
5
ML-2550A/2551A
Setting Data .................................................153
Reading Data ................................................154
Setting the Control Method, SCHEDULE No., Branch Shutter, etc. .......161
Setting the Mirror of the Timesharing Unit ..........................162
Reading the Control Method, SCHEDULE No., Branch Shutter, etc. ......163
Reading the Timesharing Unit Status ..............................164
Starting a Laser Light Output ....................................164
Stopping a Laser Light Output ...................................165
Stopping an Error Signal Output..................................165
Resetting the Total Number of Outputs.............................165
Resetting the Appropriate Number of Outputs .......................166
Reading Error No. at Occurrence of Trouble ........................166
Chapter 6 Printing Set Values and Measured Values ..................169
1. Printing Set Values .................................................169
2. Printing Measured Values. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .171
3. Printing Set Values for Seam Welding ..................................172
Maintenance Part 173
Chapter 1 How to Perform Maintenance............................175
NOTE .............................................................175
1. Maintenance Parts and Standard Intervals of Inspection/Replacement.........175
2. Maintenance of the Cooler Unit Section.................................178
Cleaning the Solenoid Valve Strainer ..............................178
Draining Water from the Primary Cooling Water......................179
Draining Water from the Secondary Cooling Water Tank ...............181
Changing the Ion-Exchange Resin and Replacing the Ion-Exchanger.....182
Changing the Water Filter and Secondary Cooling Water ..............185
Water Drain When the Laser Welder Is Not Used Over One Month or
the Room Temperature at the Installation Place Goes Down Below 0ºC ...186
3. Maintenance of Laser Oscillator Section ................................189
Replacing the Flashlamp .......................................189
Making an Incident Beam Adjustment of the Optical Fiber ..............193
Cleaning the Optical Fiber ......................................193
Cleaning the Optical Parts ......................................194
4. Maintenance of the Power Supply Section...............................195
Replacing the Lithium Battery for Backup...........................195
Cleaning the Air Filter ..........................................196
Chapter 2 Inspection and Measure To Be Taken at Occurrence of an Error. 197
1. Error Display and How to Take a Measure...............................197
Operation for Closing Interlock ...................................202
2. Troubles not Displaying Fault Code ....................................202
Appendixes 203
Specications .......................................................205
Dimensional Outline Drawings ..........................................207
Available Output .....................................................208