
+1 800-SPIRENT – www.spirent.com
Spirent Setup Guide:
Information subject to change.
71-008027 Ver. A3
Multilink Duplexing Test System - Vertex
Page 1 of 11
Instruction
1 Make sure the loopback cable is connected on the rear panel of the
Vertex instrument.
2 Connect the AC power cords to all instruments.
3 Plug the AC power cords into the wall outlet.
4Plug the Vertex instrument directly into the wall outlet on an individual
branch circuit.
5 Switch on the Vertex instrument.
6SwitchonXD5-A.
7SwitchonXD5-B.
8 Ensure each instrument powers up properly.
Applying Power to the System
ATTENTION!
Perform the following procedure after you have
completed all cable routing.
Equipment Layout
Instruction
1 Ensure the AC power cords are NOT connected to wall outlets.
2 Ensure the XD5s are configured as XD5-A and XD5-B.
3Connect the cables by following the instructions on the following pages.
4 After the cables are connected, power up the equipment according to
the instructions provided in the " Applying Power to the System" table
below.
Assembly Procedure
Vendor Model # Qty
Spirent Vertex 1
Spirent XD5-A 1
Spirent XD5-B 1
System Components
NOTE:
IfonlyoneXD5isinuse,itmustbeconfiguredasanXD5‐A
unit.IftwoXD5sareinusebyoneVertex,thoseunitsmustbe
configuredasXD5‐AandXD5‐Brespectively.
ConnectingtwoXD5sofsimilarnametypeassignmenttoa
singleVertexwillcauseIPconflictproblems.Toreconfigure
theXD5'stype,youmustusetheVertexGUI.SeetheVertex
usermanualformoreinformation.
POWER
I
O
X2
X1
Z2
Z1
Z3 Z4
Q2Q1
Q3 Q4
U8U7
U6U5
U4U3
U2U1
M7M6
M3M2
M5
M1
CONFIGURATION STATUS
M8
M4
XD5
MULTILINK DUPLEXER
POWER
I
O
X2
X1
Z2
Z1
Z3 Z4
Q2Q1
Q3 Q4
U8U7
U6U5
U4U3
U2U1
M7M6
M3M2
M5
M1
CONFIGURATION STATUS
M8
M4
XD5
MULTILINK DUPLEXER