Transient Modules u2X DIY build manual - Version 1.0
11. Place all the jack sockets and leds,
and then place the front panel moving a
little the parts if necessary. Screw the 8x
knurled nuts making sure they're
centered with the circles on the silkscreen
of the panel.
Solder all the parts ensuring they're all
positioned through their holes in the
panel.
NOTE! A'/.0494/&0$&%$45.$,.-+$/+$vital<$!5.$,&01$
,.1$+5&6,-$89475$45.$B$+:8;&,$&%$45.$+/,?+7'..0C
12. Connect the ribbon cable. The red
stripe on the cable must line up with the
-12V indication on the module’s power
connector. And...
2$D$$$$$$$$$$)&-6,.$E0/+5.-C$$$$$$$$$$2$D$
Something is not working as it should? *
Did you like the build manual? *
Had problems during the build process? *
Are you missing any part? *
Do you have any suggestions to make the build process better? *
Were you soldering slighlty drunk and did a mess? *
* Based in real e-mails.
If everything went fine: congratulations and enjoythe module!