
Vertiv™ NetSure™ 7100 -48 VDC Power System Installation Manual
TABLE OF CONTENTS
Admonishments Used in this Document.............................................................................................................................iv
Important Safety Instructions..................................................................................................................................................v
Static Warning ........................................................................................................................................................................... viii
1Customer Documentation Package..................................................................................................................................1
2Installation Acceptance Checklist ....................................................................................................................................1
3Installing the System ............................................................................................................................................................2
3.1 General Requirements..............................................................................................................................................................................................................................................2
3.2 Mounting the System in an Equipment Rack.....................................................................................................................................................................................3
3.3 Installing Optional Lug Adapter Busbar Kits .......................................................................................................................................................................................4
3.4 Installing Optional EIB (Controller Extended Interface Board) ..........................................................................................................................................5
3.5 Installing Circuit Breakers and Fuses.........................................................................................................................................................................................................7
4Setting Jumper and Switch Options.............................................................................................................................10
4.1 Location of Circuit Cards with Jumper and Switch Options .............................................................................................................................................10
4.2 Jumper Settings on the System Interface Circuit Card..........................................................................................................................................................11
4.3 Switch Settings on the IB2 (Controller Interface Board)........................................................................................................................................................12
4.4 Switch Settings on Optional EIB (Controller Extended Interface Board)...............................................................................................................13
5Making Electrical Connections .......................................................................................................................................14
5.1 Important Safety Instructions.........................................................................................................................................................................................................................14
5.2 Wiring Considerations............................................................................................................................................................................................................................................14
5.1 Power System Frame Grounding Connection..................................................................................................................................................................................15
5.2 Central Office Ground Connection .............................................................................................................................................................................................................15
5.3 AC Input and Equipment Grounding Connections (Nominal 208 VAC, 240 VAC, 277 VAC, Single Phase) .........................15
5.4 External Alarm, Reference, Monitoring, and Control Connections ..............................................................................................................................18
5.4.1 Location of Circuit Cards with External Alarm, Reference, Monitoring, and Control Connectors ........................... 18
5.4.2 System Interface Circuit Card Connections (if required) ..............................................................................................................................19
5.4.3 IB2 (Controller Interface Board) Connections (if required) ..........................................................................................................................21
5.4.4 Optional EIB (Controller Extended Interface Board) Connections (if required).......................................................................26
5.5 NCU Controller Ethernet Connection (if required) .....................................................................................................................................................................31
5.6 Load Connections .....................................................................................................................................................................................................................................................33
5.6.1 Load Connections to Distribution Panels and Load Return Busbars.................................................................................................33
5.6.2 Load Connections to an Optional Bullet Nose 6-Position GMT Distribution Fuse Block, P/N 549017.............. 34
5.7 Battery Connections ...............................................................................................................................................................................................................................................35
6Installing Rectifier Modules.............................................................................................................................................36
7Initially Starting, Configuring, and Checking System Operation.......................................................................37
7.1 Important Safety Instructions.........................................................................................................................................................................................................................37
7.2 Initial Startup Preparation..................................................................................................................................................................................................................................37
7.3Initially Starting the System .............................................................................................................................................................................................................................37
7.4 NCU Controller Initialization ............................................................................................................................................................................................................................37
7.5 Verifying and Setting the NCU Controller as Required for Your Application...................................................................................................39
7.6 Checking System Status....................................................................................................................................................................................................................................42
7.7 Final Steps .......................................................................................................................................................................................................................................................................42