manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. B+B Sensors
  6. •
  7. Security Sensor
  8. •
  9. B+B Sensors REGME User manual

B+B Sensors REGME User manual

OPERATION MANUAL
Technical changes reserved
0141 0316-212 20.07.2020
Rain Detector REGME
model 12 V AC/DC or 24 V AC/DC
DescriptionDescription
Technical Data
Measurement method Electrolytic AC measurements
Input current
12 V Model
24 V Model
60 mA, Heater 80 - 300 mA (PTC)
50 mA, Heater 40 - 180 mA (PTC)
CE-Conformance 2014/30/EU
EMV-noise emission EN 61000-6-3:2011
EMV-noise withstanding EN 61000-6-1:2007
Cable gland M16 x 1,5
Clamping area 6,0 - 9,5 mm
Operating voltage chooseable: 12 V AC/DC ± 10%
24 V AC/DC ± 10%
Output output (relay) 30 V / 4 A,
NO / NC selectable
Housing ABS, ingress protection IP54
Dimensions (w x h x d) 80 x 82 x 58 mm
Article Art.-No.
Rain Detector 12 V REGME-12V
Rain Detector 24 V REGME-24V
Combined wall/mast mounting
bracket
REGME-WAHA
Applications
• Nurseries, Agriculture
• Control of Ventilation panels
• Automatic switch for Blinds and Rolling windows
• Building instrumentation
• Weather stations
Functional description
The large sensor area reacts to rain or snow. The switch polarity and sen-
sitivity are adjustable. The optionally switched heater prevents freezing or
dew formation and accelerates drying. In the maximum sensitivity setting, the
device is also suitable for recognizing fog.
Application
The rain guard is tted with a relay contact for switching low voltages up
to 30 V DC/AC which can be used to operate any switching device e.g. a
marking control device. Sensitivity can be adjusted within a wide range. The
device is provided with a heater for faster drying and snow recognition.
Mounting
Installation of the rain sensor unit should be carried out by only authorised
personnel. The applicable safety regulations should be followed! The Rain
Sensor can be installed on a wall/mast mounting bracket. If such accessories
are not used, care should be taken that the mounting angle is approximately
30 ° from horizontal. Mounting of the Rain Sensor should be done at a place
which is freely accessible for rain. Dripping water can adversely delay swit-
ching back or can lead to a permanent ON/OFF of the contacts.
Connection
After removing the sensor cover, the control cable is to be inserted in the
cable gland M16.Supply voltage is to be connected to the terminals VCC and
GND. Terminals NC, COM, NO are the potential free changeover contacts for
switching.
Precautions:
• The device is suitable only for low voltages and should not be operated
on mains supply !
• The relay contact is only suitable for low value signals and should not
come in contact with mains supply !
• The protection type is valid only with an intact, complete casing, cover
Features
• Safe operation, electrolytic measurement principle
• Deposition can be detected as rain or snow
• Operating voltage 12 or 24 V DC/AC
• Large, heated sensor area for fast drying and operation in winter season
• Potential free contact output (Relay) 30 V/4 A
• Sensitivity and switching mode adjustable
• Universal wall/mast mounting bracket as accessories
B+B Thermo-Technik GmbH | Heinrich-Hertz-Straße 4 | D-78166 Donaueschingen
Fon +49 771 83160 | Fax +49 771 831650 | [email protected] | bb-sensors.com
1 / 2
OPERATION MANUAL
Technical changes reserved
0141 0316-212 20.07.2020
Rain Detector REGME
model 12 V AC/DC or 24 V AC/DC
screws and cable gland properly tightened, and the covergasket should
always be available on the sensor cover !
• The suitability for certain applications is to be checked by the user
Settings
Signal generator output (optional)
At the connection terminals (Pin BUZ and GND) a passive Piezo signal gene-
rator can be connected. The condition of signal (acustic signal for dry or wet)
can be selected with the plug links S1-S2 or S2-S3. In the default-position
S2-S3, the signal generator is inactive for rain.
Switching mode
The switching mode of the relay (pickup or dropout with rain) can be
selected with the plug links T1-T2 or T2-T3. In the factory settings, link T1-T2
is connected and the relay closes if the sensor surface gets wet.
Heating
The sensor surface is heated, if the link of HZ1-HZ2 is connected. To
ensure faster drying and for operation below freezing point, the heater should
be switched on. For sensing fog, the heater can be switched off.
Automatic heating
The heating is only switched on when the sensor surface is wet.
Sensitivity setting
The sensitivity for detecting rain can be adjusted with the potentiometer
„SENS“. Rotating the potentiometer clockwise results a higher sensitivity.
For detecting rain mostly the middle position of the potentiometer is suitable.
Please note that no function takes place in the end position!
Relay time delay
As soon as rain is detected and the relay has been switched (on or off,
depending on the jumper setting), it is switched back to the starting positi-
on with a time delay. The time during which the relay is switched on or off
(depending on the jumper setting) can be set from approx. 90 to 330 seconds
using the „TIME“ potentiometer. If rain is detected again while the time delay
is active, it starts again.
Indicators
There is a green LED on the device to indicate the operation status and a red
LED to indicate the switch position (meansrelay contact closed).
Maintenance
The Rain Sensor unit is almost maintenance free. The sensor surface
must be occasionally cleaned with a moist cloth ( e.g. once annually,
depending on the place of installation). In case of persistent condition, even if
it does not rain, it triggers due to strong contamination.
Connection Layout
REL NC Opening switch contact
REL NO Closing switch contact
REL CO Common switch contact
AC/DC Operating voltage AC or 24 V DC +10%
AC/GND Operating voltage AC or 0 V
Plug Links Conguration
1 Switch mode signal generator (dry)
2 Common contact to S3 and S1
3 Switch mode signal generator (wet)
4 Signal generator ground
5 Signal generator output
6 Switch mode relay (dry)
7 Common contact to T3 and T1
8 Switch mode relay (wet)
9 Heating
10 Heating
11-16 not occupied
Dimensions
Accessoires
wall / mast mounting bracket
including mouting hardware
Attention
Please avoid extreme mechanical and inappropriate exposure.
The device/product is not suitable for potential explosive areas and medical-
technical applications.
Potentio-
meter:
SENS
TIME
B+B Thermo-Technik GmbH | Heinrich-Hertz-Straße 4 | D-78166 Donaueschingen
Fon +49 771 83160 | Fax +49 771 831650 | [email protected] | bb-sensors.com
2 / 2

This manual suits for next models

1

Other B+B Sensors Security Sensor manuals

B+B Sensors PIR-STD User manual

B+B Sensors

B+B Sensors PIR-STD User manual

B+B Sensors REGME 12 V AC/DC User manual

B+B Sensors

B+B Sensors REGME 12 V AC/DC User manual

Popular Security Sensor manuals by other brands

PCB Piezotronics IMI Sensors RV640B11 Installation and operating manual

PCB Piezotronics

PCB Piezotronics IMI Sensors RV640B11 Installation and operating manual

Lince BOBBY GOLD Series Installation, operation and maintenance manual

Lince

Lince BOBBY GOLD Series Installation, operation and maintenance manual

Waytronic MicroSound M13 quick start guide

Waytronic

Waytronic MicroSound M13 quick start guide

Visonic TOWER-32AMPG2 installation instructions

Visonic

Visonic TOWER-32AMPG2 installation instructions

HELVAR Digidim 313 installation guide

HELVAR

HELVAR Digidim 313 installation guide

Niko 351-26450 manual

Niko

Niko 351-26450 manual

Askari Scout Operator's manual

Askari

Askari Scout Operator's manual

IMR EX660 Operation manual

IMR

IMR EX660 Operation manual

ADT Ademco 5898 quick start guide

ADT

ADT Ademco 5898 quick start guide

SICK PowerProx Micro WTT2SL Series quick start

SICK

SICK PowerProx Micro WTT2SL Series quick start

SMS GC 055 H quick start guide

SMS

SMS GC 055 H quick start guide

Chromagic Technologies Z-Wave HSM02 manual

Chromagic Technologies

Chromagic Technologies Z-Wave HSM02 manual

Scott GEMINI RFF40 Operating and maintenance instructions

Scott

Scott GEMINI RFF40 Operating and maintenance instructions

Visonic TOWER 20 AM - INSTALLER GUIDE installation instructions

Visonic

Visonic TOWER 20 AM - INSTALLER GUIDE installation instructions

LZR FLATSCAN 3D SW user guide

LZR

LZR FLATSCAN 3D SW user guide

Tollco WaterFuse PlugIn VFB700-DN15 User's manual & installation instructions

Tollco

Tollco WaterFuse PlugIn VFB700-DN15 User's manual & installation instructions

ABB Stanlite Nexus RF installation manual

ABB

ABB Stanlite Nexus RF installation manual

Guardian Fall Protection 01512 instruction manual

Guardian Fall Protection

Guardian Fall Protection 01512 instruction manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.