Source SEM-REDL User manual

Self-Test
Self-Test ttings perform a self-commissioning test at rst power on. After charging for 24 hours a full duration test (3 hours) is
performed. Initial function and duration tests are randomly generated.
They are then performed in accordance with standard requirements (every 30 days for function tests and every 52 weeks for
duration tests).
A single bi-colour indicator LED is tted in all Self-Test products. This LED is clearly visible for manual inspection. It indicates the
module status.
The LED shows permanent green or ashing green when conditions are normal and ashing red if a fault condition is present.
Function test
A function test is a 2 minutes test that simulates a mains failure and checks the operation of the emergency light source from the
battery supply.
The local indicator LED slow ashes green whilst the 2 minutes function test is in progress.
If there is a failure during a function test the local indicator LED changes to a ashing red.
Duration test
A duration test simulates a mains failure. It also checks the operation of the emergency light source from the battery supply for
the rated duration of the module.
The local indicator LED fast ashes green whilst the duration test is in progress.
If there is a failure during a duration test the local indicator LED either changes to ashing red.
The battery is required to be fully charged before a duration test can be started.
Installation &
Self Test Instructions
LED EMERGENCY SURFACE DOWNLIGHT
PRODUCT CODE: SEM-REDL
Quality
Assurance
years
Unit 7/8 Ashbourne Business Centre, Ballybin Road, Ashbourne, Co. Meath, Ireland, A84 YP58,
Phone: 00353 1 835 7447
Unit 32 Junction One Business Park, Valley Road, Birkenhead, Merseyside, UK, CH41 7ED,
UK Ph: 0330 551 7000
Website: www.sgd.ie
For more information contact:
Product end of life instruction.
This Lighting product is in the scope of EU 2019/2020 directive on Waste Electrical and Electronic Equipment
(WEEE). This product must be disposed of, according to the legislation. This document is intended for use by
end of life recyclers or treatment facilities. It provides the basic information to assure an appropriate end of life
treatment for the components and materials of the product.
Please follow pictured diagram on the back of this manual showing how to dismantle the product into di󰀨erent
components which should be disposed correctly. These components would consist of plastic, metal and
electronic materials.
It is the responsibility of the end user to dispose of this product correctly. www.weeeireland.ie or contact your
local council for further information.
DISASSEMBLY INSTRUCTIONS
Unclip downlight in
order to recycle
Unclip battery from driver in
order to recycle both items
correctly
IP20
COMPLIANT
Please refer to this chart for more complete description / fault indication
Test Button Status
Green LED Constant Mains On / No Fault
Green LED Slow Flash Function for 2 minutes
Green LED Fast Flash 3 hour duration Test
Red LED 1 Flash Battery Fault
Red LED 2 Flash Lamp Fault
Red LED 3 Flash Duration Test Fault
Safety Instructions
1. This product must be installed in accordance with the latest WEE Wiring Regulations (BS7671) and current building
regulations. If in any doubt, consult a qualied electrician.
2. Please isolate mains prior to installation or maintenance.
3. Check the total load on the circuit (including when this luminaire is tted) does not exceed the rating of the circuit cable, fuse
or circuit breaker.
4. Please not the IP (Ingress Protection) rating of this luminaire when deciding the location for installation
5. Allow 50mm above and around the tting for air dissipation (do not cover the tting with insulation)
6. This product is a Class II double insulated
7. This product is IP20 rated
8. These instructions should be read carefully and retained after insulation by the end user for future reference and
maintenance.
Installation
• Provide power to the required point of installation
• Cut a suitable hole in the mounting surface as per the cut out details (g 1) ensuring not to
infringe with joists, gas/water pipes or electrical cables
• Connect the luminaire to the mains supply via a suitable junction box ensuring that correct
polarity is observed: Live (brown) and Neutral (blue) (See Fig. 2)
• Connect the battery to the inverter via the plug and socket provided, ensuring correct
polarity is observed
• Connect the downlight to the inverter via the plug and socket
provided
• Change the bezel, if required, by unscrewing from the downlight and
replacing with the required bezel.
• Place the inverter and battery into the ceiling via the cut-out
• Lift both spring clips on the sides of the tting and push into the
ceiling
• Switch on and check for correct operation, ensuring the green
indicator LED is illuminated
• We recommend, on commissioning the installation, a minimum charge period of 24 hours before carrying out an emergency
duration test.
Warning
This luminaire must be disconnected from the circuit if subjected to any high voltage or insulation resistance testing. Irreparable
damage will occur if this instruction is not followed. This product has a warranty of 5 years (excluding battery) from date of
purchase. Failure to install this product in accordance with the current edition of the IEE Wiring Regulations, improper use, or
removal of the batch codes will invalidate the warranty. If this product should fail within its warranty period it should be returned to
the place of purchase for a free of charge replacement. SGD does not accept responsibility for any installation costs associated
with the replacement product. Your statutory rights are not a󰀨ected. SGD reserve the right to alter product specication without
prior notice.
Daily check - check that the status GREEN LED
indicator is illuminated.
Monthly functional test - simulate a mains supply
failure for approx. 30 secs by operation of key switch
or switching o󰀨 a circuit breaker. Ensure normal
supply is restored after test and the indicator status
LED is illuminated.
Twice yearly conduct a one hour duration test
- simulate a mains supply failure for one hour
continuous test by operation of key switch or switching
o󰀨 circuit breaker. Ensure normal supply is restored
after test and the indicator status LED is illuminated.
Annual full three hour duration test - conduct a three
hour continuous duration test. Simulate a mains
supply failure for three hour continuous test by
operation of key switch or switching o󰀨 circuit breaker.
Ensure normal supply is restored after test and the
indicator status LED is illuminated.
If the luminaire fails any of the above tests, please contact a qualied electrician. See overleaf for test record sheet. All Emergency
lighting tests must be logged. The Emergency lighting logbook must be provided in order to be covered by any warranties.
EMERGENCY TESTING
After connecting the mains supply check the following:
1. The unit should be left on charge for a minimum of 24 hours before testing the emergency mode
2. There is one green indicator in the middle. After power is on, the LED indicator will be on. The LED indicator is o󰀨 when the
xture is in emergency mode
3. To simulate normal mains supply failure, operate your key switch
4. The lamp will now light under emergency conditions
5. When the unit no longer meets its rated duration of operation, the battery pack must be replaced with a battery of the same
type, voltage and AMP-hour rating
6. All Emergency lighting tests must be logged. The Emergency lighting logbook must be provided in order to be covered by
any warranties.
Testing and commisioning for Emergency Luminaire
• Ensure the load is connected
• Connect the battery
• Switch on the Unswitched Supply - Check the charge LED illuminates
• Switch on the Maintained Supply - Check the LED illuminates as normal
• Switch o󰀨 the Maintained Supply
• Switch o󰀨 the Unswitched Supply - Check the charge LED extinguishes and the load LED illuminated at a reduced output
• Enter the commissioning date on the battery pack. Switch on the Unswitched supply.
Emergency Installation and Inspection
Serial/ Luminaire Number:
Installation / Test
Installed By: Date:
Record
Commissioned By: Date:
Year 1 Year 3*
*Recommended Battery Change LiFe P04
Year 4
Monthly test Signed Date Signed Date Signed Date Signed Date
1
2
3
4
5
6
7
8
9
10
11
12
Year 2*
*Recommended Battery Change NiCd
3.2V 1.5Ah LiFePO4
3.2V 1.5Ah LiFePO4
3.2V 1.5Ah LiFePO4
85
27
∅
29
29.5
150.5
Unit of length:mm
INSTALLATION & MAINTENANCE MANUAL
These instructions should be read carefully and retained after installation by the end user for future reference
and maintenance.
These instructions should be used to aid installation of the following product:
EMPOWER3
SAFETY
•This product must be installed in accordance with the latest edition of the IEE Wiring Regulations
(BS7671) and current Building Regulations. If in any doubt, consult a qualified electrician
•Please isolate mains prior to installation or maintenance
•Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of
the circuit cable, fuse or circuit breaker
•Please note the IP (Ingress Protection) rating of this luminaire when deciding the location for
installation
•Allow 50mm above and around the fitting for air dissipation (do not cover the fitting with insulation)
•This product is Class II double insulated
•This product is IP20 rated
INSTALLATION
•Provide power to the required point of installation
•Cut a suitable hole in the mounting surface as per the cut-out details (see Fig. 1) ensuring not to
infringe with any joists, gas/water pipes or electrical cables
Fig. 1
•Connect the luminaire to the mains supply via a suitable junction box ensuring that correct polarity is
observed: Live (brown) and Neutral (blue) (see Fig. 2)
Fig. 2
•Connect the battery to the inverter via the plug and socket provided, ensuring that correct polarity is
observed
INSTALLATION & MAINTENANCE MANUAL
These instructions should be read carefully and retained after installation by the end user for future reference
and maintenance.
These instructions should be used to aid installation of the following product:
EMPOWER3
SAFETY
•This product must be installed in accordance with the latest edition of the IEE Wiring Regulations
(BS7671) and current Building Regulations. If in any doubt, consult a qualified electrician
•Please isolate mains prior to installation or maintenance
•Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of
the circuit cable, fuse or circuit breaker
•Please note the IP (Ingress Protection) rating of this luminaire when deciding the location for
installation
•Allow 50mm above and around the fitting for air dissipation (do not cover the fitting with insulation)
•This product is Class II double insulated
•This product is IP20 rated
INSTALLATION
•Provide power to the required point of installation
•Cut a suitable hole in the mounting surface as per the cut-out details (see Fig. 1) ensuring not to
infringe with any joists, gas/water pipes or electrical cables
Fig. 1
•Connect the luminaire to the mains supply via a suitable junction box ensuring that correct polarity is
observed: Live (brown) and Neutral (blue) (see Fig. 2)
Fig. 2
•Connect the battery to the inverter via the plug and socket provided, ensuring that correct polarity is
observed
EMPOWER3 INSTRUCTIONS SPREADS.indd 5-8EMPOWER3 INSTRUCTIONS SPREADS.indd 5-8 17/08/2020 08:46:3417/08/2020 08:46:34
INSTALLATION & MAINTENANCE MANUAL
These instructions should be read carefully and retained after installation by the end user for future reference
and maintenance.
These instructions should be used to aid installation of the following product:
EMPOWER3
SAFETY
•This product must be installed in accordance with the latest edition of the IEE Wiring Regulations
(BS7671) and current Building Regulations. If in any doubt, consult a qualified electrician
•Please isolate mains prior to installation or maintenance
•Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of
the circuit cable, fuse or circuit breaker
•Please note the IP (Ingress Protection) rating of this luminaire when deciding the location for
installation
•Allow 50mm above and around the fitting for air dissipation (do not cover the fitting with insulation)
•This product is Class II double insulated
•This product is IP20 rated
INSTALLATION
•Provide power to the required point of installation
•Cut a suitable hole in the mounting surface as per the cut-out details (see Fig. 1) ensuring not to
infringe with any joists, gas/water pipes or electrical cables
Fig. 1
•Connect the luminaire to the mains supply via a suitable junction box ensuring that correct polarity is
observed: Live (brown) and Neutral (blue) (see Fig. 2)
Fig. 2
•Connect the battery to the inverter via the plug and socket provided, ensuring that correct polarity is
observed
INSTALLATION & MAINTENANCE MANUAL
These instructions should be read carefully and retained after installation by the end user for future reference
and maintenance.
These instructions should be used to aid installation of the following product:
EMPOWER3
SAFETY
•This product must be installed in accordance with the latest edition of the IEE Wiring Regulations
(BS7671) and current Building Regulations. If in any doubt, consult a qualified electrician
•Please isolate mains prior to installation or maintenance
•Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of
the circuit cable, fuse or circuit breaker
•Please note the IP (Ingress Protection) rating of this luminaire when deciding the location for
installation
•Allow 50mm above and around the fitting for air dissipation (do not cover the fitting with insulation)
•This product is Class II double insulated
•This product is IP20 rated
INSTALLATION
•Provide power to the required point of installation
•Cut a suitable hole in the mounting surface as per the cut-out details (see Fig. 1) ensuring not to
infringe with any joists, gas/water pipes or electrical cables
Fig. 1
•Connect the luminaire to the mains supply via a suitable junction box ensuring that correct polarity is
observed: Live (brown) and Neutral (blue) (see Fig. 2)
Fig. 2
•Connect the battery to the inverter via the plug and socket provided, ensuring that correct polarity is
observed
EMPOWER3 INSTRUCTIONS SPREADS.indd 5-8EMPOWER3 INSTRUCTIONS SPREADS.indd 5-8 17/08/2020 08:46:3417/08/2020 08:46:34
Declaration Number:
103-SEM-REDL
This declaration of conformity is issued under the sole responsibility of the manufacturer.
Products:
Emergency Led Downlighter IP20 3Watt 6500K C/W 3 Bezels LIfePo4
Model Number:
SEM REDL
The product/model of the declaration described above is in conformity with the relevant
Community harmonisation legislation:
Low Voltage Directive (2014/35/EU)
EMC (2014/30/EU)
The product/model of the declaration described above is in conformity with the standards
and technical specifications listed below:
EN60598-2-22:2014, EN60598-1:2015, EN62493:2015, EN62471:2008, EN55015:2013+A1,
EN61547:2009, EN6100-3-2:2014, EN61000-3-3: 2013.BS EN 62034:2012
Signed 19/10/2022

Other Source Lighting Equipment manuals

Source SEM-IP20 TW SP User manual

Source

Source SEM-IP20 TW SP User manual

Source SFES10M User manual

Source

Source SFES10M User manual

Source SEM-EXB-P04 User manual

Source

Source SEM-EXB-P04 User manual

Source SEM-CH-EXSIGN User manual

Source

Source SEM-CH-EXSIGN User manual

Popular Lighting Equipment manuals by other brands

PR Lighting TANGO FRAMING manual

PR Lighting

PR Lighting TANGO FRAMING manual

Cree XLamp ML Family LEDs manual

Cree

Cree XLamp ML Family LEDs manual

Alkalite Krypton KT-81 user manual

Alkalite

Alkalite Krypton KT-81 user manual

Griven Colorway User manual/instructions

Griven

Griven Colorway User manual/instructions

Gewiss CHORUSMART GW16003S Series manual

Gewiss

Gewiss CHORUSMART GW16003S Series manual

V-TAC VT-7571 Installation instruction

V-TAC

V-TAC VT-7571 Installation instruction

Lighthouse Lightning Bolt instruction manual

Lighthouse

Lighthouse Lightning Bolt instruction manual

Chauvet Mega Trix user manual

Chauvet

Chauvet Mega Trix user manual

Chauvet Professional COLORdash Par-Quad 18 Quick reference guide

Chauvet Professional

Chauvet Professional COLORdash Par-Quad 18 Quick reference guide

Elation SEVEN PAR 19IP user manual

Elation

Elation SEVEN PAR 19IP user manual

Clas Ohlson JF8010-UK instruction manual

Clas Ohlson

Clas Ohlson JF8010-UK instruction manual

LEDWORKS Twinkly squares Instruction guide

LEDWORKS

LEDWORKS Twinkly squares Instruction guide

Signature Hardware WOODBERRY 941443 quick start guide

Signature Hardware

Signature Hardware WOODBERRY 941443 quick start guide

Pulsar CHROMA Series manual

Pulsar

Pulsar CHROMA Series manual

LEDWORKS Twinkly Generation II Light Tree instruction manual

LEDWORKS

LEDWORKS Twinkly Generation II Light Tree instruction manual

Cineo Matchstix 2700 user guide

Cineo

Cineo Matchstix 2700 user guide

RIGE DMX 300W user manual

RIGE

RIGE DMX 300W user manual

Spectroline NANO 365 Series manual

Spectroline

Spectroline NANO 365 Series manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.