ABB Relion 615 series User manual

RelionRelion
®®
Protection and ControlProtection and Control
IEC 61850IEC 61850
615 series615 series
Engineering GuideEngineering Guide


Document ID: 1MRS756475Document ID: 1MRS756475
Issued: 03.07.2009Issued: 03.07.2009
Revision: DRevision: D
Product version: 2.0Product version: 2.0
© Copyright 2009 ABB. All rights reserved© Copyright 2009 ABB. All rights reserved

This document and parts thereof must not be reproduced or copied without writtenThis document and parts thereof must not be reproduced or copied without written
permission from ABB, and the permission from ABB, and the
contents thereof must not be imparted to contents thereof must not be imparted to
a thirda third
party, nor used for any uparty, nor used for any u
nauthorized purpose.nauthorized purpose.
The software or hardware described in The software or hardware described in
this document is furnished under a this document is furnished under a
licenselicense
and may be used, copied, or disclosed only in accordance with the terms of suchand may be used, copied, or disclosed only in accordance with the terms of such
license.license.
ABB and Relion are registered trademarks of ABB Group. All other brand orABB and Relion are registered trademarks of ABB Group. All other brand or
product names mentioned in this doproduct names mentioned in this do
cument may be trademarks or registeredcument may be trademarks or registered
trademarks of their respective holders.trademarks of their respective holders.
Please inquire about the tPlease inquire about the t
erms of guarantee from your nearest ABB erms of guarantee from your nearest ABB
representative.representative.
ABB OyABB Oy
Distribution AutomationDistribution Automation
P.O. Box 699P.O. Box 699
FI-65101 Vaasa, FinlandFI-65101 Vaasa, Finland
Telephone: +358 10 2211Telephone: +358 10 2211
Facsimile: +358 10 22 41094Facsimile: +358 10 22 41094
http://www.abb.com/substationautomationhttp://www.abb.com/substationautomation

The data, examples and diagrams in this manual are included solely for the conceptThe data, examples and diagrams in this manual are included solely for the concept
or product description and are not to be deemed as a statement of guaranteedor product description and are not to be deemed as a statement of guaranteed
properties. All persons responproperties. All persons respon
sible for applying the equipment addressible for applying the equipment addres
sed in thissed in this
manual must satisfy themselves that each intended application is suitable andmanual must satisfy themselves that each intended application is suitable and
acceptable, including that any applicable safety or other operational requirementsacceptable, including that any applicable safety or other operational requirements
are complied with. In particular, any risks in are complied with. In particular, any risks in
applications where a system failure and/applications where a system failure and/
or product failure would create a risk for harm to property or persons (including butor product failure would create a risk for harm to property or persons (including but
not limited to personal injuries or death) shall be the sole responsibility of thenot limited to personal injuries or death) shall be the sole responsibility of the
person or entity applying the equipmenperson or entity applying the equipmen
t, and those so responsibt, and those so responsib
le are herebyle are hereby
requested to ensure that all measures are taken to exclude or mitigate such risks.requested to ensure that all measures are taken to exclude or mitigate such risks.
This document has been carefully checked by ABB but deviations cannot beThis document has been carefully checked by ABB but deviations cannot be
completely ruled out. In case any errors are detected, the reader is kindly requestedcompletely ruled out. In case any errors are detected, the reader is kindly requested
to notify the manufacturer. Other than under explicit contractual commitments, into notify the manufacturer. Other than under explicit contractual commitments, in
no event shall ABB be responsible or liable for any loss or damage resulting fromno event shall ABB be responsible or liable for any loss or damage resulting from
the use of this manual or the application of the equipment.the use of this manual or the application of the equipment.

This product complies with the directive of the Council of the EuropeanThis product complies with the directive of the Council of the European
Communities on the approximation of the laws of the Member States relating toCommunities on the approximation of the laws of the Member States relating to
electromagnetic compatibility (EMC Directive 2004/108/EC) and electromagnetic compatibility (EMC Directive 2004/108/EC) and
concerningconcerning
electrical equipment for use within specified voltage limits (Low-voltage directiveelectrical equipment for use within specified voltage limits (Low-voltage directive
2006/95/EC). This conformity is the result of 2006/95/EC). This conformity is the result of
tests conducted by ABB intests conducted by ABB in
accordance with the product standards EN 50263 and EN 60255-26 for the EMCaccordance with the product standards EN 50263 and EN 60255-26 for the EMC
directive, and with the product standards EN 60255-6 and EN 60255-27 for the lowdirective, and with the product standards EN 60255-6 and EN 60255-27 for the low
voltage directive. The IED is designed in accordance with the internationalvoltage directive. The IED is designed in accordance with the international
standards of the IEC 60255 series.standards of the IEC 60255 series.

Dangerous voltages can occur on the Dangerous voltages can occur on the
connectors, even though theconnectors, even though the
auxiliary voltage has been disconnected.auxiliary voltage has been disconnected.
Non-observance can result in death, pNon-observance can result in death, p
ersonal injury or substantialersonal injury or substantial
property damage.property damage.
Only a competent electrician is allowed to carry out the electricalOnly a competent electrician is allowed to carry out the electrical
installation.installation.
National and local electrical safety regulations must always bNational and local electrical safety regulations must always b
ee
followed.followed.
The frame of the IED has to be carefully earthed.The frame of the IED has to be carefully earthed.
When the plug-in unit has been detached from the case, do notWhen the plug-in unit has been detached from the case, do not
touch the inside of the case. The IED case internals may containtouch the inside of the case. The IED case internals may contain
high voltage potential and touching these may high voltage potential and touching these may
cause personal injury.cause personal injury.
The IED contains components which are sensitive to electrostaticThe IED contains components which are sensitive to electrostatic
discharge. Unnecessary touching of electronic components mustdischarge. Unnecessary touching of electronic components must
therefore be avoided.therefore be avoided.
Whenever changes are made in the IED, measures should be takenWhenever changes are made in the IED, measures should be taken
to avoid inadvertent tripping.to avoid inadvertent tripping.


This manual........................................................................................3This manual........................................................................................3
Intended audience..............................................................................3Intended audience..............................................................................3
Product documentatioProduct documentatio
n.........................................................n.........................................................
..............4..............4
Product documeProduct docume
ntation set...................................................ntation set...................................................
.........4.........4
Document revision history.............................................................5Document revision history.............................................................5
Related documentation..................................................................6Related documentation..................................................................6
Document symboDocument symbo
ls and conventions............................................ls and conventions............................................
......6......6
Safety indication symbols..............................................................6Safety indication symbols..............................................................6
Document conventions..................................................................6Document conventions..................................................................6
Connectivity paConnectivity pa
ckages......................................................................11ckages......................................................................11
PCM600 andPCM600 and
IED connectivity package version...............................12IED connectivity package version...............................12
CCT600 ...........................................................................................12CCT600 ...........................................................................................12
615 series imple615 series imple
mentation................................................................13mentation................................................................13
Information modInformation mod
el.............................................................................13el.............................................................................13
Vertical andVertical and
horizontal communhorizontal commun
ication....................................ication....................................
.........14.........14
PredefinePredefine
d vertical communicad vertical communica
tion data sets.................tion data sets.................
.............15.............15
Vertical cVertical c
ommunication diagnostic counters...............................16ommunication diagnostic counters...............................16
ParameteParamete
r setting and disturbance rer setting and disturbance re
corder..................corder..................
........................
......16......16
Horizontal coHorizontal co
mmunication................................................................17mmunication................................................................17
ConfiguriConfiguri
ng horizontal communication........................................17ng horizontal communication........................................17
GOOSE publishing properties..........................................................18GOOSE publishing properties..........................................................18
Configuring GOOSE ........................................................................19Configuring GOOSE ........................................................................19
Defining IEDs and exporting the SCD file....................................19Defining IEDs and exporting the SCD file....................................19
Creating an empty project...........................................................20Creating an empty project...........................................................20
Importing the SCD file.................................................................21Importing the SCD file.................................................................21
Configuring a GOOSE publisher.................................................23Configuring a GOOSE publisher.................................................23
Creating a GOOSE data set...................................................23Creating a GOOSE data set...................................................23
ConfigurinConfigurin
g a g a
GOOSE control block.......................................25GOOSE control block.......................................25
Configuring a GOOSE subscriber...............................................28Configuring a GOOSE subscriber...............................................28
Configuring GOOSE inputs....................................................28Configuring GOOSE inputs....................................................28
Finalizing GOOSE configuration..................................................30Finalizing GOOSE configuration..................................................30
Table of contentsTable of contents
11
Engineering GuideEngineering Guide

Exporting the SCL file.............................................................30Exporting the SCL file.............................................................30
Importing the SCL file.............................................................31Importing the SCL file.............................................................31
Connecting GOConnecting GO
OSE inputs to an IED applicaOSE inputs to an IED applica
tion........tion........
............
....33....33
Received GOOSE message handling..............................................34Received GOOSE message handling..............................................34
GOOSE supervision.........................................................................35GOOSE supervision.........................................................................35
BackgrounBackgroun
d sending......................................................d sending......................................................
..............35..............35
Default value handling.................................................................35Default value handling.................................................................35
Alarm supeAlarm supe
rvision in aprvision in ap
plication...................................plication...................................
...............36...............36
Diagnostic counters.....................................................................36Diagnostic counters.....................................................................36
Attaching the Attaching the
IEC 61850 cliIEC 61850 cli
ents to the busents to the bus
....................................................................
.....39.....39
Defining serveDefining serve
r IEDs.......................................................r IEDs.......................................................
..................41..................41
Defining the substatioDefining the substatio
n structure name..............................n structure name..............................
..............43..............43
Table of contentsTable of contents
22
Engineering GuideEngineering Guide

Engineering Guide provides information for IEC 61850 engineering of Engineering Guide provides information for IEC 61850 engineering of
the 615the 615
series protection IEDs with PCM600 series protection IEDs with PCM600
and CCT600. This quide concentratesand CCT600. This quide concentrates
especially on the configuration of GOOSE communication with these tools. Theespecially on the configuration of GOOSE communication with these tools. The
guide can be used as a technical reference during the engineering phase,guide can be used as a technical reference during the engineering phase,
installation and commissioning phase, and during normal service. installation and commissioning phase, and during normal service.
For more detailsFor more details
on tool usage, see the PCM600 documentation.on tool usage, see the PCM600 documentation.
This manual addresses the system engineers and installation This manual addresses the system engineers and installation
and commissioningand commissioning
personnel.personnel.
The system engineer must have a The system engineer must have a
thorough knowledge of protection systems,thorough knowledge of protection systems,
protection equipment, protection functions anprotection equipment, protection functions an
d the configured functional logic ind the configured functional logic in
the IEDs. The installation the IEDs. The installation
and commissioning personnel must have basicand commissioning personnel must have basic
knowledge of how to handle the electronic equipment.knowledge of how to handle the electronic equipment.
1MRS756475 D1MRS756475 D
Section 1Section 1
IntroductionIntroduction
33
Engineering GuideEngineering Guide

PP
ll
aa
nn
nn
ii
nn
gg
&&
pp
uu
rr
cc
hh
aa
ss
ee
EE
nn
gg
ii
nn
ee
ee
rr
ii
nn
gg
II
nn
ss
tt
aa
ll
ll
ii
nn
gg
CC
oo
mm
mm
ii
ss
ss
ii
oo
nn
ii
nn
gg
OO
pp
ee
rr
aa
tt
ii
oo
nn
MM
aa
ii
nn
tt
ee
nn
aa
nn
cc
ee
DD
ee
cc
oo
mm
mm
ii
ss
ss
ii
oo
nn
ii
nn
gg
dd
ee
ii
nn
ss
tt
aa
ll
ll
ii
nn
gg
&&
dd
ii
ss
pp
oo
ss
aa
ll
Application Application
manualmanual
Operation manualOperation manual
Installation manualInstallation manual
Service manualService manual
Engineering manualEngineering manual
Commissioning manualCommissioning manual
Communication protocolCommunication protocol
manualmanual
Technical manualTechnical manual
PP
ll
aa
nn
nn
ii
nn
gg
&&
pp
uu
rr
cc
hh
aa
ss
ee
EE
nn
gg
ii
nn
ee
ee
rr
ii
nn
gg
II
nn
ss
tt
aa
ll
ll
ii
nn
gg
CC
oo
mm
mm
ii
ss
ss
ii
oo
nn
ii
nn
gg
OO
pp
ee
rr
aa
tt
ii
oo
nn
MM
aa
ii
nn
tt
ee
nn
aa
nn
cc
ee
DD
ee
cc
oo
mm
mm
ii
ss
ss
ii
oo
nn
ii
nn
gg
dd
ee
ii
nn
ss
tt
aa
ll
ll
ii
nn
gg
&&
dd
ii
ss
pp
oo
ss
aa
ll
PP
ll
aa
nn
nn
ii
nn
gg
&&
pp
uu
rr
cc
hh
aa
ss
ee
EE
nn
gg
ii
nn
ee
ee
rr
ii
nn
gg
II
nn
ss
tt
aa
ll
ll
ii
nn
gg
CC
oo
mm
mm
ii
ss
ss
ii
oo
nn
ii
nn
gg
OO
pp
ee
rr
aa
tt
ii
oo
nn
MM
aa
ii
nn
tt
ee
nn
aa
nn
cc
ee
DD
ee
cc
oo
mm
mm
ii
ss
ss
ii
oo
nn
ii
nn
gg
dd
ee
ii
nn
ss
tt
aa
ll
ll
ii
nn
gg
&&
dd
ii
ss
pp
oo
ss
aa
ll
Application Application
manualmanual
Application Application
manualmanual
Operation manualOperation manualOperation manualOperation manual
Installation manualInstallation manualInstallation manualInstallation manual
Service manualService manualService manualService manual
Engineering manualEngineering manualEngineering manualEngineering manual
Commissioning manualCommissioning manualCommissioning manualCommissioning manual
Communication protocolCommunication protocol
manualmanual
Communication protocolCommunication protocol
manualmanual
Technical manualTechnical manualTechnical manualTechnical manual
en07000220.vsden07000220.vsd
IEC07000220 V1 ENIEC07000220 V1 EN
FiFi
gugu
re re
1:1:
ThTh
e ie i
ntnt
enen
dede
d ud u
se se
of of
mama
nunu
alal
s is i
n dn d
ifif
fefe
rere
nt nt
lili
fefe
cycy
clcl
eses
Engineering Manual contains instructions on how to Engineering Manual contains instructions on how to
engineer the IEDs. Theengineer the IEDs. The
manual provides instructions on how to use manual provides instructions on how to use
the different tools for IED the different tools for IED
engineering.engineering.
It also includes instructions on how to handle the tool component available to readIt also includes instructions on how to handle the tool component available to read
disturbance files from the IEDs on the basis of the IEC 61850 definitions. It furtherdisturbance files from the IEDs on the basis of the IEC 61850 definitions. It further
introduces the diagnostic tool components available for IEDs and the introduces the diagnostic tool components available for IEDs and the
PCM600 tool.PCM600 tool.
Installation Manual contains instructions on how to install the IED. The manualInstallation Manual contains instructions on how to install the IED. The manual
provides procedures for provides procedures for
mechanical and electrical installation. The chapters aremechanical and electrical installation. The chapters are
organized in chronological order in which the IED should be installed.organized in chronological order in which the IED should be installed.
Commissioning Manual contains instructions on how to commission the Commissioning Manual contains instructions on how to commission the
IED. TheIED. The
manual can also be used as a reference during periodic testing. The manualmanual can also be used as a reference during periodic testing. The manual
provides procedures for provides procedures for
energizing and checking of external circuitry, energizing and checking of external circuitry,
setting andsetting and
configuration as well as verifying settings configuration as well as verifying settings
and performing directional tests. Theand performing directional tests. The
Section 1Section 1
1MRS756475 D1MRS756475 D
IntroductionIntroduction
44
Engineering GuideEngineering Guide

chapters are organized in chronological order in which the IED should bechapters are organized in chronological order in which the IED should be
commissioned.commissioned.
Operation Manual contains instructions on how to operate the IED once it has beenOperation Manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for monitoring, controlling andcommissioned. The manual provides instructions for monitoring, controlling and
setting the IED. The manual also describes how to identify disturbances and how tosetting the IED. The manual also describes how to identify disturbances and how to
view calculated and measured network data to determine the cause of a fault.view calculated and measured network data to determine the cause of a fault.
Service Manual contains instructions on how to service and maintain the IED. TheService Manual contains instructions on how to service and maintain the IED. The
manual also provides procedures for de-energizing, de-commissioning and disposalmanual also provides procedures for de-energizing, de-commissioning and disposal
of the IED.of the IED.
Application Manual contains application descriptions and Application Manual contains application descriptions and
setting guidelines sortedsetting guidelines sorted
per function. The manual can be used per function. The manual can be used
to find out when and for what purpoto find out when and for what purpo
se ase a
typical protection function can be used. The manual can also be used whentypical protection function can be used. The manual can also be used when
calculating settings.calculating settings.
Technical Manual contains application and functionality descriptions and listsTechnical Manual contains application and functionality descriptions and lists
function blocks, logic diagrams, input and output function blocks, logic diagrams, input and output
signals, setting parameters andsignals, setting parameters and
technical data sorted per function. The manual can be used as a technical referencetechnical data sorted per function. The manual can be used as a technical reference
during the engineering phase, installation and during the engineering phase, installation and
commissioning phase, and duringcommissioning phase, and during
normal service.normal service.
Communication Protocol Manual describes a communication protocol Communication Protocol Manual describes a communication protocol
supportedsupported
by the IED. The manual concentrates on venby the IED. The manual concentrates on ven
dor-specific implementations.dor-specific implementations.
Point List Manual describes the outlook and properties of the data points specific toPoint List Manual describes the outlook and properties of the data points specific to
the IED. The manual should be used in conjunction with the correspondingthe IED. The manual should be used in conjunction with the corresponding
Communication Protocol Manual.Communication Protocol Manual.
Some of the manuals are not available yet.Some of the manuals are not available yet.
A/30.05.2008A/30.05.2008
1.11.1
First releaseFirst release
BB
//
00
22
..
00
77
..
22
00
00
88
11
..
11
CC
oo
nn
tt
ee
nn
t t
uu
pp
dd
aa
tt
ee
dd
CC
//
00
44
..
00
33
..
22
00
00
99
22
..
00
CC
oo
nn
tt
ee
nn
t t
uu
pp
dd
aa
tt
ee
d d
tt
o o
cc
oo
rr
rr
ee
ss
pp
oo
nn
d d
tt
o o
tt
hh
ee
product series versionproduct series version
DD
//
00
33
..
00
77
..
22
00
00
99
22
..
00
CC
oo
nn
tt
ee
nn
t t
uu
pp
dd
aa
tt
ee
dd
Download the latest documents from the ABB web siteDownload the latest documents from the ABB web site
http://http://
www.abb.com/substationautomationwww.abb.com/substationautomation
..
1MRS756475 D1MRS756475 D
Section 1Section 1
IntroductionIntroduction
55
Engineering GuideEngineering Guide

II
EE
C C
66
11
88
55
0 0
TT
ii
ss
ss
uu
ee
s s
CC
oo
nn
ff
oo
rr
mm
aa
nn
cc
e e
SS
tt
aa
tt
ee
mm
ee
nn
t t
((
TT
II
CC
SS
))
11
MM
RR
SS
77
55
66
44
66
44
IEIE
C 6C 6
1818
50 50
ProPro
toto
coco
l Il I
mpmp
lele
meme
ntnt
atat
ioio
n n
eXeX
trtr
a Ia I
nfnf
oror
mama
titi
on on
(PI(PI
XIXI
T)T)
1M1M
RSRS
7575
6464
6565
IEC 61850 Protocol Implementation Conformance StatementIEC 61850 Protocol Implementation Conformance Statement
(PICS)(PICS)
1MRS7564661MRS756466
IEC 61IEC 61
850 M850 M
odel Iodel I
mplemmplem
entatentat
ion Coion Co
nformnform
ance Sance S
tatemtatem
ent (Ment (M
ICS)ICS)
1MRS71MRS7
5646756467
Product series- and product-specific manuals can be Product series- and product-specific manuals can be
downloaded from the ABBdownloaded from the ABB
web siteweb site
http://www.abb.com/substationautomationhttp://www.abb.com/substationautomation
..
This publication includes icons that point This publication includes icons that point
out safety-related conditions or otherout safety-related conditions or other
important information.important information.
The caution icon indicates important information or warning relatedThe caution icon indicates important information or warning related
to the concept discussed in the text. It might indicate the presenceto the concept discussed in the text. It might indicate the presence
of a hazard which could result in corruption of software or damageof a hazard which could result in corruption of software or damage
to equipment or property.to equipment or property.
The information icon alerts the reader to important facts andThe information icon alerts the reader to important facts and
conditions.conditions.
The tip icon indicates advice on, for example, how to design yourThe tip icon indicates advice on, for example, how to design your
project or how to use a certain function.project or how to use a certain function.
Although warning hazards are related to Although warning hazards are related to
personal injury, it should be understoodpersonal injury, it should be understood
that operation of damaged equipment could, that operation of damaged equipment could,
under certain operational conditions,under certain operational conditions,
result in degraded process performance leading to result in degraded process performance leading to
personal injury or death.personal injury or death.
Therefore, comply fully with all warning and caution notices.Therefore, comply fully with all warning and caution notices.
••
AbbAbb
revrev
iatiiati
ons ons
and aand a
crocro
nymnym
s in ts in t
his his
manman
ual aual a
re sre s
pelpel
led oled o
ut in ut in
GloGlo
ssassa
ry.ry.
Glossary also contains definitions of important terms.Glossary also contains definitions of important terms.
••
HMI HMI
meme
nu pnu p
atat
hs ahs a
re pre p
rere
sese
ntnt
ed ied i
n bon bo
ldld
, fo, fo
r exr ex
amam
plpl
e:e:
Section 1Section 1
1MRS756475 D1MRS756475 D
IntroductionIntroduction
66
Engineering GuideEngineering Guide

SelectSelect
Main menu/InformationMain menu/Information
..
••
PaPa
rara
meme
tete
r nar na
meme
s ars ar
e she sh
owow
n in n in
itit
alal
icsics
, fo, fo
r exr ex
amam
plpl
e:e:
The function can be enabled and disabled with theThe function can be enabled and disabled with the
OperationOperation
setting.setting.
••
ParPar
ameame
ter ter
valval
ues ues
are are
indind
icaica
ted ted
with with
quoquo
tattat
ion ion
marmar
ks, ks,
for for
exaexa
mplmpl
e:e:
The corresponding parameter values are "On" and The corresponding parameter values are "On" and
"Off"."Off".
••
IED iIED i
npunpu
t/ot/o
utputp
ut meut me
ssss
ageage
s and ms and m
onioni
tortor
ed daed da
ta nata na
mes ames a
re shre sh
own iown i
n Con Co
uriuri
erer
font, for example:font, for example:
When the function starts, theWhen the function starts, the
STARTSTART
output is set to TRUE.output is set to TRUE.
1MRS756475 D1MRS756475 D
Section 1Section 1
IntroductionIntroduction
77
Engineering GuideEngineering Guide

88

The international IEC 61850 standard defines a The international IEC 61850 standard defines a
framework for substationframework for substation
communications networks and systems. The standard consists of several partscommunications networks and systems. The standard consists of several parts
ranging from the requirements on substation automation systems to ranging from the requirements on substation automation systems to
the details of athe details of a
communication protocol.communication protocol.
One major difference between the other communication protocols applied inOne major difference between the other communication protocols applied in
substation automation and IEC 61850 is that the latter is not only a communicationsubstation automation and IEC 61850 is that the latter is not only a communication
protocol, but a whole framework for sprotocol, but a whole framework for s
pecifying, engineering and operatingpecifying, engineering and operating
substation automation systems. The communication part covers the substation automation systems. The communication part covers the
connectionconnection
between the IEDs and the substation level, fasbetween the IEDs and the substation level, fas
t peer-to-peer communicationt peer-to-peer communication
between the IEDs and communication to sensbetween the IEDs and communication to sens
ors and actuatorsors and actuators
11
II
nn
tt
rr
oo
dd
uu
cc
tt
ii
oo
n n
aa
nn
d d
oo
vv
ee
rr
vv
ii
ee
ww
II
nn
ff
oo
rr
mm
aa
tt
ii
oo
n n
aa
nn
d d
uu
nn
dd
ee
rr
ss
tt
aa
nn
dd
ii
nn
gg
22
GG
ll
oo
ss
ss
aa
rr
yy
33
GG
ee
nn
ee
rr
aa
l l
rr
ee
qq
uu
ii
rr
ee
mm
ee
nn
tt
ss
44
SS
yy
ss
tt
ee
m m
aa
nn
d d
pp
rr
oo
jj
ee
cc
t t
mm
aa
nn
aa
gg
ee
mm
ee
nn
tt
II
mm
pp
aa
cc
t t
oo
n n
tt
ee
nn
dd
ee
rr
s s
aa
nn
d d
pp
rr
oo
jj
ee
cc
tt
managementmanagement
55
CC
oo
mm
mm
uu
nn
icic
aa
tt
ii
oo
n rn r
ee
qq
uu
irir
ee
mm
ee
nn
tt
s fs f
oo
r fr f
uu
nn
cc
tt
ii
oo
nn
s as a
nn
dd
device modelsdevice models
RequirementsRequirements
66
CC
oo
nn
ff
igig
uu
rr
aa
tt
ii
oo
n n
dd
ee
ss
crcr
ii
pp
tt
ii
oo
n n
ll
aa
nn
gg
uu
aa
gg
e e
ff
oo
rr
communication in electrical substations related tocommunication in electrical substations related to
IEDsIEDs
Impact on engineeringImpact on engineering
7-1…7-1…
7-47-4
Basic communication structure for substation andBasic communication structure for substation and
feeder equipment (data model and services)feeder equipment (data model and services)
Modelling and servicesModelling and services
88
MM
aa
pp
pp
ii
nn
gg
; ;
ss
tt
aa
cc
k k
AA
, ,
ss
tt
aa
cc
k k
BB
SS
tt
aa
tt
ii
oo
n n
bb
uu
s s
mm
aa
pp
pp
ii
nn
gg
ss
99
MM
aa
pp
pp
ii
nn
gg
; ;
ss
tt
aa
cc
k k
XX
, ,
ss
tt
aa
cc
k k
YY
PP
rr
oo
cc
ee
ss
s s
bb
uu
s s
mm
aa
pp
pp
ii
nn
gg
ss
11
00
CC
oo
nn
ff
oo
rr
mm
aa
nn
cc
e e
tt
ee
ss
tt
ii
nn
gg
II
mm
pp
aa
cc
t t
oo
n n
vv
ee
rr
ii
ff
ii
cc
aa
tt
ii
oo
nn
The IEC 61850 standard specifies an expandable data The IEC 61850 standard specifies an expandable data
model and services formodel and services for
substation automation (standard parts 7-x). The standard does not substation automation (standard parts 7-x). The standard does not
specify anyspecify any
protection or control functions, but sprotection or control functions, but s
pecifies how the functions expose pecifies how the functions expose
theirtheir
information to a communication network.information to a communication network.
The standard supports free allocation of functions tThe standard supports free allocation of functions t
o devices. With efficiento devices. With efficient
communication facilities, the functions can be located anywhere in the system, thatcommunication facilities, the functions can be located anywhere in the system, that
is, an interlocking function can reside in the IED or on the station level.is, an interlocking function can reside in the IED or on the station level.
Additionally, the standard is open Additionally, the standard is open
for different system philosophies, that is,for different system philosophies, that is,
different integration levels and allocation of functions to different devices isdifferent integration levels and allocation of functions to different devices is
supported.supported.
1MRS756475 D1MRS756475 D
Section 2Section 2
IEC 61850 overviewIEC 61850 overview
99
Engineering GuideEngineering Guide

The standard also defines a description lThe standard also defines a description l
anguage for substation automationanguage for substation automation
systems. The language facilitates efficient integration of devices into systems in ansystems. The language facilitates efficient integration of devices into systems in an
automated fashion. Additionally the standard supports a comprehensive andautomated fashion. Additionally the standard supports a comprehensive and
consistent system definition and engineering, which makes not consistent system definition and engineering, which makes not
only the devices,only the devices,
but also their tools and systems but also their tools and systems
interoperable (standard part 6).interoperable (standard part 6).
The standard uses Ethernet and TCP/IP The standard uses Ethernet and TCP/IP
for communication. Since Ethernet and TCP/for communication. Since Ethernet and TCP/
IP are widely accepted and used, the application of these technologies provide aIP are widely accepted and used, the application of these technologies provide a
broad range of features from broad range of features from
mainstream communication (standard parts mainstream communication (standard parts
8-1, 9-2).8-1, 9-2).
Therefore, IEC 61850 is also open for Therefore, IEC 61850 is also open for
possible new communication concepts in thepossible new communication concepts in the
future.future.
Data model (objects, sevices)Data model (objects, sevices)
Client serverClient server
communicationcommunication
GOOSEGOOSE
SampledSampled
valuesvalues
MappingMapping
Real-timeReal-time
communicationcommunication
MMSMMS
TCPTCP
IPIP
Ethernet link layerEthernet link layer
Ethernet physical layer with priority tagging (100 Mbit/s)Ethernet physical layer with priority tagging (100 Mbit/s)
11
22
33
GUID-A9FD9579-37AD-4B03-9GUID-A9FD9579-37AD-4B03-9
35E-BF39D48B7211 V1 35E-BF39D48B7211 V1
ENEN
FiFi
gugu
re re
2:2:
CoCo
mmmm
unun
icic
atat
ioio
n n
stst
acac
ks ks
anan
d d
mama
pppp
inin
g g
usus
ed ed
in in
IEIE
C 6C 6
1818
5050
11
AbstraAbstra
ct cct c
ommuommu
nicationicatio
n sn s
ervices ervices
interfinterf
ace ace
(ACSI)(ACSI)
22
StSt
acac
k k
inin
tete
rfrf
acac
ee
33
II
SOSO
/O/O
SI SI
stst
acac
kk
Section 2Section 2
1MRS756475 D1MRS756475 D
IEC 61850 overviewIEC 61850 overview
1010
Engineering GuideEngineering Guide

Protection and Control IED Manager PCM600 offers all the necessary functionalityProtection and Control IED Manager PCM600 offers all the necessary functionality
to work throughout all stages of the IED life cycle.to work throughout all stages of the IED life cycle.
••
PP
ll
aa
nn
nn
ii
nn
gg
••
EE
nn
gg
ii
nn
ee
ee
rr
ii
nn
gg
••
CC
oo
mm
mm
ii
ss
ss
ii
oo
nn
ii
nn
gg
••
OpOp
erer
atat
ioio
n ann an
d did di
stst
urur
baba
ncnc
e hae ha
ndnd
lili
ngng
••
FF
uu
nn
cc
tt
ii
oo
nn
aa
l al a
nn
aa
ll
yy
ss
ii
ss
With the individual tool With the individual tool
components, you can perform different tasks and functionscomponents, you can perform different tasks and functions
and control the whole substation. PCM600 can operate with many differentand control the whole substation. PCM600 can operate with many different
topologies depending on customer needs.topologies depending on customer needs.
For more information, see PCM600 documentation.For more information, see PCM600 documentation.
Connectivity package is a collection of software and information related to aConnectivity package is a collection of software and information related to a
specific protection and control terminal specific protection and control terminal
providing system products and tools toproviding system products and tools to
connect and interact with the IED.connect and interact with the IED.
Connectivity Package Manager is a tool that helps the user to define the rightConnectivity Package Manager is a tool that helps the user to define the right
connectivity package versions for different system products and tools. connectivity package versions for different system products and tools.
ConnectivityConnectivity
Package Manager is included in Package Manager is included in
products supporting the connectivity concept.products supporting the connectivity concept.
Use the connectivity packages to create configuration structure in PCM600. InUse the connectivity packages to create configuration structure in PCM600. In
addition to other products supporting connectivity concept, the addition to other products supporting connectivity concept, the
connectivityconnectivity
packages for PCM600 contain:packages for PCM600 contain:
••
DesDes
cricri
ptipti
on of Ion of I
ED's ED's
intint
ernern
al paal pa
ramram
etereter
s and ts and t
heihei
r pror pro
perper
tietie
s sucs suc
h as dh as d
ataata
format, unit, setting range, visibility and format, unit, setting range, visibility and
access rights. The description textsaccess rights. The description texts
can be translated into other languages as well.can be translated into other languages as well.
••
SofSof
twartwar
e come com
ponpon
entent
s thas tha
t adat ada
pt thpt th
e IEDe IED
-sp-sp
ecieci
fic ific i
ntente
rfarfa
ces tces t
o the so the s
tantan
dardar
dd
interfaces of system products and tools such as interfaces of system products and tools such as
IED-specific dispatchers forIED-specific dispatchers for
tools. This means that there is a protocol-specific adaptation for the parametertools. This means that there is a protocol-specific adaptation for the parameter
setting and disturbance handling tool components, for example setting and disturbance handling tool components, for example
disturbancedisturbance
uploading according to COMTRADE.uploading according to COMTRADE.
1MRS756475 D1MRS756475 D
Section 3Section 3
PCM600 toolPCM600 tool
1111
Engineering GuideEngineering Guide

••
ProPro
tectec
tiotio
n ann an
d Cod Co
ntrntr
ol Iol I
ED MED M
anaana
ger ger
PCMPCM
600 600
VerVer
. 2.. 2.
0 SP0 SP
2 or 2 or
latlat
erer
••
RERE
D6D6
15 15
CoCo
nnnn
ecec
tivtiv
ity ity
PacPac
kaka
ge Vge V
erer
. 2. 2
.5 .5
or lor l
atat
erer
••
RERE
F6F6
15 15
CoCo
nnnn
ecec
titi
vivi
ty ty
PacPac
kaka
ge Vge V
erer
. 2. 2
.5 o.5 o
r lar la
tete
rr
••
RERE
M6M6
15 15
CoCo
nnnn
ecec
tivtiv
ity ity
PacPac
kaka
ge Vge V
erer
. 2. 2
.5 .5
or lor l
atat
erer
••
RERE
T6T6
15 C15 C
onon
nene
ctct
iviv
ity ity
PaPa
ckck
agag
e Vee Ve
r. r.
2.2.
5 o5 o
r lar la
tete
rr
Download connectivity packages from the ABB web siteDownload connectivity packages from the ABB web site
http://http://
www.abb.com/substationautomationwww.abb.com/substationautomation
IEC 61850 also affects the engineering of IEC 61850 also affects the engineering of
the devices. PCM600 Engineering Pro,the devices. PCM600 Engineering Pro,
including the communication configuration tool CCT600, is needed including the communication configuration tool CCT600, is needed
to engineer anto engineer an
IEC 61850 system with the 615 IEC 61850 system with the 615
series IEDs.series IEDs.
CCT600 acts as a system tool which is used to define and share the system-wideCCT600 acts as a system tool which is used to define and share the system-wide
parameters, such as communication adparameters, such as communication ad
dresses, horizontal communication ddresses, horizontal communication d
ata andata and
its priorities and client/server (system level/IED) its priorities and client/server (system level/IED)
connections. The actualconnections. The actual
configuration of the IED and configuration of the IED and
the downloading of configuration changes are donethe downloading of configuration changes are done
with PCM600.with PCM600.
Section 3Section 3
1MRS756475 D1MRS756475 D
PCM600 toolPCM600 tool
1212
Engineering GuideEngineering Guide
Other manuals for Relion 615 series
41
This manual suits for next models
1
Table of contents
Other ABB Industrial Equipment manuals
Popular Industrial Equipment manuals by other brands

John Crane
John Crane 5625 Installation, operation & maintenance instructions

Retsch
Retsch AS200 manual

Dover
Dover Civacon LM1051 ADJUSTMENT PROCEDURE

Orbitalum
Orbitalum GF 4 Translation of Original Operating Instructions and Spare Parts List

TREVIL
TREVIL 5040 EASYFORM Usage and maintenance

RSP
RSP STC20 Installation and Maintenance