2.3.1 General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines
Always follow TI’s setup and application instructions, including use of all interface components within the
recommended electrical rated voltage and power limits. Always use electrical safety precautions to help
verify your personal safety and those working around you. Contact TI's Product Information Center http://
support/ti./com for further information.
Save all warnings and instructions for future reference.
WARNING
Failure to follow warnings and instructions can result in personal injury, property damage or death
due to electrical shock and burn hazards.
The term TI HV EVM refers to an electronic device typically provided as an open framed, unenclosed printed
circuit board assembly. It is intended strictly for use in development laboratory environments, solely for qualified
professional users having training, expertise and knowledge of electrical safety risks in development and
application of high voltage electrical circuits. Any other use and/or application are strictly prohibited by Texas
Instruments. If you are not suitably qualified, then immediately stop from further use of the HV EVM.
1. Work Area Safety
a. Keep work area clean and orderly.
b. Qualified observers must be present anytime circuits are energized.
c. Effective barriers and signage must be present in the area where the TI HV EVM and the interface
electronics are energized, indicating operation of accessible high voltages can be present, for the
purpose of protecting inadvertent access.
d. All interface circuits, power supplies, evaluation modules, instruments, meters, scopes and other related
apparatus used in a development environment exceeding 50Vrms/75VDC must be electrically located
within a protected Emergency Power Off EPO protected power strip.
e. Use stable and nonconductive work surface.
f. Use adequately insulated clamps and wires to attach measurement probes and instruments. No
freehand testing whenever possible.
2. Electrical Safety
As a precautionary measure, it is always a good engineering practice to assume that the entire EVM can
have fully accessible and active high voltages.
a. De-energize the TI HV EVM and all the inputs, outputs and electrical loads before performing any
electrical or other diagnostic measurements. Revalidate that TI HV EVM power has been safely de-
energized.
b. With the EVM confirmed de-energized, proceed with required electrical circuit configurations, wiring,
measurement equipment connection, and other application needs, while still assuming the EVM circuit
and measuring instruments are electrically live.
c. After EVM readiness is complete, energize the EVM as intended.
WARNING
While the EVM is energized, never touch the EVM or the electrical circuits, as they can be at
high voltages capable of causing electrical shock hazard.
3. Personal Safety
a. Wear personal protective equipment (for example, latex gloves or safety glasses with side shields) or
protect EVM in an adequate lucent plastic box with interlocks to protect from accidental touch.
Limitation for safe use:
EVMs are not to be used as all or part of a production unit.
www.ti.com Hardware
SLUUCW5 – NOVEMBER 2023
Submit Document Feedback
Using the UCC28750EVM-071 60-W AC to DC Converter 5
Copyright © 2023 Texas Instruments Incorporated