Model SL19 Installation Manual
Staying Home Corporation
--
LEGACY ELEGANCE II

2
Preliminary Checks
Installation Site Requirements
_____ -
_____
_____
Included with Shipment
_____
____ -
_____
____
_____
_____
_____ 6’
_____
_____
____
_____
_____
_____
Tools Required
_____
_____
_____
_____
_____
_____
_____
_____(7/16” & 1/2")
_____

3
Typical Components

4
Underside of Chassis

5
Identify Track Pieces
-

6
Installation Procedures for Stock Units
Track Installation: Track and rack should be cut before installing them on the staircase
-
--
-
Note: The gear rack is already
inserted in the gear rack channel of the track.
7” (note: be sure to verify clearance from
top nose to any obstruction at the top such as a door or door
frame that would cause the chair to hit or block the seat from
swiveling.)

7
.
Left Hand
Installation
Right Hand
Installation

8
Splice Track Pieces Together
-
.

9
Secure the Track to the Stair Treads

10
Insert the Chassis into the Track
Remove the upper most section of gear rack to allow
you to slide the chassis into the track easily.
Ensure the chassis rollers and shim spacers are
properly installed on the chassis axles. Two shims go
onto each axle on the gear rack side and one shim on
the opposite side.
Failure to have the proper spacers in place will
cause the pinion gear not to engage in the gear
rack properly.
The chassis can now be inserted into the top end of the
track.
Feed the travel cable/energy chain inside the track.
Make sure the energy chain does not snap apart.
Flip the red RESET/OFF switch to the RESET position. The lift will beep and is now ready to be run
down onto the gear rack using the black INSTALLATION SWITCH on top of the chassis.
Run the chassis down the track to the lower limit.
Replace the top piece of gear rack in the track.
Chassis Rollers
2 Shims 1 Shim

11
-
-

12

13
Note that the ETL
listing is valid only when the track installed at maxi-
mum angle of 45°.
-
-

14
RF Remote Call-Send Controls
-
Programming:
‘’
‘’
‘’
-

15
AUDIO/VISUAL STATUS INDICATIONS
-
STATUS LIGHT AUDIBLE ALARM CONDITION
-- -
-

16
Completion Procedures SERVICE LINE 877.378.4275
(Mon-Fri 8:00 – 5:00 CST)
Completion Checklist
_______ Upper and lower limits:
_______ Charger:
_______ Running Clearance:
_______ Unit Control:
_______ Call/Send Remotes:
Track:
_______ Important:Top Track End Plate:
_______ Important:Lower Track End Plate:
_______ Track Mounting Brackets:
_______ Track Splice:
_______
_______
_______ Verify the gear rack is lubricated with lithium or other all-purpose grease
_______
_______
Footrest:
_______
_______
_______
_______
_______
Seat:
_______
_______
_______
_______
_______
_______
_______ Clean Up:
Before leaving the jobsite:
_______
_______
_______
_______
This manual suits for next models
1
Table of contents