
Warmup PLC – 702 Tudor Estate, Abbey Road, London NW10 7UW - UK
Tel: +44 20 8453 6868 Fax: +44 20 8453 6869 Website: www.warmup.eu
Fig. 1.0
Fig. 2.0
Fig. 6.0
Fig. 4.0
Fig. 7.0
Fig. 5.0
Fig. 3.0
Installation
1. Install a draw wire from the flush box to the 14mm exit
hole in the wall framing.
2. Screw the wall anchor into the wall anchor sleeve and then
insert into the pre-drilled hole. Fig 1.0
3. The draw wire will need to pass through the cable entry
fitting.
4. Push the appliance cable back through the leg. See Fig 2.0
5. Take care not to damage the cable when pushing it back
through the leg.
6. Remove the opaque plastic cable bush.
Optional: The larger nylon hole plug can be inserted if
required. See Fig 3.0
7. Connect the draw wire to the towel rail flex and pull the
flex through to the flush box. See Fig 4.0
8. Place the towel rail against the wall in the desired
position.
9. Using a fine pencil, or by gently pressing the rail against
the wall, mark the position of the remaining three rail
legs. See Fig 5.0
10. Screw the mounting inserts securely to the wall at the
locations marked. See Fig 6.0
11. Press the towel rail onto the mounting inserts gradually,
checking that each leg is lined up with the mounting
inserts before applying force. See Fig 7.0
12. Insert the small nylon hole plug into the underside of the
cable bush.
13. Screw grub screws into each of the four legs to secure the
rail.
14. Wire the cable into the isolating switch or time control
device.