Electrical connection
The electrical connection takes place by means of a safety socket 230 V ~ 50 Hz. Fuse protection
at least 10 Ampere.
The pump is turned on and off by means of a built-in ON-/OFF switch. The indicator lamp inside
the switch lights up if the engine is started.
The engine is protected against overloading or blocking by means of a built-in motor protection. In
case of overheating the pump is turned off automatically due to the overheat protection and after
its cooling, the pump is automatically started.
Suction pipeline
Connect a suction hose (plastic hose minimum 3/4"with spiral reinforcement) directly or with a
threaded fitting to the suction connection (intake connection) of the pump (1" Inside thread) of the
pump.
The suction hose that is used should have a suction valve. In case the suction valve cannot be
used, a check valve should be installed in the suction line.
Position the suction line on a rising gradient from the removal point towards the pump. Avoid lay-
ing the suction line over the pump height, air bubbles in the suction line delay and prevent the
suction process.
Suction and pressure line must be placed in such a way so that they exert no mechanical pres-
sure on the pump.
The suction valve should lie deeply enough in the medium to be pumped. This way the drop in the
fluid level prevents the pump from dry running.
A leaking suction line prevents the suction of the pumped medium by sucking in air.
Avoid sucking foreign particles (sand etc.).
Commissioning
Set up the pump on a fixed, flat place, where the temperature does not exceed 40°C. The pump
has to be placed in a horizontal position, so that the bearings can function properly, screw the
pump tight to its bottom part.
Bring the suction line ready for operation. The suction hose should not be narrower than the suc-
tion connection. If the suction lift exceeds 4 m, use a suction line with a larger diameter.
Elektrischen Connection herstellen.
Fill up the pump with the diesel or heating oil at the pressure port.
During the suction process the shut-off devices (pump nozzle and valve) in the pressure line must
be completely open, so that the air existing in the suction line can escape freely.
Depending on the suction lift and air volume in the suction line the first suction operation can take
approx. 0,5 min - 5 min. By longer suction times the medium to be pumped should be refilled.
If the pump is removed after being used, it has to be newly refilled before it is connected and op-
erated again.