8
2 Installation procedure.
1. Before insta ation make sure that the mains 230 V is disconnected.
2. Install the power suppl at the selected place and evacuate connection wires.
3. Remove the main fuse protecting the transformer primar circuit [15].
4. Connect the suppl conductors ~230V to the terminals of the AC 230 V transformer [14]. The earth conductor
should be connected to the terminal marked with the grounding s mbol [16]. Three-wire cable should be used for
the connection (the protective conductor in green-and- ellow PE).
The power conductors should be connected to the appropriate terminals on board [14] [16] and properl insulated
Particular care must be taken when makin the electric shock protection circuit: yellow-
reen protection conductor of the power cable must be connected from one side to the
clamp marked inside the housin of the power supply unit. Operation of the power supply
unit without correctly installed and technically functional electric shock protection circuit is
NOT ALLOWED! This can lead to dama e to the equipment and poses risk of electric shock.
5. Connect the conductors of the consumers to terminals +AUX, -AUX of the connection block on the power supply
unit board [11].
6. If necessary, connect the conductors from the equipment (alert central appliance, controller, signaling units,
etc.) to technical outputs [11]:
- BS the output signaling the fault to the 30V.
In the course of the normal operation of the powerpack, the BS technical output is disconnected from the mass
(-AUX), while in the case of the 30 V AC power failure, it is shortened to the mass (-AUX) after the time
determined by the Z1, Z [5] switching pieces (Fig. 5).
- AW output signaling faults.
The technical output AW during the normal operation of the power supply unit is shortened to the mass (-AUX),
while in the case of the occurrence of any of the above-mentioned events, the output becomes disconnected from
the mass.
7. With the switching pieces Z3, Z4 [5] determine the time of disconnecting the battery in the case of battery
assisted operation when the voltage on the terminals drops below ~10V.
8. With CHARGE [9] jumper, determine the battery charging current:
Ibat = 0,45Amax – jumper CHARGE installed
Ibat= 0,90Amax – jumper CHARGE removed (not allowed for: AWZ110, AWZ224).
9. Switch on the power supply 30V AC and insert the network fuse protecting the primary circuit of the
transformer [15]. Check the optical signaling of the power supply unit operation.
The output volta e of the unloaded power supply unit is U= 13,8V DC.
Durin battery char in , the volta e may be anywhere between U= 11V÷13,8V DC.
10 .Connect the battery in accordance with the indications [6] red = (+), black=(-)
Mount the battery with the use of a band clip 700x 8mm according to the procedure in Fig. 4.
- place the battery inside the casing,
- put the band clip through the left hole A
- put the band clip over the top of the battery
- put the band clip through the hole B
- put the end of the band clip into the clamp
- tighten the band clip with the force 150N- 00N
- cut off the excessive part of the band clip.
11. B the means of the STOP [3] pushbutton, enable or disable the batter d namic test.
Disabling the test will also disable signaling the faults to the batter on the AW output, but will not disable the
s stem protecting the batter from entire discharging.
12. Perform the power suppl unit test: optical signaling [7] [8] (Tab.6), acoustic signaling [1] (Tab.7), technical
outputs through[11]:
- disconnecting the 230V AC power supp y: optical and acoustic signaling - immediatel , technical
output BS after the time determined b switching pieces Z1, Z2 (Fig.5)
- disconnecting the battery: optical, acoustic signaling, technical output AW - following performing the
batter test (~ 10 min)
13. B the means of the STOP [3] push button, enable or disable the batter d namic test.
Disabling the test will also disable signaling the fault to the batter on the output.
14. With ZB [2] pins, determine whether the acoustic signaling (Tab.7) is to be enabled (switching piece installed)
or disabled (switching piece removed).
15. Following installing and checking the correctness of operation of the power suppl , the enclosure ma be
closed.