Carmanah SPEEDCHECK-12 User manual

SpeedCheck®
APPLIED INFORMATION (AI) INTEGRATION INSTALL GUIDE
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupp[email protected] | carmanah.com
For the SPEEDCHECK-12
90063_INSTALL-GUIDE_SPEEDCHECK-12-AI-Integration-Kit_RevB
SPEEDCHECK-12
(Battery/Solar)
SPEEDCHECK-12
(AC)

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 3
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
Table of Contents
Table of Contents .....................................................................................................................................................3
1.0 Warnings and Precautions ................................................................................................................................4
1.1 Warranty Disclaimer ...................................................................................................................................4
1.2 Standards ...................................................................................................................................................4
1.3 Safety and Usage Precautions...................................................................................................................4
1.4 Applications ................................................................................................................................................5
2.0 System Components..........................................................................................................................................6
3.0 Tools and Materials Required ...........................................................................................................................6
4.0 Installation...........................................................................................................................................................7
4.1 Opening Rear Enclosure ............................................................................................................................7
4.2 AI 500-070 Field Control Unit (FCU) ..........................................................................................................8
4.3 Solar Version Only................................................................................................................................... 11
4.4 Testing AI FCU ........................................................................................................................................ 12

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 4
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
1.0 Warnings and Precautions
The following symbols indicate important safety warnings and precautions throughout this guide:
WARNING indicates that serious bodily harm or death may result from failure to adhere to the
precautions.
CAUTION indicates that damage to equipment may result if the instructions are not followed.
NOTE suggests optimal conditions and provides additional information.
1.1 Warranty Disclaimer
This manual will familiarize you with the features, operation standards and installation of Carmanah’s
SPEEDCHECK-12 Applied Information (AI) Integration Kit. Failure to comply with the use, storage, maintenance,
installation or placement instructions detailed in this manual could void the warranty.
1.2 Standards
Perform all installation, wiring, grounding and maintenance in conformance with local building and electrical
codes. Adherence to the National Electrical Code (NEC) is mandatory to comply with any certification markings.
Non-adherence to code may void the warranty.
1.3 Safety and Usage Precautions
Batteries are shipped fully charged. Use extreme caution when handling the batteries as they can
generate hazardous short-circuit currents. Remove all jewelry (bracelets, metal-strap watches,
etc.) before handling the batteries.
Solar panels produce DC electricity when exposed to light and can therefore produce an
electrical shock or burn. To render solar panels inoperative, remove them from sunlight or fully
cover their front surface with an opaque material.
Before lifting any heavy or bulky equipment, ensure the load is secured so moving parts do not
shift, and that it can be lifted as far as needed without back strain or loss of grip. Installation may
require more than one person.
Ensure the equipment is not powered during installation and wiring of the system.

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 5
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
Recheck all completed wiring for proper polarity prior to energizing the system.
Changes or modifications to Carmanah equipment not expressly approved by Carmanah could
void both the user's authority to operate the equipment and the warranty.
Product can have sharp edges. Accidental movement of hinged components can cause injury.
This guide is specific to the SPEEDCHECK-12 AI Integration Kit installation and is not a
replacement for the complete SPEEDCHECK-12 product user manual.
Visit support.carmanah.com to download the complete product user manual.
1.4 Applications
For Carmanah SPEEDCHECK-12 radar speed signs, the AI Integration Kit allows for remote system monitoring,
scheduling and control.
The SPEEDCHECK-12 AI Integration Kit is available in two different states of assembly described below:
•If ordered with a SPEEDCHECK-12 system: the display enclosure harnessing is assembled in the
factory, creating an “AI-ready” SPEEDCHECK-12 system. The AI Integration Kit comes as parts to be
installed by the user following all installation steps provided.
•If ordered separately: the SPEEDCHECK-12 display enclosure must be replaced prior to following these
installation steps. See the note below.
If installing into an existing system that was not ordered with the AI Integration Kit, you will require
a new display enclosure. Contact Carmanah for more information.

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 6
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
2.0 System Components
The SPEEDCHECK-12 Applied Information (AI) Integration Kit consists of the following items:
1. Mount plate, AI FCU (1)
2. Harness, AI FCU to bulkhead (1)
3. Harness, solar monitoring, 8’ (1)
4. Nut, nyloc, 1/4”-20 (4)
5. Cable tie, 4-way, mounting base (2)
6. Cable tie, 4” (4)
7. Cable tie, 7”, #8 screw mount (1)
8. Screw, #8-32 x 1/4”, pan head (3)
9. Screw, #8-32 x 3/8”, pan head (1)
10. Adapter, 90°, SMA male to SMA female (2)
3.0 Tools and Materials Required
The following tools and materials may be required to install the AI Integration Kit into your SPEEDCHECK-12
system:
1. Drill and 17/32” drill bit
2. Deburring tool or similar
3. Crescent wrench
4. Side cutters
5. Multi-bit screwdriver
6. Socket set
7. 18/19mm wrench or 3/4” fuel inject socket

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 7
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4.0 Installation
4.1 Opening Rear Enclosure
1. To open SPEEDCHECK-12, insert included key into lock and rotate clockwise.
2. Apply diagonal pressure to the bottom right corner of the sign face then PULL on the key.
3. Once unlocked, the key can be removed.
4. Swing the display enclosure away from the rear enclosure.

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 8
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4.2 AI 500-070 Field Control Unit (FCU)
If a second battery is installed in the upper part of the rear enclosure it will need to be removed to
fit the AI Field Control Unit (FCU). Remove the upper battery, battery bracket and battery shelf
prior to installing the FCU mounting plate.
1. Disconnect power to the system by opening all battery fuse holders or switch off the breaker (to the right).
2. Install the AI FCU mounting plate into the rear enclosure and secure with three nyloc nuts in the locations
outlined below.
3. Drill a 17/32” hole in the top corner of the rear enclosure at the half shear location. Deburr both sides of
the hole and remove all metal chips.
4. Remove jam nut and washers from antenna. Install coax cables through previously drilled hole. Install
plastic washer, lock washer and nut as shown below. Ensure the antenna is flush with the rear enclosure
and tighten nut with a 19mm wrench.

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 9
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
5. Install two cable tie holders onto the mounting plate as shown below.
6. Route coax cables from antenna to cable tie mounts and loop cables around 2-1/4 turns clockwise.
Secure with four cables ties.
Coax cable connectors should end up approximately in the left of the rear enclosure.
7. Install 16-pin and 4-pin harnesses into the AI FCU.
8. Thread two 90° coax adapters onto antenna connectors. Orient as shown below.

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 10
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
9. Install AI FCU onto mounting plate with three #8-32x1/4” screws.
10. Install screw mount cable tie around harness wires end secure to lower-left mounting plate standoff with
one #8-32x3/8” screw.
11. Install harness ground ring terminal onto stud shown and fasten with one nyloc nut. Orient as shown.
12. Thread GPS and LTE antenna coax harness connectors onto correct connectors on the AI FCU (not
shown below).
Yellow sensor wire will remain unterminated for AC-powered systems. For solar-powered
systems this will mate with the yellow wire from the solar kit. See Section 4.3 for more
information.
13. Connect the 2-pin and 4-pin AI FCU connectors to the open receptacles on the display enclosure as
shown below. All 2-pin connectors are interchangeable.
Battery Only or AC w/ AI FCU Solar Kit w/ Battery & AI FCU
Cell –Front
GPS –Rear

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 11
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4.3 Solar Version Only
1. For solar kit versions, there is a length of yellow sensor wire to be routed with the battery harness from
the solar kit to the LED display.
2. Terminate this yellow sensor wire to the Solar positive (+) terminal of the charge controller. Route the
sensor wire down the pole and into the rear enclosure.
3. Once the sensor wire is inside the rear enclosure, connect it to the yellow wire shown below.
To charge
controller
Solar +
To AI FCU
harness solar
sensor wire

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 12
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4.4 Testing AI FCU
1. Ensure AI serial number has been activated.
2. Set toggle switch to “OFF”.
3. Ensure connectors are properly mated on the bottom of the AI FCU.
4. Confirm correct wiring and power-up system by connecting the DC power (battery fuses or switch on the
breaker) and turning on the AI power switch.
5. Open your PC, open a browser and navigate to the Glance website: glance.appinfoinc.com
6. Log in using the credentials provided by AI or the distributor you purchased the equipment from.
7. On the upper-left side of the browser, select the device name that matches the Device ID (the ID number
labelled on the AI FCU).
Ensure the equipment is not powering during installation. Recheck all wiring prior to energizing
the system.

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 13
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
8. Ensure that the “Current Status” indicates “Online”.
9. Ensure “Current Device Status” is “OK”.
10. Contact Applied Information to arrange the firmware in the AI unit to be programmed correctly, if this
hasn’t already been done.
a. Phone: 678.830.2170
b. Email: support@appinfoinc.com
c. Web: appinfoinc.com
11. To close, push the display enclosure against the rear enclosure and then apply diagonal pressure in the
bottom right corner of the sign face. Once fully closed then PUSH the lock to secure in place.

Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | customersupport@carmanah.com | carmanah.com 14
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
© 2021 Carmanah Technologies Corporation
Technical Support:
Toll Free: 1.877.722.8877 (US & Canada)
Worldwide: 1.250.380.0052
Fax: 1.250.380.0062
Web: carmanah.com
Other manuals for SPEEDCHECK-12
2
Table of contents
Other Carmanah Radar manuals

Carmanah
Carmanah SpeedCheck 12 User manual

Carmanah
Carmanah E Series User manual

Carmanah
Carmanah SpeedCheck-15 User manual

Carmanah
Carmanah SpeedCheck-15 User manual

Carmanah
Carmanah SPEEDCHECK Parts list manual

Carmanah
Carmanah SpeedCheck 12 User manual

Carmanah
Carmanah SpeedCheck-15 Parts list manual

Carmanah
Carmanah MX Series User manual

Carmanah
Carmanah SpeedCheck-15 User manual

Carmanah
Carmanah G Series Parts list manual