Shark 100BT User manual

Doc# E145753 V.1.04 QS - 1
Shark® 100BT Quickstart
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Shark® 100BT Quickstart Guide
Mechanical Installation
Installation Steps: Slide top of groove of meter onto DIN Rail. Press gently until the meter clicks into
place. If mounting with DIN Rail provided, use Black Rubber Stoppers (also provided) shown above.
To remove meter, pull down on Release clip. Electrical Installation: Select diagram for your application.
NOTE: Other wiring configurations are available. See the full Manual on the enclosed CD.
5.02”
[12.75cm]
3.25”
[8.26cm]
Ic Ib Ia
HI HI HI
LOLOLO
3.52”
[ 8.90cm]
0.62”
[1.61cm]
[12.10cm]
4.78"
[2.31cm]
0.91"
4.16”
[10.60cm]
DINInstallation
Release clip
100BT
Dimensions
DIN Rail with black
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
N
N
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
N
N
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
2 x 0.1A
FUSE
3A
C
C
B
B
A
A
WYE direct, 3
phase, 4 wire
Delta direct, 3
phase, 3 wire
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
3 x 0.1A
FUSE
3A
C
C
B
B
A
A
WYE with PTs,
3 phase, 4 wire
Delta with PTs, 3
phase, 3 wire

Doc# E145753 V.1.04 QS - 2
Shark® 100BT Quickstart
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Communication Wiring: The Shark® 100BT has
an RJ45 port on its backplate, which accommodates
a standard Ethernet cable.
Factory Default Settings: The Factory Default IP
parameters programmed in the INP10 card are:
IP Address: 10.0.0.1
Subnet Mask: 255.255.255.0
Set up Ethernet Communication with a PC: You
need to establish communication between your PC
and the meter in order to configure the meter’s IP
address so that it will communicate on your Network.
1.Select Start>Control Panel>Network Connections.
You will see the screen shown on the right.
2.Right-click on the Local Area Connection you will use to
communicate with the meter and select Properties. You
will see the screen below, on the left.
3.Select Internet Protocol [TCP/IP] and click the Properties
button. You will see the screen below, on the right.
4.Click Use the Following IP Address radio button and enter:
IP Address:10.0.0.100
Subnet Mask:255.255.255.0
5.Click OK and then Close to close the two screens.
6.Connect the meter’s RJ45 port to your PC’s Ethernet port using a
standard Ethernet cable.
7.Open your web browser, type http://10.0.0.1. in the address bar
and press Enter. You will see the screen shown on the right.
Reset
Button
Connect
Ethernet
cable
here

Doc# E145753 V.1.04 QS - 3
Shark® 100BT Quickstart
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
NOTE: If you don’t see the screen, reset the meter: insert a pointed tool, for example, a ballpoint pen,
in the Reset button for 30 seconds (see figure at the top of page QS-2 for the Reset button’s location).
Repeat step 7.
8.Enter the following default settings:
User name: admin
Password: admin
9.Click OK. You will see the BACnet/IP
Home webpage, shown on the right.
10.Click BACnet/IP Settings on the
left side of the webpage to see
the page shown below, on the
right.
11.Click in the IP/Address field and
change the meter’s factory-set IP
address (10.0.0.1) to an IP address
in the same subnet as your
Network. Contact your System
Administrator if you are unsure of
the address to use.
12.Click OK at the bottom of the
webpage.
13.Click Activate Configuration on
the left side of the webpage to
display the screen shown on the right.
14.Click Confirm. You will see a
message that the configuration has
been saved and the meter is
rebooting.
15.Disconnect the meter’s RJ45 cable
from your PC and connect it to your
Network.
Software Connection: connect to the meter at its
new IP address so you can configure it.
1.Open CommunicatorPQATM software (you can
download the software from the CD that came
with the meter).
2.Click Connect in the tool bar. You will see the
Connect screen, shown on the right.

Doc# E145753 V.1.04 QS - 4
Shark® 100BT Quickstart
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
3.Enter the meter’s new IP address in the Host field and click Connect. The Device Status screen
opens, confirming the connection.
4.Click OK. CommunicatorPQATM software’s Main screen opens.
Configuration Steps:
5.Click the Profile button in the tool bar. You will see the
Shark 100B Profile screen, shown on the right.
6.Click the Scaling tab and select settings based on your
application. The entry fields are as follows:
CT Numerator - enter the value you want to use.
CT Denominator (display only - can’t be changed).
CT Multiplier - select from 1, 10 and 100.
CT Fullscale (Calculated automatically)
PT Numerator - enter the value you want to use.
PT Denominator - enter the value you want to use.
PT Multiplier - select from 1, 10, 100, and 1000.
PT Fullscale (Calculated automatically)
System Wiring: select from 3 Element Wye, 2.5 Element
Wye, or 2 CT Delta.
Phases Displayed: select from A, AB, or ABC.
NOTE: Voltage Full Scale = PT Numerator x PT Multiplier; Current Full Scale = CT Numerator x CT
Multiplier
IMPORTANT! Specify Primary and Secondary Voltage in Full Scale (NOT Ratios).
Example CT Settings:
200/5 Amps: set the Ct-n value as 200, Ct-S value as 1.
800/5Amps: set the Ct-n value as 800, Ct-S value as 1.
2000/5 Amps: set the Ct-n value as 2000, Ct-S value as 1
10,000/5 Amps: set the Ct-n value as 1000, Ct-S value as 10.
Example PT Settings:
14400/120 Volts: set the Pt-n value as 1440, Pt-d value as 120, Pt-S value as 10.
138000/69 Volts: set the Pt-n value as 1380, Pt-d value as 69, Pt-S value as 100.
345000/115 Volts: set the Pt-n value as 3450, Pt-d value as 115, Pt-S value as 100.
345000/69 Volts: set the Pt-n value as 345, Pt-d value as 69, Pt-S value as 1000.
Update Device:
7.Click the Update button to send the new settings to the meter.
NOTE: For additional wiring options, programming screens, and instructions on using the Shark®
100BT’s BACnet®*, refer to the Shark® 100/100T/100B Meter Installation and Operation Manual and
the CommunicatorPQATM, MeterManagerPQATM, and EnergyPQA.comTM Software User Manual on the
enclosed CD.
Shark® is a registered trademark of Electro Industries/GaugeTech. The distinctive shape, style, and overall appearance of the
Shark® meter is a trademark of Electro Industries/GaugeTech.
*BACnet is a registered trademark of ASHRAE.
Table of contents
Other Shark Measuring Instrument manuals
Popular Measuring Instrument manuals by other brands

Integra
Integra CALEC ST II Installation and operation manual

Sentera Controls
Sentera Controls SPV-8-010-PM Mounting and operating instructions

Extech Instruments
Extech Instruments 401027 user manual

Kobold
Kobold HND-C110 operating instructions

Texas Instruments
Texas Instruments PHP2700 manual

Fuji Electric
Fuji Electric ZPAJ instruction manual