
Table of ConTenTs
Introduction.............................................3
General Information .....................................3
Unit Nameplate.........................................3
Hazard Identication Information ...........................3
Mechanical Installation ...................................4
Installer Responsibilities..................................4
Receiving Inspection ....................................4
Service Clearance ......................................4
Ventilation Clearance ....................................4
Overhead Clearance ....................................6
Roof Curb Assembly and Installation ........................6
Rigging and Handling ...................................10
Unit Piping - Condensate Drain Connection..................12
Damper Assemblies ....................................12
Cabinet Weather Protection ..............................13
Installing Ductwork .....................................13
Electrical Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Pre-Construction ......................................15
Refrigeration System ....................................19
Piping System ........................................19
DPS 003–015 Component Description .....................21
DPS 016–028 Ton Component Description ..................27
VFD Compressor Operation – DPS 016–028 ................29
Variable Speed Scroll Compressor.........................33
Optional Modulating Hot Gas Reheat....................... 36
Modulating Hot Gas Reheat .............................36
Optional Electric Heat ...................................39
Electric Heater Design ..................................39
Optional Gas Heat ......................................40
Daikin Tubular Heater Series .............................40
Gas Furnace Design ...................................40
Gas Heating Capacity Data ..............................41
DPS 003–015 Sequence of Operation ......................48
DPS 016–028 Sequence of Operation .....................49
Start-Up Procedures....................................50
Operating Procedures ..................................51
DPS 003–015 (only) Ignition Control Module for
Staged Gas Furnace ...................................52
DPS 003–015 (only) Ignition Control Module for
Modulating Gas Furnace ................................53
DPS 003–015 (only) Gas Furnace Ignition and Control
Troubleshooting .......................................54
VB-1200 Trouble Shooting Guide..........................54
DPS 016–028 Gas Furnace Ignition Troubleshooting ..........60
Optional Hot Water Heat .................................65
Hot Water Heater Design ................................65
Optional Energy Recovery Wheel..........................66
System Description ....................................66
Optional Outdoor Air Monitor .............................69
Thermal Dispersion Airow Measurement Technology..........69
ECM Motor.............................................74
Unit Options ...........................................76
Economizer Enthalpy Control.............................76
External Time Clock ....................................76
Exhaust Fan Option ....................................76
Proof-of-Airow and Dirty Filter Switch......................76
Duct High Pressure Limit ................................76
Convenience Receptacle (Field Powered) ...................77
Convenience Receptacle (Unit Powered) ...................77
Wiring Diagrams ........................................ 78
Sequence of Operation ..................................90
Operating States ......................................90
Mechanical Cooling ....................................91
Economizer ..........................................91
Preparing the Unit for Start Up ............................92
Pre-Start of Unit .......................................92
Spring Isolated Fans ...................................92
Servicing Control Panel Components ......................93
Power-Up ............................................93
Fan Start-Up..........................................93
Check, Test and Start Procedures ......................... 94
Economizer Start-Up ...................................94
Compressor Start-Up ...................................94
Set Up for Optimum Control ..............................95
Air Balancing .......................................95
Energy Recovery Wheel.................................96
Final Control Settings ...................................97
Final Control Settings ...................................97
Maintaining Control Parameter Records ....................97
Maintenance ...........................................98
Performing Service Maintenance ..........................98
Planned Maintenance...................................98
Unit Storage ..........................................98
Periodic Service and Maintenance.........................99
Refrigerant Charge....................................100
Servicing Refrigerant Sensors or Switches ...............101
Servicing Optional Electric Heater ....................101
Servicing the Compressor Ground Fault Interrupter ..........101
Phase Voltage Monitor (PVM) ...........................101
Cleaning Option E Coated Coils .........................102
Service and Warranty Procedures ........................ 103
Replacement Parts....................................103
Scroll Compressor ....................................103
In-Warranty Return Material Procedure ....................103
Warranty Registration Form .............................104
Quality Assurance Survey Report ........................108
Appendix – Keypad/Display Menu Structure................ 110
IM 1125-7 • REBEL ROOFTOPS 2 www.DaikinApplied.com
Table of ConTenTs