manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Textron
  6. •
  7. Construction Equipment
  8. •
  9. Textron Greenlee ALUMINUM SITE-RITE 840A User manual

Textron Greenlee ALUMINUM SITE-RITE 840A User manual

INSTRUCTION MANUAL
ALUMINUM SITE-RITE®
HAND BENDERS
840A, 841A, 842A, 843A,
840AH, 841AH and 842AH
AND
IRON SITE-RITE®HAND BENDERS
840F, 841F, 842F, 843F,
840FH, 841FH, and 842FH
Read and understand this material
before operating or servicing this
equipment. Failure to understand how to
safely operate this tool could result in an
accident causing serious injury or death.
52034125 © 2008 Greenlee Textron Inc. 4/08
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
SITE-RITE®Hand Benders
Greenlee / A Textron Company
2
Description
The Greenlee aluminum SITE-RITE®and iron SITE-RITE®benders are
manually powered tools intended to bend 1/2" through 1-1/4" EMT
(electrical metallic tubing) and 1/2" through 1" rigid and IMC conduit.
Purpose
This instruction manual is intended to familiarize operators and
maintenance personnel with the safe operation of the Greenlee
SITE-RITE®Manual Benders. This manual should be kept available to all
operating personnel.
A person who has not read and does not
understand all operating instructions is not
qualified to operate this tool.
Failure to read and understand safety instructions
may result in injury or property damage.
Inspect the tool for wear or damage. Replace worn, damaged,
or missing components with Greenlee replacement parts.
A worn, damaged, or improperly assembled component may fail,
resulting in injury or property damage.
Use this tool for manufacturer’s intended use only. Use other than
that for which the tool was intended may result in injury.
All specifications are nominal and may change as design improvements
occur. Greenlee Textron Inc. shall not be liable for damages resulting
from misapplication or misuse of its products.
KEEP THIS MANUAL
Additional copies of this manual are available
upon request at no charge.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
SITE-RITE®Hand Benders
3
Bending — Handle Up
LINE OF
SIGHT
PIN
ARROW
90° 60° 45° 30° 22-1/2° 10°
APPLY FOOT
PRESSURE HERE
FLOOR LINE
45°
1. Mark the conduit.
2. Insert the conduit into the bender so that the arrow is aligned with
the bending mark.
3.
Place one foot on the bender as illustrated. Use heavy foot pressure
on the bending shoe; maintain this pressure throughout the bend.
4. Look down the line of sight as illustrated. Stop bending when the
pin is in line with the appropriate angle mark.
Note: Overbend rigid conduit slightly to compensate for springback.
Bending — Handle Down
10°22
1
/
2
°30° 45° 60°
90°
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
SITE-RITE®Hand Benders
Greenlee / A Textron Company
4
Bending — Handle Down (cont’d)
1. Mark the conduit.
2. Insert the conduit into the bender so that the arrow is aligned with
the bending mark.
3. Position the bender as shown, with your body as close to the bender
as possible.
4. With the handle angled to prevent slipping, apply constant pressure
against the conduit throughout the bend.
5. Bend until the edge of the conduit is in line with the degree scale as
illustrated.
Note: Overbend rigid conduit slightly to compensate for springback.
Bending Tips:
• Line up all bends in the same plane.
• Bend 1/2" and 3/4" EMT with the handle down.
• Bend 1" and 1-1/4" conduit with the handle up.
• When bending with the handle up, work at a stairwell or loading dock
so that previously made bends hang over the edge.
Marking the Conduit for 90° Stubs
Mark A Mark B
Arrow
DEDUCT
HEIGHT OF STUB
HEIGHT
OF
STUB
1. Measure the length of the required stub.
2. Measure and mark the stub length on the conduit. This is Mark A.
3. See the Deduct length shown on the bender. Subtract the Deduct
length from Mark A and make a new mark. This is Mark B.
4. Align Mark B with the arrow on the bender and bend the conduit
to 90°.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
SITE-RITE®Hand Benders
5
Correcting Overbends
If a stub-up is accidentally overbent, place the open end of the bender
handle over the conduit and manipulate to desired angle.
Back-to-Back 90° Stubs
FINISH LINE
MARK
MARK
1. Make the first 90° stub.
2. Fit the bent conduit into its final position and mark the Finish Line
on the conduit, as shown. The Finish Line on the conduit is the
bending mark.
3. Align the bending mark with the tip of the star and bend the conduit
to 90°.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
SITE-RITE®Hand Benders
Greenlee / A Textron Company
6
Offset Bends
An offset is used to re-route the conduit to avoid an obstruction.
An offset consists of two equal opposing bends.
Two factors must be considered when selecting the offset angle. First, a
steeper bend angle will require more pulling force. Second, a shallower
bend angle will require more space.
Greenlee Offset Table
(applies to any size conduit)
Offset Angle Multiplier Shrink Per Inch
of Offset Depth
10° x 10° 6.0 1/16" per inch
22-1/2° x 22-1/2° 2.6 3/16" per inch
30° x 30° 2.0 1/4" per inch
45° x 45° 1.4 3/8" per inch
60° x 60° 1.2 1/2" per inch
Working Past an Obstruction
OBSTRUCTION
14"8"
8"
10" DEPTH
MARK A MARK B
45°
Example 1: Working Past an Obstruction
45° x 45°, 10 inches of offset
1. Determine the center-to-center distance. Use one of these two
methods:
• Find the appropriate multiplier in the Offset Table, Column 2.
(For 45° x 45°, the multiplier is 1.4). Multiply the height of the
obstruction by the multiplier (10" x 1.4 = 14).
•
See the Greenlee Speed Guide for Offsets. In the Offset Depth Inches
column, find the row with the appropriate amount of offset. Find
the Center-to-Center column under the appropriate OFFSET ANGLE.
The distance shown at the intersection of the appropriate row and
column is the center-to-center distance. (Under Offset Depth Inches,
see the row labeled “10”. Read to the right to find the Center-to-
Center distance under 45° x 45°. The number shown is 14".)
2. Mark the conduit as shown.
3. See the bending instructions.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
SITE-RITE®Hand Benders
7
Working Toward an Obstruction
When working toward an obstruction, the conduit will appear to “shrink.”
To compensate for shrinkage, use the shrink per inch of offset as
shown in the Offset Table, Column 3 or the Shrink Amount shown in the
Greenlee Speed Guide for Offsets.
Greenlee Speed Guide for Offsets
(applies to any size conduit)
Offset
Depth
Inches
Offset Angle
22-1/2° x 22-1/2°
30° x 30° 45° x 45° 60° x 60°
Center
-to-
Center
Shrink
Amount
Center
-to-
Center
Shrink
Amount
Center
-to-
Center
Shrink
Amount
Center
-to-
Center
Shrink
Amount
2 5-1/4" 3/8"
3 7-3/4" 9/16" 6" 3/4"
4 10-1/2" 3/4" 8" 1"
5 13" 15/16" 10" 1-1/4" 7" 1-7/8"
6 15-1/2" 1-1/8" 12" 1-1/2" 8-1/2" 2-1/4" 7-1/4" 3"
7 18-1/4"
1-5/16"
14" 1-3/4" 9-3/4" 2-5/8" 8-3/8" 3-1/2"
8 20-3/4" 1-1/2" 16" 2" 11-1/4" 3" 9-5/8" 4"
9 23-1/2" 1-3/4" 18" 2-1/4" 12-1/2" 3-3/8"
10-7/8"
4-1/2"
10 26" 1-7/8" 20" 2-1/2" 14" 3-3/4 12" 5"
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
SITE-RITE®Hand Benders
Greenlee / A Textron Company
8
Working Toward an Obstruction (cont’d)
OBSTRUCTION
14"
33-3/4"
45° 10" DEPTH
MARK B MARK A
30"
Example 2: 45° x 45°, Working Toward an Obstruction
10 inches of offset
1. Calculate the shrinkage. See the Offset Table, Column 3. (The
amount of shrink for 45° x 45° offsets is 3/8" per inch of offset
depth. 3/8 x 10 = 3-3/4")
2. Measure the distance to the obstruction. Add the shrinkage to this
distance. (See the illustration. The distance to the obstruction is 30".
30" + 3-3/4" = 33-3/4)
3. Determine the center-to-center distance. Use one of these two
methods:
• Find the appropriate multiplier in the Offset Table, Column 2.
(For 45° x 45°, the multiplier is 1.4). Multiply the height of the
obstruction by the multiplier (10" x 1.4 = 14).
• See the Greenlee Speed Guide for Offsets. In the Offset Depth
Inches column, find the row with the appropriate amount of offset.
Find the Center-to-Center column under the appropriate OFFSET
ANGLE. The distance shown at the intersection of the appropriate
row and column is the center-to-center distance. (Under Offset
Depth Inches, see the row labeled “10”. Read to the right to find
the Center-to-Center distance under 45° x 45°. The number
shown is 14".)
4. Mark the conduit as shown.
5. See the bending instructions.
3-Bend Saddles
Like an offset, a saddle is used to avoid an obstruction. In this case,
three bends are used. The first and last bends are of the same degree;
the center bend is twice the number of degrees of the other two bends.
See the illustrations.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
SITE-RITE®Hand Benders
9
3-Bend Saddles (cont’d)
Table for 45° Saddles
(applies to any size conduit)
Saddle
Depth
Place center Mark “A”
ahead of actual center by
Place Marks “B” & “C”
each way from center
1" 3/16" 2-1/2"
2" 3/8" 5"
3" 9/16" 7-1/2"
4" 3/4" 10"
5" 15/16" 12-1/2"
6" 1-1/8" 15"
For each
additional
inch add:
3/16" 2-1/2"
A 45°
BENDING SEQUENCE
BC
22-1/2° 22-1/2°
2" DIAMETER
15"
5"5"
18-3/8"15-3/8"
MARK B MARK A MARK C
Example 3: 3-Bend Saddle 45° center bend, 2" obstacle
1. Calculate the shrinkage. See the Greenlee Offset Table, Column 3.
(The amount of shrink for a 22-1/2° bend is 3/16" per inch of
obstacle. 3/16" x 2 = 3/8").
2.
Measure the distance to the center of the obstruction. Mark with this
distance on the conduit – this is point “A”. Add the amount of shrink to
this distance. (Place the mark 15-3/8" from the end of the conduit.)
3. Refer to the Table for 45° Saddles for the locations of Mark B and
Mark C. (Place both marks, Mark B and Mark C, 5 inches from Mark A.)
4. Use the bending sequence as illustrated. Align Mark A with the
notch near the star. Align Marks B and C with the arrow.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com
USA
An ISO 9001 Company • Greenlee Textron Inc. is a subsidiary of Textron
Inc.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com

This manual suits for next models

13

Other Textron Construction Equipment manuals

Textron GREENLEE 766 M5 User manual

Textron

Textron GREENLEE 766 M5 User manual

Textron Greenlee 1818 User manual

Textron

Textron Greenlee 1818 User manual

Textron JACOBSEN TH300 Setup guide

Textron

Textron JACOBSEN TH300 Setup guide

Textron GREENLEE 854 User manual

Textron

Textron GREENLEE 854 User manual

Textron Greenlee HPB55 Series User manual

Textron

Textron Greenlee HPB55 Series User manual

Textron GREENLEE IntelliBENDER 855GX User manual

Textron

Textron GREENLEE IntelliBENDER 855GX User manual

Textron 555C User manual

Textron

Textron 555C User manual

Textron Greenlee 882 User manual

Textron

Textron Greenlee 882 User manual

Textron GREENLEE GVIS 300 User manual

Textron

Textron GREENLEE GVIS 300 User manual

Textron Greenlee Quad Bender 853 User manual

Textron

Textron Greenlee Quad Bender 853 User manual

Textron Greenlee ALUMINUM SITE-RITE Series User manual

Textron

Textron Greenlee ALUMINUM SITE-RITE Series User manual

Textron GREENLEE UT4 User manual

Textron

Textron GREENLEE UT4 User manual

Textron Greenlee 854DX User manual

Textron

Textron Greenlee 854DX User manual

Textron GreenLee 555 Series User manual

Textron

Textron GreenLee 555 Series User manual

Textron GREENLEE 884 User manual

Textron

Textron GREENLEE 884 User manual

Textron BROUWER TR130 Setup guide

Textron

Textron BROUWER TR130 Setup guide

Popular Construction Equipment manuals by other brands

Draco MB 200 manual

Draco

Draco MB 200 manual

Lumag MD500E Operator's manual

Lumag

Lumag MD500E Operator's manual

HEILA HLRM 35-5SL Operator's handbook

HEILA

HEILA HLRM 35-5SL Operator's handbook

Case 752EX Service manual

Case

Case 752EX Service manual

DEHACO DSG Operation and maintenance manual

DEHACO

DEHACO DSG Operation and maintenance manual

Fayat Group BOMAG BW 226 DH-4 Service manual

Fayat Group

Fayat Group BOMAG BW 226 DH-4 Service manual

KRAUSE STABILO Assembly instruction

KRAUSE

KRAUSE STABILO Assembly instruction

Reliance RC Series Operation manual

Reliance

Reliance RC Series Operation manual

PFT RITMO XL operating instructions

PFT

PFT RITMO XL operating instructions

Fayat Group BOMAG BW 219 DH-5 Service manual

Fayat Group

Fayat Group BOMAG BW 219 DH-5 Service manual

HYVA Crane HB Series Operation and maintenance manual

HYVA

HYVA Crane HB Series Operation and maintenance manual

MKT V-5ESC installation guide

MKT

MKT V-5ESC installation guide

Komatsu D51EX-24 Operation & maintenance manual

Komatsu

Komatsu D51EX-24 Operation & maintenance manual

Graco LINE LAZER GM 5000 Series Instructions and parts list

Graco

Graco LINE LAZER GM 5000 Series Instructions and parts list

XPOtool 62022 Operation manual

XPOtool

XPOtool 62022 Operation manual

Komatsu WB140-2N Shop Manual

Komatsu

Komatsu WB140-2N Shop Manual

Belle Group PORTO SCREED Operator's manual

Belle Group

Belle Group PORTO SCREED Operator's manual

Festool MX 1600/2 EQ DUO Original instructions

Festool

Festool MX 1600/2 EQ DUO Original instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.