
movement of all electrically operated bed parts.
Once the bed is sited in the desired position, always ensure that the castors are locked in the braked position.
To lock - press the foot bar down. To release the brakes - lift the foot bar up.
Before dismantling or troubleshooting, ensure that all functions are in the lowered position (where possible), the
power supply is switched off and the power cable is disconnected from the mains (un-plugged) Ensure that all
functions are not under any un-due load and are free moving.
Before operation
Ensure that the assembly is completed fully, and in accordance with the instructions given in this user manual.
Ensure that the electrical mains supply voltage corresponds to that marked on the main control unit label before
connecting to the mains supply.
The mains leads MUST be plugged directly into the wall socket. Use of extension leads is not permitted.
Ensure that cables from all motors are connected to the main control unit correctly before operation.
Ensure that all functions of the bed have been tested and that the bed is working normally.
–WARNING - Do not exceed the maximum usage period all functions maximum of 2 minutes per 18 minutes.
Head section adjustment
Height adjustment
Foot section adjustment
Electronic CPR Function
BATTERY
As per the Batteries and Accumulators (Placing on the market) Regulations, Park House Healthcare Ltd will take back
the battery from this equipment free of charge at the end of its life.
Our battery producer registration number is BPRN00892.
Park House Healthcare Ltd reserves the right to make technical changes, specification amendments and product
improvements without notice.
Head section adjustment
Height adjustment
Electronic CPR Function
Foot section adjustment
Autocontour Function
Table of contents
Other Park House Healthcare Medical Equipment manuals

Park House Healthcare
Park House Healthcare Tudor User manual

Park House Healthcare
Park House Healthcare Endeavour User manual

Park House Healthcare
Park House Healthcare Delta Plus User manual

Park House Healthcare
Park House Healthcare BUTTERFLY COT User manual

Park House Healthcare
Park House Healthcare PHASE III User manual

Park House Healthcare
Park House Healthcare AMBIENCE User manual

Park House Healthcare
Park House Healthcare WARWICK User manual

Park House Healthcare
Park House Healthcare RICHMOND ULTRA LOW BED User manual

Park House Healthcare
Park House Healthcare PHASE II User manual