manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Aerotech
  6. •
  7. Industrial Equipment
  8. •
  9. Aerotech RMS-PLUS HIGH-POWER Reloadable Motor System... Parts list manual

Aerotech RMS-PLUS HIGH-POWER Reloadable Motor System... Parts list manual

RMS-PLUS™ HIGH-POWER
Reloadable Motor System™
Rocket Motor Reload Kit With RMS-Plus Delay
Assembly & Operation Instructions
DO NOT OPEN RELOAD KIT UNTIL READY TO USE
WARNING-FLAMMABLE: READ INSTRUCTIONS BEFORE USE. Use RMS
reload kits only in accordance with instructions. Sale to persons under 18 years
of age prohibited by federal law.For use only by certified users 18 years of age
or older.Ignite by electrical means only.Do not smoke when loading RMS motors
or use in the vicinity of open flames. CAUTION: Keep out of reach of children.
Metalstorm™ propellants produce showers of hot sparks. Clear launch area of all
combustible material for at least a 75 foot diameter radius around launcher.
Follow NAR & TRA safety codes at all times. Motor hot after firing.
Setting the Time Delay
Note: If you want to use the longest (as-supplied) time
delay,do not use the RMS delay drilling tool and instead
proceed with general motor assembly (inside pages).
1. WARNING: Do not smoke and ensure that there are
no open flames or heat sources nearby when setting the
time delay. Assemble the AeroTech RMS delay drilling
tool with the desired amount of delay time removal (i.e.,
the - 4 or - 8 seconds removal marked on the tool label)
facing the exposed drill bit and delay grain.
2. Optional: Place the washer between the drill knob
and the tool if you want to remove 2 seconds less than
the value printed on the tool (i.e., - 2 or - 6 seconds
removal).
3. Place the delay grain into the cavity in the appropriate
end of the tool,hold the tool and grain firmly together and
turn the drill knob several times clockwise until the drill
knob sits flush against the drill tool body.
4. Remove the tool and shake out the shavings from the
tool and delay grain. Dispose of the shavings by burning
with a safe method and in a safe location.
Before You Begin
•Do not modify the motor in any way, except as
described herein.
•If any parts are missing or damaged, call AeroTech at
435-865-7100.
• Use only AeroTech RMS reload kits to refurbish an
RMS motor.
•Do not interchange parts from different reload kits.
•Do not reuse any parts of the RMS reload kit.
• Save the reload kit plastic bag for the used reload kit
parts. Dispose of bag and parts properly.
Package Contents
RMS-Plus reload kit components
Complete reload delay kit
Igniter & ejection charge kit
Hardware and Supplies Required
RMS 38mm aft closure
RMS 38mm case (see RMS-Plus packaging tube label
for size)
RMS 38mm standard forward closure OR 38mm reload
adapter system (if needed; refer to RAS instructions)
RMS delay drilling tool (RDDT)
Synco™ Super Lube™ or other grease
Hobby knife or scissors
Wet wipes or damp paper towels
Preparation for Flight
1. Remove the supplied FirstFire™ igniter from the
cardboard tube and straighten the leads.
2. Strip 1/2"-1" of insulation from the end of the leads.
3. Insert the black-coated end of the igniter through the
nozzle opening and push it completely into the motor
core, until the coated end is touching the time delay
element in the modular bulkhead.
4. Using a hobby knife or scissors, cut a corner off the
supplied nozzle cap to produce a vent hole in the cap
about 1/16"-1/8" wide.
5. Press the open end of the nozzle cap over the
exposed nozzle extension to hold the igniter firmly in
place.
6. Install the motor into the rocket's motor mount tube.
Ensure that the motor is securely retained in the rocket
by using positive mechanical means to prevent it from
being ejected during recovery system deployment.
7. Prepare the rocket's recovery system and then
launch the rocket in accordance with the National
Association of Rocketry (NAR) and/or Tripoli Rocketry
Association (TRA) Safety Codes.
Post-Recovery Cleanup
NOTE: Perform motor clean-up as soon as possible
after motor firing. Propellant and smoke charge residues
become difficult to remove after 24 hours and can lead
to corrosion of the metal parts. Place the spent motor
components in the reload kit plastic bag and dispose of
properly.
1. After the motor has cooled down, unthread and
remove the aft and forward closures.
Post-Recovery Cleanup (cont'd)
2. Remove the spent components from the casing by
pushing on the nozzle end and discard. Using wet wipes
or damp paper towels,wipe the inside of the casing and
all surfaces of the aft and forward closures to remove all
propellant residue.
3. Apply a light coat of grease to all threads and the
inside of the motor case. Reassemble metal parts and
store motor in a dry place.
First Aid
Do not ignite an AeroTech motor indoors. Do not breath
fumes from the rocket motor exhaust. For a minor burn,
apply a burn ointment. For a severe burn, immerse the
burned area in ice water at once and see a physician as
quickly as possible. In the unlikely event of oral ingestion
of the propellant, induce vomiting and see a physician
as quickly as possible. The composite propellant used in
AeroTech reload kits consists primarily of Ammonium
Perchlorate and a rubber-like plastic elastomer.
Redline™ propellant also contains Strontium Nitrate,
and Mojave Green™ propellant contains Barium Nitrate.
Disposal
Pack assembled motor firmly in a hole in the ground so
that only the nozzle is exposed, away from people,
animals, buildings and flammable materials. Ignite motor
electrically from a distance of 30 feet or more.
Propellant, delay and ejection charge (if installed) will
burn until consumed. Wait until the motor has cooled off
before disassembly and cleanup.
Fire Safety
Tests show that the pyrotechnic components of RMS™
reload kits will not explode in fires and normally will not
ignite unless subjected to direct flame and then will burn
slowly. Use water to fight any fires in which AeroTech
RMS™ reload kit pyrotechnic components may become
involved: Direct the water at the AeroTech RMS™ reload
kit pyrotechnic components to keep them below their
550 deg.F autoignition temperature. Foam and carbon
dioxide fire extinguishers will NOT extinguish burning
propellants of the type used in RMS™ reload kit
pyrotechnic components. Keep reload kit pyrotechnic
components away from flames, sources of heat and
flammable materials.
Disclaimer and Warranty
NOTICE: As we cannot control the storage and use of
our products, once sold we cannot assume any
responsibility for product storage, transportation or
usage. RCS shall not be held responsible for any
personal injury or property damage resulting from the
handling, storage or use of our product. The buyer
assumes all risks and liabilities therefrom and accepts
and uses AeroTech/RCS products on these conditions.
No warranty either expressed or implied is made
regarding AeroTech/RCS products, except for
replacement or repair, at RCS's option,of those
products which are proven to be defective in
manufacture within one year from the date of original
purchase. For repair or replacement under this
warranty, please contact RCS. Proof of purchase will be
required. Note: Your state may provide additional rights
not covered by this warranty.
AeroTech Division
RCS Rocket Motor Components, Inc.
Cedar City,UT 84721
www.aerotech-rocketry.com
Certified by the Tripoli Rocketry Association
Instructions P/N 21054Rev. 5/12/16
Made in U.S.A.
©2015-2016 RCS Rocket Motor Components, Inc., All rights
reserved
Note: Motor designation and complete performance specifications (including
sample time-thrust curve) are printed on the RMS-Plus packaging tube.
For RMS-38/120-360 Motor Hardware
General Motor Assembly Instructions (numbers refer to item numbers on drawing):
1. Lightly grease o-rings (4, 10 &17) and case & closure threads (2, 7 &14)
2. Insert propellant grains (8) into liner (6), then push liner assembly into case (7) until recessed equally from endsof case.
3. Install forward insulator (9) and forward o-ring (10) into one end of case.
4. Trim time delay grain (12) if desired, using AeroTech RMS delay drilling tool (RDDT). NOTE: Drilled end of delay grain faces propellant.
5. Assemble time delay components into the forward closure (14) as shown and per the enclosed Complete Reload Delay Kit (CRDK) instructions.
6. Thread the assembled forward closure (14) into the end of the case (7) with the forward insulator (9) and forward o-ring (10) until seated.
7. Install aft insulator (5), aft o-ring (4), nozzle (3) and aft closure (2) into open end of case (7) until seated.
8. Dispense ejection charge (15) into forward closure (14) and seal end with ejection charge cap (16).
Aft O-ring (4)
1-3/8" x 3/16" 318
Forward O-ring (10)
1-3/8" x 1/8" 216
Forward & Aft Insulators (5 & 9)
Forward Delay
Spacer (18)
Delay O-ring (17)
21mm x 3mm
AeroTech P/N 00001
FORWARD END
AFT END
16
3
2
4
6
78
12
10
14
15
9
13
17
5
1
11
18
ITEM DESCRIPTION QTY ITEM DESCRIPTION QTY
1NOZZLE CAP 1 10 FORWARD O-RING 1
2 AFT CLOSURE 1 11 AFT DELAY SPACER 1 OR NONE
3NOZZLE 1 12 DELAY GRAIN 1
4 AFT O-RING 1 13 DELAY INSULATOR 1
5 AFT INSULATOR 1 14 FORWARD CLOSURE 1
6 LINER 1 15 EJECTION CHARGE AR
7 CASE 1 16 EJECTION CHARGE CAP 1
8 PROPELLANT GRAINS 1, 2 OR 3 17 DELAY O-RING 1
9 FORWARD INSULATOR 1 18 FORWARD DELAY SPACER 1
NOTE: THE DRAWING SHOWN BELOW IS A GENERIC
REPRESENTATION OF THE ACTUAL MOTOR. NOZZLE SIZE,
NUMBER AND SIZE OF PROPELLANT GRAINS AND LENGTH OF
DELAY GRAIN MAY BE DIFFERENT.
RMS-Plus™ 38/120-360 Assembly Drawing and Notes
Paper liner,no forward seal disk

This manual suits for next models

1

Other Aerotech Industrial Equipment manuals

Aerotech HIGH-POWER RMS M750W-P Parts list manual

Aerotech

Aerotech HIGH-POWER RMS M750W-P Parts list manual

Aerotech ECO225SL Series User manual

Aerotech

Aerotech ECO225SL Series User manual

Aerotech ACS LP Series User manual

Aerotech

Aerotech ACS LP Series User manual

Aerotech Aerospike RMS-54/852-1706 Guide

Aerotech

Aerotech Aerospike RMS-54/852-1706 Guide

Aerotech PlanarDL-100XY Series User manual

Aerotech

Aerotech PlanarDL-100XY Series User manual

Aerotech HexGen HEX150-140HL User manual

Aerotech

Aerotech HexGen HEX150-140HL User manual

Aerotech AGR Series User manual

Aerotech

Aerotech AGR Series User manual

Aerotech Automation1 iXI4 User manual

Aerotech

Aerotech Automation1 iXI4 User manual

Aerotech ABRX User manual

Aerotech

Aerotech ABRX User manual

Aerotech ATS3600 User manual

Aerotech

Aerotech ATS3600 User manual

Aerotech ABL8000 Series ABL80020 User manual

Aerotech

Aerotech ABL8000 Series ABL80020 User manual

Aerotech AMG-GR Series User manual

Aerotech

Aerotech AMG-GR Series User manual

Aerotech LaserTurn 1 Series User manual

Aerotech

Aerotech LaserTurn 1 Series User manual

Aerotech ECO115SL Series User manual

Aerotech

Aerotech ECO115SL Series User manual

Aerotech ALS1000 Series User manual

Aerotech

Aerotech ALS1000 Series User manual

Aerotech PRO225SV Series User manual

Aerotech

Aerotech PRO225SV Series User manual

Aerotech ANT130R Sieries User manual

Aerotech

Aerotech ANT130R Sieries User manual

Aerotech PlanarDLA Series User manual

Aerotech

Aerotech PlanarDLA Series User manual

Aerotech ACS User manual

Aerotech

Aerotech ACS User manual

Aerotech PRO115LM User manual

Aerotech

Aerotech PRO115LM User manual

Aerotech ECO165SL Series User manual

Aerotech

Aerotech ECO165SL Series User manual

Aerotech ABL2000 Series User manual

Aerotech

Aerotech ABL2000 Series User manual

Aerotech PRO560LM Series User manual

Aerotech

Aerotech PRO560LM Series User manual

Aerotech Epaq MR User manual

Aerotech

Aerotech Epaq MR User manual

Popular Industrial Equipment manuals by other brands

Knudson KR Series GENERAL OPERATING AND MAINTENANCE INSTRUCTIONS

Knudson

Knudson KR Series GENERAL OPERATING AND MAINTENANCE INSTRUCTIONS

Staubli MA417 Assembly instructions

Staubli

Staubli MA417 Assembly instructions

socomec COSYS PFC Series operating instructions

socomec

socomec COSYS PFC Series operating instructions

Schako WDAEX Series Technical documentation

Schako

Schako WDAEX Series Technical documentation

Eaton Crouse-Hinds EMPX Installation & maintenance information

Eaton

Eaton Crouse-Hinds EMPX Installation & maintenance information

Lissmac FAM 300 P operating manual

Lissmac

Lissmac FAM 300 P operating manual

Reliable Double Interlock Preaction System D Instructions for installation, operation care and maintenance

Reliable

Reliable Double Interlock Preaction System D Instructions for installation, operation care and maintenance

Graco PrecisionFlo LT instructions

Graco

Graco PrecisionFlo LT instructions

Tractel dynasafe Mecha 3.2 Installation, operating and maintenance manual

Tractel

Tractel dynasafe Mecha 3.2 Installation, operating and maintenance manual

JohnDow Industries JDI-DPES user manual

JohnDow Industries

JohnDow Industries JDI-DPES user manual

ABB HT564131 Operation manual

ABB

ABB HT564131 Operation manual

Monzana MZTG124 instructions

Monzana

Monzana MZTG124 instructions

jost JSK37 Repair instructions

jost

jost JSK37 Repair instructions

schmersal AZM201Z-ST-T-1P2PW-A-2965-1-DU manual

schmersal

schmersal AZM201Z-ST-T-1P2PW-A-2965-1-DU manual

Graco Reactor 2 E-30 Operation

Graco

Graco Reactor 2 E-30 Operation

TapFlo DT Series Instructions for installation, operation and maintenance

TapFlo

TapFlo DT Series Instructions for installation, operation and maintenance

Siemens 3VA9 72-0WA00 Series operating instructions

Siemens

Siemens 3VA9 72-0WA00 Series operating instructions

Magnum Industrial MI-93850 manual

Magnum Industrial

Magnum Industrial MI-93850 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.