
2
AA
Contents
· Selecting solderless ring terminal .................... 36
· Connecting the power terminal ....................... 36
· Installing grounding wire ..................................... 38
Air tightness test and vacuum drying........................... 40
· Air Tightness ................................................................ 40
· Vacuum drying pipes and indoor units ....... 41
Charging refrigerant ............................................................. 42
· Important information regulation regarding
the refrigerant used ................................................ 42
· Charging refrigerant .............................................. 43
Pipe insulation ......................................................................... 44
· Insulating the refrigerant pipes and branch
joints ................................................................................. 44
· Selecting the refrigerant pipe insulator ...... 44
· Insulate the refrigerant pipe .............................. 45
· Insulate the distribution header ..................... 46
· Insulating the pipe located inside of the
outdoor unit ................................................................ 47
Basic segment display .......................................................... 48
Setting outdoor unit option switch and key
function ..................................................................................... 49
· Setting outdoor unit key function ................. 49
· Setting key operation and checking the view
mode with tact switch ....................................... 54
Things to check after completing the installation .. 57
Inspection & test operation ................................................59
· Checklist before auto trial operation ............ 59
· Auto trial operation ................................................. 60
Inspection & trial operation ................................................61
Automatic refrigerant amount detection function
..........................................................................................................62
Safety precautions ..................................................................... 3
Preparations for Installation .................................................. 6
· Outdoor unit classication ...................................... 6
· Accessories ....................................................................... 6
· Optional accessories ................................................... 7
Selecting installation location .............................................. 7
· Space requirements ................................................. 10
· Moving the outdoor unit ........................................13
Basic construction and installation of the outdoor unit
.......................................................................................................... 14
· Installation of Outdoor unit ................................. 14
Installation of Air-conditioner ........................................... 17
· Refrigerant pipe work .............................................. 17
· Selecting refrigerant pipe ..................................... 18
· Keeping refrigerant pipe........................................ 21
· Temper grade and minimum thickness of the
refrigerant pipe ........................................................... 21
· Refrigerant pipe welding and safety
information .................................................................... 22
· Cutting or aring the pipes ................................. 23
· Connecting the ared pipes ............................... 24
· Pipe installation for an outdoor unit ............. 25
· Connecting the drain hose to the outdoor unit .
............................................................................................. 26
· Examples of refrigerant pipe installation .... 27
· Allowable length of the refrigerant pipe and
the installation examples ...................................... 28
· Installation of refrigerant Y-joint ....................... 30
· Installation of the distribution header .......... 32
Wiring work ................................................................................ 33
· Specication of the circuit breaker and power
cable ................................................................................. 33
· Specication of the protection tube ............... 34
· Power wiring Diagram ............................................ 35
For information on Samsung’s environmental commitments and product specic regulatory obligations
e.g. REACH visit: samsung.com/uk/aboutsamsung/samsungelectronics/corporatecitizenship/data_corner.
html