
AirSpeed 2900 gNB 5G OD Installation Guide
© Copyright Airspan Networks Ltd., 2021 P/N DUG01085 Rev. A, Nov 2021
2.2.6 Environmental............................................................................................................... 21
3AirSpeed 2900 Installation............................................................................................... 22
3.1 Connecting the GPS Antenna........................................................................................... 22
3.1.1 Weather-proofing the GPS Antenna Connection........................................................22
3.2 Tilt bracket Assembly........................................................................................................22
3.3 Pole Mounting Assembly..................................................................................................23
3.4 Wall Mount Assembly.......................................................................................................26
3.5 Tilt Adjustment .................................................................................................................27
4Connect and Manage Cables ........................................................................................... 28
4.1 Grounding ......................................................................................................................... 28
4.2 LED Display........................................................................................................................29
4.3 Single Mode LC Cable Insertion .......................................................................................30
4.4 DC Cable Preparation .......................................................................................................30
Appendix A. Installation Checklist ............................................................................................ 34
Appendix B. Abbreviations ....................................................................................................... 35
FIGURES
Figure 1: AirSpeed 2900 with GPS attached ............................................................................................... 16
Figure 2: AirSpeed 2900 Top Ports (with integrated antenna) .................................................................. 19
Figure 3: AirSpeed 2900 Bottom Ports........................................................................................................ 20
Figure 4: Environmental and Standard Compliance ................................................................................... 21
Figure 5: Tilt bracket Assembly.................................................................................................................... 23
Figure 6: Position on Pole............................................................................................................................. 24
Figure 7: Mounting Bracket on Pole............................................................................................................ 24
Figure 8: Pole Mounting Assembly.............................................................................................................. 25
Figure 9: Mounted on Pole .......................................................................................................................... 25
Figure 10: AirSpeed on Wall......................................................................................................................... 26
Figure 11: Tilt Adjustment............................................................................................................................ 27
Figure 12: Ground Connection..................................................................................................................... 28
Figure 13: Pre-assembled Single Mode LC Cable........................................................................................ 30
Figure 14: Stripping Dimensions (DC Cable)................................................................................................ 31
Figure 15: Open Housing Lock ..................................................................................................................... 31
Figure 16: Separate into Sections................................................................................................................ 31
Figure 17: Insert Gland Nut.......................................................................................................................... 31
Figure 18: Pass DC Cable Thru ..................................................................................................................... 31
Figure 19: Power Wire Connection.............................................................................................................. 32
Figure 20: Tightening of Set Screws ............................................................................................................ 32
Figure 21: Tighten the Strap Clamp............................................................................................................. 32
Figure 22: Align Marks + Click in Place ........................................................................................................ 32
Figure 23: Place Split Rubber Gland ............................................................................................................ 33
Figure 24: Place Tightening Cone on Split Gland........................................................................................ 33
Figure 25: Tighten gland Nut ....................................................................................................................... 33
Figure 26: Secure Housing Lock................................................................................................................... 33