
7.3 Circuit diagram ................................................................................................................ 128
7.4 System integration........................................................................................................... 129
7.4.1 Connection notes............................................................................................................. 129
7.4.1.1 Motor connection ............................................................................................................ 129
7.4.1.2 Rotating the connector at the motor................................................................................. 130
7.4.1.3 Routing cables in a damp environment............................................................................. 133
7.4.2 Power connection............................................................................................................ 133
7.4.3 Signal connection ............................................................................................................ 134
7.4.3.1 Motors with DRIVE-CLiQ interface..................................................................................... 134
7.4.3.2 Motors without a DRIVE-CLiQ interface............................................................................. 135
7.4.3.3 Design of the signal connectors........................................................................................ 136
7.4.4 Connecting-up a converter............................................................................................... 137
7.4.4.1 Selecting and connecting the cables................................................................................. 137
7.4.4.2 Instructions for handling the RJ45 connector.................................................................... 140
7.4.4.3 Handling the quick-action locking..................................................................................... 143
8 Commissioning .................................................................................................................................. 147
8.1 Safety instructions ........................................................................................................... 147
8.2 Checklists for commissioning ........................................................................................... 150
8.3 Preparing commissioning................................................................................................. 152
8.4 Commissioning procedure................................................................................................ 153
8.5 Switching on and switching o ........................................................................................ 154
9 Operation........................................................................................................................................... 155
9.1 Safety instructions ........................................................................................................... 155
9.2 Switching on and switching o ........................................................................................ 157
9.3 Operation ........................................................................................................................ 158
9.4 Measures for longer non-operational periods.................................................................... 159
10 Faults ................................................................................................................................................. 161
11 Service and maintenance .................................................................................................................. 165
11.1 Safety instructions ........................................................................................................... 165
11.2 Inspection and maintenance ............................................................................................ 168
11.2.1 Thread sizes and tightening torques for fastening bolts..................................................... 170
11.2.2 Bearing replacement interval ........................................................................................... 170
11.2.3 Checking and changing lubricants.................................................................................... 171
11.2.3.1 Checking the oil level ....................................................................................................... 171
11.2.3.2 Checking the oil level using the oil sight glass (optional)................................................... 172
11.2.3.3 Checking the oil quality.................................................................................................... 173
11.2.3.4 Changing the oil .............................................................................................................. 173
11.2.3.5 Recommended oil types................................................................................................... 176
11.2.3.6 Change the roller bearing grease...................................................................................... 177
11.2.3.7 Service life of the lubricants ............................................................................................. 178
11.2.3.8 Recommended lubricants................................................................................................. 179
11.2.3.9 Oil quantities ................................................................................................................... 181
11.2.4 Checking the gearbox for leaks......................................................................................... 181
11.2.5 Cleaning the servo geared motor ..................................................................................... 182
Table of contents
SIMOTICS S-1FG1 servo geared motor
Operating Instructions, 12/2022, A5E47360747B/RS-AC 5