
Quick Start Guide
13
June 2016
Liquid applications-transmitter located below Rosemount 1195 Taps
1. Pressurize line.
2. Open equalizer valve on transmitter manifold. Close equalizer valve at integral
orifice, if one is used.
3. Open high and low side transmitter manifold valves and high and low block
valves at integral orifice.
4. Bleed drain/vent valves on transmitter manifold until no air is present.
5. Close drain vent valves, then bleed vent valves at the integral orifice block
valves until no air is present.
6. Close vent valves at integral orifice block valves.
7. Close equalizer valve at transmitter manifold.
8. Close low and high side block valves at integral orifice.
9. Open vent valves at integral orifice block valves.
10. Check transmitter zero according to transmitter manual.
11. Close vent valves at integral orifice block valves.
12. Open high and low side block valves at integral orifice. The system is now
operational.
Steam service-transmitter located below Rosemount 1195 Taps
1. Remove pressure from line or close block valves at integral orifice.
2. Open equalizer valves, high and low side valves on the transmitter manifold.
Close equalize valve at integral orifice, if one is used.
3. Open vent valves at integral orifice block valves. To vent sensing lines.
4. Fill transmitter manifold and instrument lines with water via low side vent at
integral orifice block valves.
5. Open and close vent valves at transmitter to bleed out trapped air.
6. Close the equalizer valve at transmitter manifold.
7. Complete filling the low side and high side sensing lines.
8. Gently tap electronics body, transmitter manifold, instrument lines, and
integral orifice with a small wrench to dislodge any trapped air.
9. Check transmitter zero according to transmitter manual.
10. Close vent valves at integral orifice block valves.
11. If block valves at integral orifice had been closed they should now be opened.
System is now operational for steam flow measurement.
00825-0100-4686 EA.fm Page 13 Friday, June 17, 2016 4:39 PM