ZCS ZUCCHETTI 22K-BE-24 User manual

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
1/44
AC charging station for electric vehicles
22K-BE-24
User Manual
V1.00 (25-05-2020)

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
2/44
General instructions
This manual contains important safety instructions that must be followed during installation and
maintenance of the equipment.
Please keep these instructions!
This manual must be considered an integral part of the equipment, and must be available at all times to
everyone who interacts with the equipment. The manual must always accompany the equipment, even
when it is transferred to another user or plant.
Copyright statement
Copyright of this manual belongs to Zucchetti Centro Sistemi S.p.A. No part of this manual may be
copied (including the software), reproduced or distributed in any form or by any means without the
permission of Zucchetti Centro Sistemi S.p.A. All rights reserved. ZCS reserves the right to final
interpretation. This manual is subject to change based on feedback from users, installers or customers.
Please check our website at http://www.zcsazzurro.com for the latest version.
Zucchetti Centro Sistemi
Via Lungarno 305/A
52028, Terranuova Bracciolini (AR)
+39 055 91971
info@zcscompany.com
http://www.zcscompany.com

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
3/44
Table of Contents
1. Preliminary safety instructions ..............................................................................................................7
1.1. Safety instructions..........................................................................................................................7
1.2. Symbols and icons ........................................................................................................................11
1.3. Labels............................................................................................................................................12
1. Product features ..................................................................................................................................12
1.4. Product presentation....................................................................................................................12
1.5. Operating diagram........................................................................................................................14
2. Installation ...........................................................................................................................................15
2.1. Checks before installation ............................................................................................................16
2.1.1. Installation tools.................................................................................................................................17
2.2. Installation process.......................................................................................................................19
2.2.1. Installation position............................................................................................................................19
2.2.2. Movement of the charger..................................................................................................................19
2.3. Materials and cables.....................................................................................................................20
3. Electrical connections ..........................................................................................................................20
3.1. Connecting PGND cables (grounding) ..........................................................................................21
3.2. Connecting the AC power cables..................................................................................................23
3.3. External protection devices..........................................................................................................24
3.4. Communication systems ..............................................................................................................24
4. Mounting..............................................................................................................................................26
4.1. Wall mounting ..............................................................................................................................26
4.2. Mounting on metal support .........................................................................................................27
4.3. Locking..........................................................................................................................................28
5. Commissioning.....................................................................................................................................29
5.1. Preliminary safety inspection.......................................................................................................29
5.2. Starting the charging station ........................................................................................................29
6. Configuration .......................................................................................................................................30
6.1. Procedure .....................................................................................................................................30

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
4/44
6.2. Password setting, mode of use and power limitation .................................................................31
6.3. Menu for repairs or maintenance ................................................................................................33
6.4. Configuration of RFID card (to enable charging in online and offline mode) ..............................34
7. Working mode .....................................................................................................................................36
7.1. Online ...........................................................................................................................................36
7.2. Offline ...........................................................................................................................................37
7.3. Plug&Play......................................................................................................................................38
8. Operation.............................................................................................................................................39
8.1. Connecting the charger to the electric vehicle ............................................................................39
8.2. Start of charging ...........................................................................................................................39
8.3. End of charging.............................................................................................................................40
9. Technical datasheet.............................................................................................................................40
10. Troubleshooting and maintenance..................................................................................................41
10.1. Troubleshooting ...........................................................................................................................41
10.2. Maintenance.................................................................................................................................43
11. Dismantling and disposal .................................................................................................................43
12. Warranty ..........................................................................................................................................44

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
5/44
Preface
General information
Please read this manual carefully before installation, use or maintenance. This manual contains
important safety instructions that must be followed during installation and maintenance of the system.
Scope
This manual describes the assembly, installation, electrical connection, commissioning, maintenance
and troubleshooting of the electric vehicle charging stations:
22K-BE-24
Keep this manual so that it is accessible at all times.
Recipients
This manual is intended for qualified technical personnel (installers, technicians, electricians, technical
support personnel or anyone who is qualified and certified to work on an electrical system), responsible
for installing, starting up and operating the charging station.
Symbols used
This manual provides information for safe operation and uses certain symbols to ensure the safety of
personnel and materials, and for efficient use of the equipment during normal operation.
It is important to understand this information to avoid accidents and damage to property. Please take
note of the following symbols used in this manual.
Danger: indicates a hazardous situation which, if not resolved or avoided,
could result in serious personal injury or death
Danger
Warning: indicates a hazardous situation which, if not resolved or
avoided, could result in serious personal injury or death
Warning
Caution: indicates a hazardous situation which, if not resolved or avoided,
could result in minor or moderate personal injury

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
6/44
Caution
Attention: indicates a potentially hazardous situation which, if not
resolved or avoided, could result in damage to the system or other
property
Attention
Note: provides important tips on the correct and optimal operation of the
product
Note

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
7/44
1. Preliminary safety instructions
If you have problems or questions in reading and understanding the
following information, please contact Zucchetti Centro Sistemi S.p.A.
through the appropriate channels.
Note
1.1. Safety instructions
Highlights the safety instructions to be followed during installation and use of the equipment.
Before installing and using the equipment, make sure you read and understand the instructions in this
manual and familiarise yourself with the relative safety symbols shown in this chapter. According to
national and local requirements, permission must be obtained from your local provider before
connecting to the electrical grid, making sure that the connections are carried out by a qualified
electrician. All installation work must be carried out by a qualified and competent electrician.
Contact the nearest authorised service centre for any repairs or maintenance. Contact your distributor
for information on the nearest authorised service centre. DO NOT carry out repairs yourself, as this may
result in injury or damage.
Qualified personnel
Ensure that the operator has the necessary skills and training to operate the equipment. Personnel
responsible for use and maintenance of the equipment must be qualified and capable of performing the
activities described, and must also have appropriate knowledge on how to correctly interpret the
contents of this manual. For safety reasons, this charging station can only be installed and serviced by a
qualified electrician with the necessary training and/or skills and knowledge. Zucchetti Centro Sistemi
S.p.A. declines all responsibility for damage to property or personal injury caused by incorrect use of the
device.
Do not attempt in any way to repair or replace components of the charging station without the
assistance of qualified personnel.
Installation requirements
Install and start the charging station according to the following instructions. Place the charging station
on suitable load-bearing supports with sufficient load capacity (such as metal walls or columns) and
make sure it is positioned vertically. Choose a suitable location for the installation of the electrical
equipment. Make sure there is sufficient space for heat dispersion and to accommodate future
maintenance. Maintain adequate ventilation and ensure that there is enough air circulation for cooling.

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
8/44
Do not place the charging station near explosive, flammable materials,
chemical vapours or potentially hazardous materials.
Danger
Figure 1 –Do not lose or damage this manual
Transport requirements
If you encounter problems with the packaging that could damage the charging station or if you find any
visible damage, immediately notify the transport company. If necessary, request assistance from an
installer or from Zucchetti Centro Sistemi S.p.A. Transport of the equipment, especially by road, must be
carried out with vehicles suitable to protect the components (in particular, electronic components)
against violent knocks, humidity, vibrations, etc.
Electrical connections
Please follow all the electrical regulations on accident prevention.

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
9/44
Before connecting the electrical cables, make sure to properly disconnect
the voltage on the AC connection cables, and do not connect any charging
cables for electric vehicles.
Danger
All installation operations must be carried out by a professional electrician,
who has carefully read this manual and understands its contents!
Warning
Before connecting the charging station to the grid, make sure that all the
necessary permits have been obtained from the local grid operator and
that all the electrical connections have been completed by a professional
electrician.
Attention
Do not remove the information label or tamper with the charging station.
Otherwise, ZCS will not provide any warranty or assistance
Note
Operation
Do not use the product if it has any defects, cracks, scratches or leaks, but contact your dealer or ZCS
technical service.
Contact with the electrical grid or the terminal of the equipment may
cause electrocution or fire!
•
Do not touch the terminal or the conductor connected to the electrical
grid.
•
Follow all the instructions and safety requirements relating to grid
connection
Danger

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
10/44
If the charging station is not functioning properly:
•
Immediately press the stop button located on the right side.
•
Disconnect the input and output power supply
Warning
Take special care when charging in thunderstorms or in rain
Attention
Figure 2 - Position of STOP button
Maintenance and repair
Keep the charging station clean and dry; if you need to clean it, use a clean dry cloth. It is very
dangerous to touch the inside of the charging station, therefore it is strictly forbidden to do so while the
system is running. NEVER clean the inside of the charging station with a wet or damp cloth.
•Before performing any repairs, disconnect the charging station from the
power supply (AC side) and from the data connection to the
transmission gate.
•After switching off the DC switch, wait 5 minutes before carrying out any
repairs or maintenance on the charging station
Danger
EMERGENCY BUTTON

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
11/44
•The charging station should start working again after any faults have
been fixed. For repairs, contact your local authorised service centre
•Do not disassemble the internal components of the charging station
without permission; this will void the warranty.
Attention
1.2. Symbols and icons
Introduces the main safety symbols on the charging station. Some safety symbols are located on the
charging station. Read and understand the contents of the symbols before installation:
Be careful of high voltage
Complies with the European Standards
Ground connection point
Read this manual before installing the charging station.
Degree of protection of the equipment according to the IEC 70- 1
standard (EN 60529 June 1997).
IP54 means that it is resistant against water and rust, therefore also
suitable for outdoor operation and maintenance.
Table 1 –Symbols present on the charger
’Smin"“’"
There is residual voltage in the inverter! Before opening the equipment,
wait five minutes to ensure that the capacitance has been completely
discharged.
Be careful of high voltage.
Be careful of high temperature.
Complies with European standards.
Ground connection point.
This indicates the allowed temperature range.
This indicates the degree of protection of the equipment according to
IEC standard 70-1 (EN 60529 June 1997).
Positive pole and negative pole of the input voltage (DC).

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
12/44
1.3. Labels
Figure 3 - Labels present on the charging station
1. Product features
1.4. Product presentation
The AC charging stations of the 22K-BE-24 series are electric vehicle battery chargers that can
communicate with the Battery Management System (BMS) of vehicles and provide them with the power
needed for charging, thus guaranteeing the protection of the electrical system. They do not convert the
mains voltage or current but simply regulate the flow and have internal protection devices in case of
DO NOT remove the labels. DO NOT cover
with sheets, supports, cabinets, etc.
Always keep them clean and legible.

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
13/44
short circuit or other types of battery faults. The charging station draws the energy needed from the
photovoltaic system (if present) or from the grid, depending on availability. The figure below shows a
typical installation (the photovoltaic system inside the barred box).
Figure 4 –Example of a charging station connected to a PV system (optional) and grid
The charging stations can only be connected to grids with voltage and frequency values within the range
specified in the technical datasheet. It is also very important to know the installation requirements in
order to understand exactly which configurations to adopt and which options to choose.
Accessories and optional components of the charging station should be chosen by a qualified technician
who is familiar with the installation conditions.
Overall dimensions: L × D × H = 452mm × 295mm × 148mm
L × D × H = 452mm × 295mm × 174.5mm (with wall support)

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
14/44
Figure 5 –Front and side view of the charging station
1.5. Operating diagram
Figure 6–Operating diagram of the charging station
The charging station connects to an electric vehicle via a Type2 connector (the cable is optional).
According to the standards, the charging station is identified with Type3 (wall-box) in which the station
is responsible for any power limitations, protections of various types and start-stop charging. No energy
conversion takes place inside the charging station.

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
15/44
Figure 7 - Type2 Connector
The station is equipped with a MID metering system that measures the energy supplied to the vehicle.
The possible connection with an external communication gate also allows remote control of the station,
invoicing of the energy and other functions. It is compatible with all types of cables and power sockets
in order to ensure safe charging.
It is designed according to the EN 61851-1:2011 and EN 61851-22:2002 international standards, which
makes it compatible with industry standards. It can be connected to internet via WiFi/Ethernet/4G and
then monitored via PC or app.
2. Installation
Figure 8 - Installation procedure
•DO NOT install the charging station near flammable materials.
•DO NOT install the charging station in an area where flammable or
explosive materials are stored.
Danger
•Take into account the weight of the charging station during transport
and installation.
•Choose an appropriate mounting position and surface.
Attention

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
16/44
2.1. Checks before installation
Checking the outer packaging
Packaging materials and components may be damaged during transport. Therefore, it is recommended
to check the materials of the outer packaging before installing the charging station. Check the surface of
the box for external damage such as holes or tears. If any type of damage is detected, do not open the
box containing the charging station and contact the supplier and the courier as soon as possible.
It is also recommended that you check the contents of the packaging and make sure that they
correspond to what was declared. If not, contact your dealer to have any missing parts sent to you.
Checking the product
After removing the charging station from its packaging, check that the product is intact and complete. If
any damage is found or components are missing, contact the supplier and transport company.
Contents of the packaging
No.
Part
Qty
1
Charging station
1
2
Screw with built-in washer
4
3
Front opening keys
2
4
RFID activation card
2

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
17/44
5
Expansion plug
4
6
Self-tapping screw
4
7
Wire ferrules
4
8
Wall support
1
9
Declaration of Conformity
1
10
User Manual
1
11
Warranty
1
Table 2 –Package contents
2.1.1. Installation tools
The following tools are required for the installation of the charging station and electrical connections;
therefore, they must be prepared before installation.

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
18/44
No.
Tool
Function
1
Screwdriver
To screw and unscrew screws
for the various connections
2
Drill
To drill holes in the wall for
fixing
3
Diagonal pliers
To cut and tighten the cable
ends
4
Crimping tool
To crimp the power cables
5
Wire stripping tool
To remove the outer sheath of
the cables
6
Rubber hammer
To insert the expansion plugs
into the wall holes
7
Multi-meter
To check the voltage and
current values
8
Marker pen
To mark the wall for better
fixing precision
9
Measuring tape
To measure distances

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
19/44
10
Level
To make sure the bracket is
level
11
ESD gloves
Protective clothing
12
Safety goggles
Protective clothing
Table 3 –Installation tools
2.2. Installation process
2.2.1. Installation position
Choose an appropriate installation location for the charging station. Follow the requirements below to
determine the installation position.
The installation location chosen should allow easy access to the charging station for normal operation
and maintenance.
For safety reasons, ZCS and/or its authorised partners may not perform repairs/maintenance or move
the chargers from and to the ground if they are installed at a height of more than 180 cm. Stations
installed at higher heights must be moved to the ground before they can be repaired or serviced.
2.2.2. Movement of the charger
1) Open the packaging and remove the polystyrene protection cover, insert your hands into the slots
and take hold of the device;
2) Lift the charging station from its packing box and move it to the installation position, then remove
the polystyrene protections.
•To prevent damage and personal injury, hold the device securely when
moving as it is a heavy piece of equipment
•Always position the device horizontally
Attention

Solo documento principale.
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 –Application: GID
Pile Reg. IT12110P00002965 - Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481 –AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
20/44
2.3. Materials and cables
First name
Specifications
Quantity
Power cord
≥ 5 × 6mm2 three-phase
Second requirement
Mains cable
STP, CAT5E, 8 cores
Second requirement
Connector for mains cable
RJ45
Second requirement
Insulating tape
0.15 mm × 18mm; 0-600V;
0°C-80°C
Second requirement
Cable tie
4 × 200mm
Second requirement
Table 4 - Electrical equipment
It is important that all cables used are suitable for outdoor use
NOTE: For safety reasons, make sure to use suitably sized cables, otherwise the current may cause
overheating or overloading, which could result in a fire.
Figure 9 - Logical sequence for connecting cables
3. Electrical connections
This chapter describes the electrical connections of the 22kW charging station. Carefully read this
section before connecting the cables. All the local, regional and national regulations must be complied
with during installation, repair and maintenance of the product.
Table of contents
Other ZCS Batteries Charger manuals