
Contents
Chapter 1 Overview ................................................................................................................................................... 1
1.1 Features......................................................................................................................................................... 1
1.2 Composition .................................................................................................................................................. 1
1.3 Design Concept.............................................................................................................................................. 2
1.3.1 System Design ..................................................................................................................................... 2
1.3.2 Bypass................................................................................................................................................. 2
1.3.3 System Control Principle ....................................................................................................................... 3
1.3.4 UPS Power Supply Switch Configuration ................................................................................................. 4
1.3.5 Battery Circuit Breaker (BCB) ................................................................................................................. 5
1.4 Parallel System............................................................................................................................................... 5
1.4.1 Parallel System Features........................................................................................................................ 5
1.4.2 Parallel System Requirements................................................................................................................ 6
1.5 Operation Mode............................................................................................................................................. 6
1.6 Battery Management (Set By Commissioning Engineer)................................................................................... 9
1.6.1 Normal Function .................................................................................................................................. 9
1.6.2 Advanced Function............................................................................................................................... 9
1.6.3 Battery Temperature Compensation .....................................................................................................10
1.7 Battery Protection (Set By Commissioning Engineer) ......................................................................................10
Chapter 2 Mechanical Installation.............................................................................................................................11
2.1 Notes............................................................................................................................................................11
2.2 Preliminary Check .........................................................................................................................................11
2.3 Environmental Requirements ........................................................................................................................11
2.3.1 UPS Location.......................................................................................................................................11
2.3.2 Battery Location..................................................................................................................................12
2.3.3 Storage ..............................................................................................................................................12
2.4 Positioning ...................................................................................................................................................13
2.4.1 Moving The Cabinet.............................................................................................................................13
2.4.2 Clearances ..........................................................................................................................................13
2.4.3 Cable Entry .........................................................................................................................................13
2.4.4 Final Positioning And Fixing..................................................................................................................13
2.5 Mechanical Installation..................................................................................................................................13
2.5.1 Installation drawing .............................................................................................................................13
2.5.2 Mechanical Connection Between Cabinets.............................................................................................14
2.5.3 Installing Power Module.......................................................................................................................15
Chapter 3 Electrical Installation ................................................................................................................................17
3.1 Power Cables ................................................................................................................................................17
3.1.1 System Configuration ..........................................................................................................................17
3.1.2 Maximum Steady State AC And DC Currents ..........................................................................................17
3.1.3 Distance From Floor To UPS Connection Point........................................................................................18
3.1.4 Notes .................................................................................................................................................18