First commissioning
•Before you open the water supply, check again that the filter housing is screwed.
•The unit have to be checked for possible leaks. If required, the connectionscan be
retightened.
• Never override safety devices.
• You are responsible for security in the workspace.
• The filter must be necessarily emptied before frost damage, to prevent damage
of system.
Technical data
•Nominal pressure (max.) 10 bar
•Working pressure (max.) 5 bar (0.5 Mpa)
•Water temperature 55 °C
•Water flow 850 l/h
•Connections Input: 1" internal thread and Output : 1" internal thread .
Facilities:
Vent (1)
brass internal thread (2)
Filter housing (3)