
You should have:
• 1 Radiator
• 1 Manual Airvent
Your chosen mounting option out of the following;
• 2 Wall Brackets & 2 Wall Ties (up to 20 sections)
• 3 Wall Brackets & 3 Wall Ties (26 section radiator)
• 2 Floor Mounts & 2 Wall Ties (up to 20 sections)
• 3 Floor Mounts & 3 Wall Ties (26 section radiator)
• 2 Slip on Feet & 2 Wall Ties (up to 20 sections)
• 3 Slip on Feet & 3 Wall Ties (26 section radiator)
• 4 Stud wall brackets (up to 18 sections)
• 6 Stud Wall brackets (22 to 26 section radiator)
You will need:
• Tape measure
• Electric drill and bits
2. Contents
Steel Multi Column radiators ideally should sit on wall brackets, this makes
them less visible when fitted. Wall brackets are typically positioned two or
three sections in from either end (please see drawing 1 on other page).
The Wall bracket is a tap screw, use a rubber mallet or length of wood to
prevent chipping paint when fixing in position. Fit the wall ties onto the
back of the radiator; two sections in from each end with the wall fixing
facing into the centre of the radiator.
4. Mark Bracket Positions
6. Hang & Commission
With all bracket positions marked and / or fixed, the radiator is placed
in its final position for valve and pipe work connections. Please ensure
the flow is connected to the correct end nearest the diverter (please see
Drawing 2 on other page).
When commissioning your radiator on an indirect/closed system we
recommend using a suitable quality & quantity of mixed metal inhibitor to
protect against scale & corrosion.
Damage caused to systems not protected by a suitable inhibitor will
not be covered by manufacturer’s guarantee.
All products must be inspected once removed
from the packaging and your point of purchase
notified within 28 days of delivery of any scratches,
blemishes or other damage. Your point of purchase
will then agree appropriate action.
Imperfect radiators should therefore not be fitted
and we will not accept responsibility for replacement
of scratched or damaged radiators once they have
been fitted. This includes any consequential loss or
cost of fitting.
If we are not notified within 28 days of the date on
the signed delivery note then it will be deemed that
we have fully complied with our obligations and
claims will not be considered.
Failure to comply with any of the above may
invalidate any claims. We recommend that after you
check the product on delivery that it is stored in its
packaging to prevent damage prior to installation,
we cannot accept responsibility for items damaged
after delivery.
For full details of our Terms and Conditions please
visit www.supplies4heat.co.uk or call us on 01342
306880.
Terms & Conditions
This product is guaranteed for 5 years. As we are not the manufacturers of this product we will take
all reasonable endeavours to make over to you the benefit of any warranty or guarantee given by the
manufacturer. The guarantees in all cases are subject to the products being installed in accordance
with British and or European standards as well as these fitting instructions. The guarantees in all
cases are restricted to the free of charge replacement or repair of the failed product only. Our liability
will under no circumstances extend beyond the repair or replacement of the product supplied by us.
Claims for either labour in replacement or damage to property are not admissible. Any goods that are
returned, in the event of a problem, will belong to us.
Guarantees & Liabilities
Technical Specifications
Materials Mild Steel.
Connections ½” flow and return.
Test pressure 13 Bar
Testing authority EN442
Maximum operating pressure 10 Bar
Maximum working temperature 110ºC
Packaging Wrapped in polyethylene with cardboard protectors.
Check the positions of the brackets are level and using a suitable drill bit
and rubber mallet fix the brackets in position.
When the wall brackets are firmly fixed, place the radiator in position
and mark the location of the wall tie fixings with a long pencil. Remove
radiator and drill holes and place wall plugs for the wall ties, replace
radiator and secure the wall ties.
PLEASE NOTE: It is essential that all brackets are level to ensure a vertical
alignment for connecting the pipework.
5. Fix Brackets / Feet
www.supplies4heat.co.uk 01342 306880
The Cornel is supplied with four factory fitted bushes. At
the top should be the blanking plug and the ½" air vent
bush.
At the bottom are two ½” bushes for flow and return
connections. A diverter is fitted within the first two
sections in the lower water way directly below the
blanking plug end. The flow must be connected to this
side (please see diagram overleaf).
3. Orientation
PLEASE NOTE: Systems using micro bore pipework must have adequate pressure and
flow rates for the number and style of radiators on the system.
• Spirit level
• Suitable screws and plugs