manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Supplies4Heat
  6. •
  7. Heater
  8. •
  9. Supplies4Heat Radcliffe User manual

Supplies4Heat Radcliffe User manual

Other Supplies4Heat Heater manuals

Supplies4Heat Woburn User manual

Supplies4Heat

Supplies4Heat Woburn User manual

Supplies4Heat SAXON User manual

Supplies4Heat

Supplies4Heat SAXON User manual

Supplies4Heat BEAUFORT Slim User manual

Supplies4Heat

Supplies4Heat BEAUFORT Slim User manual

Supplies4Heat CORNEL User manual

Supplies4Heat

Supplies4Heat CORNEL User manual

Supplies4Heat BEAUFORT Vertical User manual

Supplies4Heat

Supplies4Heat BEAUFORT Vertical User manual

Popular Heater manuals by other brands

Porter-Cable PCXH80KT Operating instructions and owner's manual

Porter-Cable

Porter-Cable PCXH80KT Operating instructions and owner's manual

Dyna-Glo RA18LPDG user manual

Dyna-Glo

Dyna-Glo RA18LPDG user manual

Dimplex PLX050E instruction manual

Dimplex

Dimplex PLX050E instruction manual

EOS Herkules XL S120 installation instructions

EOS

EOS Herkules XL S120 installation instructions

Trebs Comfortheat 99209 manual

Trebs

Trebs Comfortheat 99209 manual

Biddle STYLE2 Series Installation operation & maintenance

Biddle

Biddle STYLE2 Series Installation operation & maintenance

Vermont Castings Non-Catalytic Convection Heater 2477CE Installation and operating manual

Vermont Castings

Vermont Castings Non-Catalytic Convection Heater 2477CE Installation and operating manual

Fagor RA-1505 Instructions for use

Fagor

Fagor RA-1505 Instructions for use

THERMAL FLOW Delta 175 Operating instructions manual

THERMAL FLOW

THERMAL FLOW Delta 175 Operating instructions manual

GET G2CH instructions

GET

GET G2CH instructions

ApenGroup PK Series User, installation, and maintenance manual

ApenGroup

ApenGroup PK Series User, installation, and maintenance manual

oventrop Regucor Series quick start guide

oventrop

oventrop Regucor Series quick start guide

Blaze King CLARITY CL2118.IPI.1 Operation & installation manual

Blaze King

Blaze King CLARITY CL2118.IPI.1 Operation & installation manual

ELMEKO ML 150 Installation and operating manual

ELMEKO

ELMEKO ML 150 Installation and operating manual

BN Thermic 830T instructions

BN Thermic

BN Thermic 830T instructions

KING K Series Installation, operation & maintenance instructions

KING

KING K Series Installation, operation & maintenance instructions

Empire Comfort Systems RH-50-5 Installation instructions and owner's manual

Empire Comfort Systems

Empire Comfort Systems RH-50-5 Installation instructions and owner's manual

Well Straler RC-16B user guide

Well Straler

Well Straler RC-16B user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Pipe centres left to right =
Pipe centres from wall =
Depth from wall =
Drawings
Pipe Centres
1. Unpack & Inspect
This product should have reached you in perfect condition. Please carefully unpack and inspect this radiator and all fittings. Your point of purchase
must be notified of any shortages or damage within 28 days of delivery. For further information please see terms and conditions on reverse.
www.supplies4heat.co.uk 01342 306880
Please read these instructions and terms and conditions carefully
prior to installation. Failure to do so may invalidate the warranty.
Radcliffe
Fitting Instructions
Drawing 1 - Fixing Positions for Brackets
width plus valves
65mm
96mm
width
width
96
50
65
153
A
B
C
D
E
177
103
103
103
103103
103
RADC1.3
You should have:
• 1 Radiator
• 4 Bracket Closing Caps
• 4 Bracket Hooks
• 4 Bracket Back Plates
• 4 Bracket Screws
You will need:
• Tape measure
• Electric drill and bits
• Spirit level
• Airvent key
• Appropriate wall fixings
• Spanner for valves and
vents
2. Contents
Technical Specifications
Materials Aluminium
Connections ½" flow and return.
Test pressure 9 Bar
Testing authority EN442
Maximum operating pressure 6 Bar
Maximum working temperature 90 ºC
Packaging Polystyrene protection in cardboard box
All products must be inspected once removed
from the packaging and your point of purchase
notified within 28 days of delivery of any
scratches, blemishes or other damage. Your
point of purchase will then agree appropriate
action.
Imperfect radiators should therefore not be
fitted and we will not accept responsibility for
replacement of scratched or damaged radiators
once they have been fitted. This includes any
consequential loss or cost of fitting.
If we are not notified within 28 days of the
date on the signed delivery note then it will be
deemed that we have fully complied with our
obligations and claims will not be considered.
Failure to comply with any of the above may
invalidate any claims. We recommend that
after you check the product on delivery that it is
stored in its packaging to prevent damage prior
to installation, we cannot accept responsibility
for items damaged after delivery.
For full details of our Terms and Conditions
please visit www.supplies4heat.co.uk or call us
on 01342 306880.
Terms & Conditions
This product is guaranteed for 10 years. As we are not the manufacturers of this product
we will take all reasonable endeavours to make over to you the benefit of any warranty
or guarantee given by the manufacturer.
The guarantees in all cases are subject to the products being installed in accordance with
British and or European standards as well as these fitting instructions. The guarantees in
all cases are restricted to the free of charge replacement or repair of the failed product
only. Our liability will under no circumstances extend beyond the repair or replacement
of the product supplied by us. Claims for either labour in replacement or damage to
property are not admissible. Any goods that are returned, in the event of a problem,
will belong to us.
Guarantees & Liabilities
www.supplies4heat.co.uk 01342 306880
Refer to diagrams overleaf when installing
1. Accurately mark bracket holes on the wall using a tape measure
and spirit level. The bracket centres are positioned 153mm down
from the top collector, and 103mm from either side.
(Height of the radiator from floor : minimum 100mm)
2. Using suitable drill bits and plugs, insert suitable wall plugs. To
hang the top two brackets, secure the backplate ‘A’ with screws ‘B’
(or other suitable screws) going through into the wall plugs.
3. Insert the bracktets ‘C’ down into the back plate ‘A’ and secure
with the provided screw ‘D’. Then fit the closing cap ‘E’ on top.
3. Installing radiator
Please Note: In accordance with Part L1 2006 of
the Building Regulations and BS7593:1992 code of
practice for the treatment of hot water and central
heating systems, we strongly recommend flushing
the heating system post installation of new radiators
and then adding the correct quantity and type of
inhibitor for use with your radiator and system to
prevent corrosion. Damage caused to systems not
protected by a suitable inhibitor will not be covered
by manufacturer’s guarantee.
5. Commission Radiator
Please Note: the diverter is marked with a yellow
cap and is fitted on the radiator. The diverter can
be removed and swapped to the other side if
required. However, we will not be liable for any
damages to the radiator or paint finish as a result
of moving the diverter.
4. Hang the radiator on the second space
5. With the brackets in the correct position,
take down the radiator and fit the bottom
two brackets by repeating steps 1 to 4.
E
D
C
A
PLEASE NOTE: To reduce the possibility of noise caused by rapid heating and cooling
of aluminium radiators; adequate capacity for expansion must be provided within
the overall heating system. Systems using micro bore pipework must have adequate
pressure and flow rates for the number and style of radiators on the system.