1A
Copyright 2023 ABB. All rights reserved.
www.abb.com
1B
2
Cu/AI
6mm-25Nm
Use thumbs to widen the side
walls and lift up the plastic cover.
Guide marks
Turn the z-clamp and the plastic
cover 180 degrees.
Z-clamp should be attached
to Z-Busbar correctly.
30
15
V-clamp connection
Note!
Pressure pad can be turned.
Rm Re Sm Se
25-50 25-50 35-50 35-70
Standard connection
M12-25Nm
DIN 46235(Cu)
DIN 46329 (AI)*
*Cable lug must be tin-coated.
Kabelschuh muss verzinnt sein.
电缆接头必须镀锡。
Al-conductors have to be brushed and greased before connection.
Al-Leiter müssen vor dem Anschluss gebürstet und gefettet werden.
铝导体在接线前必须去除氧化层并涂油。
IMPORTANT :
When mounting terminal kits, review dedicated
installation instruction!
185mm-Busbar system
Z-Busbar system
1 Pole 3 Pole
Close 90
Close 90
70-185
70-240 70-240 95-300
Cable terminals
from top
Low version
ZLBM
High version
ZHBM
M12-25Nm
185
185
Cable terminals from top.
6mm-20Nm
L3
L1
L2
35