Any revisions must first be approved by the product designer. Version: 201806 Revision By: JST
FLOOR PREPARATION –on any floor type
1. Sweep floor free of dust
2. Provide a hole for the waste fitting to a minimum size of 230mm x
230mm, FIGURE 1, in the correct position to suit the shower base.
3. Dry fit the shower base onto the flooring to ensure it is able to be
installed level. The top of the glazing channel(s) and top edges of
the upstands must be level. Re-check that the Waste Body
Assembly is correctly aligned with the centre of the base hole.
Ensure all base rings are supported by flooring.
NOTE: It is the responsibility of the installer to:
-Ensure the shower base has been installed level, and
-Ensure that the shower base drains sufficiently before the
shower base is adhered to the floor
4. Separate the components of the waste into:
A. the inner ring and waste cup
B. the waste body and body seal
5. Connect the waste body to the pipework, FIGURE 2, ensuring that
the body seal is in the correct position and 25mm below the floor
level, as in FIGURE 2 and 3
25mm lower than floor level
230mm x 230mm
hole in floor