
PFT SCREW MIXER HM 2 Overview – Operation – Spare Parts Lists
Table of Contents
2017-08-07
3
1
EC Declaration of Confor ity ..................... 5
2
Testing .......................................................... 6
2.1
Testing by machine operator ............... 6
2.2
Periodic inspection .............................. 6
3
General notes ............................................... 7
3.1
Information about operating
instructions........................................... 7
3.2
Please retain the instructions for
later use ............................................... 7
3.3
Division ................................................ 7
4
Technical data .............................................. 8
.1
General specifications ......................... 8
.2
Electrical 00V ..................................... 8
.3
Operating conditions ............................ 8
.
Noise level ........................................... 8
.5
Vibrations ............................................. 8
5
Overview HM 24 ........................................... 9
5.1
Water Manifold................................... 10
5.2
Water Manifold with Water pressure
booster pump ..................................... 10
6
Type plate ................................................... 11
7
Quality control sticker ............................... 11
8
Connections ............................................... 11
8.1
Connection without control box 00V 11
8.2
Connection with control box 00V ..... 11
8.3
Connection without control box 230V 12
8.
Connection HM 2 with control box ... 12
9
Description of Functions .......................... 13
10
Basic Saftey Instructions .......................... 14
11
Safety rules ................................................. 15
12
Transport, packing and storage ............... 15
12.1
Safety instructions for transport ......... 15
12.2
Transport inspection .......................... 16
13
Packaging ................................................... 16
14
Operation ..................................................... 17
1 .1
Safety ................................................. 17
15
Preparing the achine ............................... 18
16
Connecting the power supply ................... 19
16.1
Power connection without control
cabinet ................................................ 19
16.2
Power connection with control
cabinet ................................................ 19
16.3
Check the individual connectors ........ 19
17
Check the direction of rotation ................. 20
17.1
Main switch on the control cabinet ..... 20
17.2
On/Off switch with phase inverter ...... 20
17.3
Connecting the power supply 230 V .. 21
18
Setting Up the Machine .............................. 21
18.1
Water from a water barrel .................. 23
19
Putting the achine into operation .......... 23
19.1
Hazardous dust .................................. 23
20
Cleaning ...................................................... 24
21
Measures against danger of frost ............. 25
22
Measures during power failure ................. 25
23
Measures for Water Supply Failure .......... 25
24
Maintenance ................................................ 25
2 .1
Safety ................................................. 25
2 .2
Cleaning ............................................. 26
2 .3
Maintenance schedule ....................... 27
2 .
Dirt trapping sieve .............................. 27
25
Dis antling ................................................. 28
25.1
Safety ................................................. 28
25.2
Dismantling......................................... 29
25.3
Disposal.............................................. 29
26
Spare parts drawing ................................... 30
26.1
Hopper with Frame Unit ..................... 30
26.2
Spare parts list Hopper with Frame
Unit ..................................................... 31