‘CLICK’
23 series (slab boxes) Installation, user and care guide
Part No: 134251 Issue No: 001
1 compartment slab box
3 compartment slab box
2 compartment slab box
4 compartment slab box
Clean the location for
the slab box ensuring
the area is free from
dust and debris.
Apply a suitable
adhesive xing method
to the base of the slab
box.
Position the box in the
desired location and
follow steps provided by
adhesive manufacturer.
Remove the required
knockouts and attach a
suitable conduit. Feed
wires into the box.
Swivel the retractable
xing brackets out on
the base of the slab box.
Position plates in desired
orientation and x in
place with 2x taptite
screws.
Mark and drill the xing
positions in the desired
location.
The box is ready to
connect to power.
Screw the slab box to
the oor substrate with
2x suitable screws at the
points shown.
Earthing the box and sockets
Installing accessory plates (if applicable)
Slab box xing methods
Adhesive xing (optional)
Screw xing with retractable xing brackets
Tap-off engagement/release
**WARNING**
An unterminated tap-off MUST NEVER be connected to a live track.
Provided that it is off load, a terminated tap-off may be removed/
inserted into a live track. Conduit must be bonded to Earth.
Align tap-off pins with
slots on socket. Push
down to engage.
Press down and push
backwards until button
clicks upwards to lock.
To remove, press button
to disengage. Push
forwards and lift up to
remove.
To reset after it has
tripped, press and hold
the grey reset button
until a click is heard.
The indicator will change
to show it is now active.
Remove your nger from
the reset button.
A qualied person
should test the SRCD
function periodically to
comply with standards.
A qualied or fully
competent person
should test the SRCD
before rst use.
When active, the SRCD
indicator window is
lled with a red marker.
When the SRCD trips,
the red marker in the
indicator window
recedes as shown.
Testing and resetting SRCD socket (if applicable)
‘CLICK’
Test
Reset
Indicator
up
Indicator
down
Active SRCD state Tripped SRCD state
Clean Earth (C/E) Low Noise
Standard Earth
The box base must be earthed with a suitable ring terminal to the integrated
earth stud. To ensure the sockets are earthed, a link will be required from
the box earth stud to the socket earth. On Clean Earth (C/E) Low Noise
installations these should be wired directly to the Clean Earth CPC (Circuit
Protective Conductor).