
Vertiv |NetSure™ 5100 Series -48 VDC Power System Installation Manual (IM582137200)|Rev. J
TABLE OF CONTENTS
Admonishments Used in this Document............................................................5
Important Safety Instructions ..............................................................................6
General Safety .......................................................................................................................................................... 6
Voltages.......................................................................................................................................................................... 6
AC Input Voltages........................................................................................................................................................6
DC Output and Battery Voltages ..................................................................................................................6
Battery ...............................................................................................................................................................................7
Personal Protective Equipment (PPE)............................................................................................. 8
Hazardous Voltage.............................................................................................................................................. 8
Handling Equipment Containing Static Sensitive Components............................. 8
Maintenance and Replacement Procedures.............................................................................. 8
Static Warning...........................................................................................................9
Customer Documentation Package....................................................................11
Installation Acceptance Checklist......................................................................11
Installing the System............................................................................................. 13
General Requirements....................................................................................................................................13
Securing the Relay Rack to the Floor (if furnished) .........................................................13
Securing the System to a Relay Rack or a Cabinet Equipment Rack
(if required)................................................................................................................................................................15
Securing the System Vertically to a Wall with P/N 553203Kit (if
furnished) .................................................................................................................................................................... 17
Securing the System Horizontally to a Wall with P/N 552537 or P/N
552535 Kit (if furnished)...............................................................................................................................19
Installing a List 93, 94 Battery Tray ................................................................................................. 22
Installing Circuit Breakers and Fuses ............................................................................................. 25
Installing an Optional Battery Cabinet............................................................................................27
Installing an Optional External IB4 Kit P/N 561929.......................................................... 28
Attaching the USB Drive Pouch to the System ...................................................................29
Setting Jumper and Switch Options ................................................................ 30
Circuit Card Locations...................................................................................................................................30
Jumper Settings on the System Interface Circuit Card................................................31
Switch Settings on the IB2 (Controller Interface Board) (if furnished) ........ 33
Making Electrical Connections .......................................................................... 35
Important Safety Instructions ................................................................................................................35
Wiring Considerations....................................................................................................................................35
Relay Rack / Cabinet Frame Grounding Connection......................................................35
System Shelves Frame Grounding Connection ...................................................................36
Central Office Ground Connection ...................................................................................................38
Rectifier Nominal 120 VAC / 208 VAC / 240 VAC Input and AC Input
Equipment Grounding Connections................................................................................................38
External Alarm, Reference, Monitoring, and Control Connections ....................41
Circuit Card Locations.......................................................................................................................................... 41