
7.3.9.2 Checking the residual (earth fault) current operate value
IN>
set below
IP>
........ 55
7.3.9.3 Checking the re-trip and back-up times........................................................................ 55
7.3.9.4 Verifying the re-trip mode................................................................................................ 55
7.3.9.5 Verifying the back-up trip mode......................................................................................56
7.3.9.6 Verifying the case
RetripMode
=
Contact
......................................................................56
7.3.9.7 Verifying the function mode
Current&Contact
.............................................................57
7.3.9.8 Completing the test........................................................................................................... 57
7.3.10 Breaker failure protection, phase segregated activation and output CSPRBRF.........57
7.3.10.1 Checking the phase current operate value, IP>............................................................58
7.3.10.2 Checking the residual (EF) current operate value
IN>
set below IP>....................... 58
7.3.10.3 Checking the re-trip and back-up times........................................................................ 58
7.3.10.4 Verifying the
RetripMode
..................................................................................................59
7.3.10.5 Verifying the case
RetripMode
=
No CB Pos Check
..................................................... 59
7.3.10.6 Verifying the function mode
Current&Contact
............................................................ 59
7.3.10.7 Checking the case with fault current below set value
I>BlkCont
............................. 60
7.3.10.8 Checking the phase current operate value,
IP>
............................................................60
7.3.10.9 Completing the test...........................................................................................................60
7.3.11 Stub protection STBPTOC...................................................................................................... 61
7.3.11.1 Measuring the operate limit of set values..................................................................... 61
7.3.11.2 Completing the test........................................................................................................... 61
7.3.12 Pole discordance protection CCRPLD.................................................................................. 61
7.3.12.1 Verifying the settings........................................................................................................ 62
7.3.12.2 Completing the test........................................................................................................... 62
7.3.13 Broken conductor check BRCPTOC ..................................................................................... 62
7.3.13.1 Measuring the operate and time limit of set values....................................................62
7.3.13.2 Completing the test........................................................................................................... 63
7.3.14 Directional underpower protection GUPPDUP ..................................................................63
7.3.14.1 Verifying the settings........................................................................................................ 63
7.3.14.2 Completing the test...........................................................................................................64
7.3.15 Directional overpower protection GOPPDOP ....................................................................64
7.3.15.1 Verifying the settings........................................................................................................ 65
7.3.15.2 Completing the test...........................................................................................................65
7.4 Testing voltage protection functions.................................................................................... 65
7.4.1 Two step undervoltage protection UV2PTUV ................................................................... 65
7.4.1.1 Verifying the setting.......................................................................................................... 65
7.4.1.2 Completing the test........................................................................................................... 67
7.4.2 Two step overvoltage protection OV2PTOV ......................................................................67
7.4.2.1 Verification of single-phase voltage and time delay to operate for Step 1............ 67
7.4.2.2 Completing the test...........................................................................................................68
7.4.3 Two step residual overvoltage protection ROV2PTOV ....................................................68
7.4.3.1 Verifying the settings........................................................................................................ 68
7.4.3.2 Completing the test...........................................................................................................69
7.4.4 Loss of voltage check LOVPTUV .......................................................................................... 69
7.4.4.1 Measuring the operate limit of set values.....................................................................69
7.4.4.2 Completing the test........................................................................................................... 70
7.5 Testing frequency protection functions................................................................................70
Table of contents
Breaker protection REQ650 3
Commissioning manual
© Copyright 2013 ABB. All rights reserved