Winton WCF Series User manual

WINTON COMPACT FLAIL MOWER
WCF SERIES
PLEASE READ THIS MANUAL BEFORE OPERATING THE MOWER
OWNERS MANUAL

Congratulaons on purchasing your new Winton mower!
Before you get started, we have provided a helpful space to jot down a few important
details about your new Winton machine.
Model Number: WCF
Serial Number:
Date of purchase:
Factory Reference: EF85/EF105
This manual should be considered a permanent part of this machine and should remain with it even if
the machine is subsequently sold.
Winton connually seeks advancements in its product design and quality. Therefore, while this manual
contains the most current product informaon available at the me of prinng, there may be minor
discrepancies between your machine and this manual.
If you have any quesons concerning this manual, please consult your local dealer.
First Published: November 2015

General Safety Informaon
Ensure all potenal operators read this manual thoroughly before using the machine.
Safety: Ensure tractor and machine is stopped & keys out of ignion before set-up/maintenance.
Safety: Failure to follow good safety standards could result in severe injury or even death.
Misuse: This machine is designed for use with compact tractors, and should be used only for the
indicated purpose. Winton does not take responsibility if the machine is used for any other
purpose. Children must not operate the machine under any circumstance.
Modicaon: Do not modify equipment in any way. This may impair the operaon and overall
safety of the machine.
Tractor requirements: Use only with compact tractors within power range specied.
Misuse transport: Do not use machinery to transport personnel or livestock.
Condion: For the safety of personnel and opmum performance of the machine, you should
check the condion of the machine and the tractor before starng. Before use check all nuts and
bolts are ght.
Spaal awareness: Always check the operang area is safe before starng machinery.
Operator clothing: The operator should not wear loose clothing while operang machinery.
Safety wear: Always use appropriate ear protecon when running a tractor and machinery.
Ensure you are wearing protecve gloves when servicing and using machinery.
Bystander safety: Ensure bystanders keep away from the machine when it is in use. Do not
touch moving parts when the machine is at work.
Public places: When travelling on the road/public places, always keep the PTO turned o.
Maintenance: Always keep the machine maintained and in a good state. Where necessary,
repair or replace any defecve parts. Do not modify the machine.
Sharp objects: Pay aenon to the sharp/pointed parts while servicing the machine.
Safety guards: All protecve parts should be in good condion before operang machinery.
Safety signs/sckers: Keep all safety signs clean and legible. Replace any which are missing or
illegible. If a component with safety sign/(s) is replaced, make sure new safety sign/(s) are
aached in the same locaons.
Operang speeds: Machinery and PTO should be operated at the recommended speed at all
mes.
Safety awareness: Good safety requires that you familiarise yourself with various safety signs,
the type of warning and the area, or parcular funcon related to that area.
Alertness: Never consume alcohol or drugs these can hinder alertness/coordinaon. Consult
your doctor about using this machine while taking prescripon medicaons.
1

General Safety Informaon (connued)
Machinery Pre-Use Checks
On receipt of your new Winton machine and again within the rst 4 hours of use, or the ‘shake
in’ period as we like to call it, we always recommend checking over the machine.
• Check all bolts, nuts and screws are ght on the unit.
• Tighten/check any bolts and nuts securing blades.
• If your machine has belts check the tension and adjust if required.
• Apply grease to grease points if necessary.
• Check gear oil level and top up if needed. Do not overll.
Tractor Pre-Use Checks
Check that the machine is properly aached to the tractor. Ensure that secure pins are used on
the linkage mounng pins.
Be sure to add extra weights to the front of the tractor or add wheel weights if required.
Check that the tractor PTO sha turns freely and that the machines PTO drive sha can extend
easily. Grease the PTO drive sha using the grease points.
The chain on the PTO sha should be checked and in a good condion. The universal joints
installed should be in a good state, with proper protecve parts.
Before installing the PTO sha, the tractor and machine should be stopped and remove the key.
Install and secure all safety guards, doors and covers before starng.
Bystanders should leave the immediate area before connecng the drive from the tractor.
Running/Operang Checks
• Always keep the PTO output from the tractor at 540 RPM when running machinery.
Post-Use Regular Checks
Check blades, belts and wearing parts. Be sure they are not damaged and blades swing freely in
their mount. Repair or replace as required.
Clean machinery and check for/clear any entangled material which may have got stuck around
any rotang parts.
2

V4 3Winton WCF
Contents
Pg.
General Safety informaon 1-2
1. Dimensions and Specicaons 3
2. Installaon & Set Up 4
3. Cung Height Adjustment 5
4. Gear Oil Change & Check 6
5. Adjusng Belt Tension 7
6. Parts Diagram 8
7. Parts List 9
8. Servicing & Maintenance 10
PTO Sha Resizing 11
Winton Product Warranty 12
Trouble Shoong 13
1. Dimensions & Specicaons
Model WCF85 WCF105
Weight 100kg 130kg
Working Width 80cm 103cm
PTO Turning Speed 540 RPM 540 RPM
Hammer Flail Type
Number Of Flails 12 18
Recommended Tractor HP 12-20 hp 15-25 hp
Width 100cm 118cm
Depth 70cm 70cm
Height 70cm 70cm
PTO Sha Size 70-90cm 70-90cm
Cung Height 3-8cm 3-8cm
Linkage Size Category 1 Category 1
Number Of Belts 33

V4 4Winton WCF
2. INSTALLATION & SET UP
Safety: Ensure tractor and machine is stopped & keys out of ignion before set-up/maintenance.
Safety: Before aaching/detaching machinery ensure the hydraulic li system is in a neutral posion.
Safety: Make sure the PTO drive isn’t connected at any point unl instructed to do so.
You will need:
Your tractor, tractor top link arm (adjustable), linkage pins, PTO sha & some elbow grease!
Aaching The Mower
Start by nding a at piece of ground. Lower the three point linkage on your tractor to its lowest
posion and aach the mower to the tractor using the three point linkage pins and linch pins.
With the rear roller on the mower on the ground, adjust the length of the top link arm so that the skids
at the side of the ail mower are parallel with the ground.
Then by hand rotate the blade rotor by hand so that a row of blades hang vercally towards the
ground to give an idea of the cung height. Check the clearance between the boom of the blades
and the ground, this should be at least 50mm.
The cung height can be set for longer grass by simply raising the hydraulic li arms on your tractor
or/and by adjusng the rear roller and skids on the machine to increase or decrease the blade
clearance as required [see secon on adjusng the cung height].
The working speed of the machine should always be at a walking pace (approx. 2 to 5 mph) depending
on the working condions. Overgrown grass and weeds should be cut at a much slower pace for the
best cut and to avoid any damage to the mower.
Check your PTO sha’s grease points and apply grease if needed. Then aach the PTO drive sha and
ensure the locking pin is secure on both the tractor and mower sides. Aach the chain to a secure point
on the tractor/implement.
Operate the ail mower the with tractor in low range gear and the PTO delivering 540 RPM.
Pre-Mowing Checklist
Before starng the machine, always check and adjust the following:
• Set correct cung height. [Secon 3]
• Oil level of the gearbox. [Secon 4]
• Tension of the drive belt [Secon 5]
• Lubricaon/grease points. [Secon 8]
• Tightness of all bolts, nuts and screws.
• All protecve guards are in place before operang.

V4 5Winton WCF
3. CUTTING HEIGHT ADJUSTMENT
Safety: Ensure tractor and machine is stopped & keys out of ignion before set-up/maintenance.
Note: Clearance of blades to the ground should be at least 50mm and higher on uneven ground.
Geng the cung height right is the key to creang the best cut and nish when mowing. This needs
to be adjusted depending on the lay of the land and also the length of grass and density of weeds.
The cung height can be set for longer grass by simply raising the hydraulic li arms on your tractor
or/and by adjusng the rear roller and skids on the machine.
Roller Adjustment
1. Loosen bolt 1 and remove bolt 2 on both sides of the machine.
2. Adjust roller by aligning the selected hole in the roller support bracket at posion 2 (using
the hole closest to the ground gives the highest working height).
3. Put bolt 2 into the selected hole and re-ghten bolts 1 and bolts 2.
Skid Adjustment
1. Loosen bolts 3 on the skids on the front & back of both sides of the machine.
2. Move the skids up or down to the desired height.
3. Re-ghten bolts 3.
3

V4 6Winton WCF
4. GEAR OIL CHANGE & CHECK
Safety: Ensure tractor and machine is stopped & keys out of ignion before set-up/maintenance.
Important Informaon
Oil Change/Check Gearbox
1. Remove ller plug 1.
2. Use an oil pump to extract all of the oil/debris from the gearbox.
3. Check oil using a ruler (gearbox should be half full). Top up if required and replace plug 1.
Oil Change/Check Drive Reservoir
1. Unscrew plugs 2 and 3.
2. Use an oil pump to extract all of the oil/debris.
3. Fill with new gear oil to the level plug 2.
4. Replace plugs 2 and 3.
Oil Change Log
Gear Oil Grade 80w90 gear oil for all condions (or equivalent)
Gearbox Oil Level Approx. 0.5 litres to half full
Drive Reservoir Oil Level Approx. 0.2 litres to level plug
First Oil Change 50 hours use
Oil Change Frequency 250 hours/yearly (whichever is rst)
Oil Change #1 Oil Change #2 Oil Change #3 Oil Change #4 Oil Change #5 Oil Change #6
/ / / / / / / / / / / /
123

V4 7Winton WCF
5. ADJUSTING BELT TENSION
Safety: Ensure tractor and machine is stopped & keys out of ignion before set-up/maintenance.
Correct Belt Tension
The correct belt tension is achieved when the belt can be deected by the belt thickness about
10mm at the centre point between the pulleys.
A generic measure across machines is the belt should be able to twist a quarter turn by hand. Any
more and they are too loose and any less and too ght, you may run the risk of losing drive to the
mower or burning the belts out prematurely.
Always use a straight edge to make sure the belt pulleys are in line and running true. If misaligned,
call your dealer or service engineer for technical support.
Belt Tensioning
1. Remove the belt cover.
2. Loosen the bolts A and B that lock the support sha.
3. Loosen o counter nut C.
4. Loosen bolts D securing the gear box to the mounng plate.
5. Adjust belt tension by adjusng the height of counter nut C.
6. Align the gearbox ensuring the drive sha is parallel with the body and re-ghten nuts D.
7. Tighten bolts A and B.
8. Replace the belt cover.

V4 8Winton WCF
Note: Fig. 29 Hammer Blade
not ‘Y’ blade, shown for illustraon only
765
9
11 10 (3)
15 14 (48) 13 12
16 17 18
19 20 21 (15) 22
23 24 25 26 27
8
4
321
28 29 30
(5) (6) (7)
(39) 53 52
51
(48)
(23)
49
50
(48)
(23) (15)
(15)
(23) (15) 48
65 66 (40) (52)
64 63 62
54 55 56
57
59 60 61
47 45
46
43 (31)
44
58
(53) (22) (23)
(15)
(22) (14)
(52)
(15) (22) (14)
35
36
(7)
37 38
42
39 40 41
(10) (11)
(24) 34 33 32 31
6. PARTS DIAGRAM
This manual suits for next models
2
Other Winton Tractor Accessories manuals

Winton
Winton WRT Series User manual

Winton
Winton WPH Series User manual

Winton
Winton WRP Series User manual

Winton
Winton WLR Series User manual

Winton
Winton WFM Series User manual

Winton
Winton TM110 User manual

Winton
Winton WTL Series User manual

Winton
Winton WVF Series User manual

Winton
Winton WRB Series User manual

Winton
Winton WTM Series User manual
Popular Tractor Accessories manuals by other brands

Ventrac
Ventrac KD482 Operator's manual & parts drawings

Original Tractor Cabs
Original Tractor Cabs 4421381 Assembly instructions and parts list

Grouser Products
Grouser Products 760 Owner's manual & parts book

Degelman
Degelman Landroller Operator's & parts manual

Bush Hog
Bush Hog BS1 Series Operator's manual

MX
MX MX A104 user manual















